Site Final | 12/24/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 12/24/2018 | 12/24/2018 | 12/24/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Aging Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 | | PASS |
Michael Zawacki
|
|
|
Home is complete. Track steer on site for landscaping.
|
Site Final | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | NR |
Andy J. Long
|
|
|
Home complete but not yet landcaped and gutter is dirty. Will monitor for stabilization and cleanup. BLD finaled and home is occupied.
|
Aging Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Complaint Inspection | 4/11/2018 | 4/12/2018 | 4/13/2018 | A | PASS |
Michael Zawacki
|
|
|
Talked to contractor onsite. They will have washout picked up today after drive and sidewalks finished.
|
BMP Violation | 10/27/2017 | 10/30/2017 | 11/1/2017 | A | FAIL |
Andy J. Long
|
|
|
check for dumped washout clean up and a new washout facility provided.
No new washout provided on site, pile of washout and material was not cleaned thoroughly. Loose dirt, cement dust, and other debris in gutter and moving in gutter westward. Need to sweep up ASAP.
2nd Correction request at site.
|
General Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 | A | FAIL |
Andy J. Long
|
|
|
Illicit washout. No washout provided. Washed out on lot and some slurry to gutter.
End of day clean and washout needs to be provided.
Sunroc is subcontractor.
|