Site Final | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Michael Zawacki
|
|
|
check for any temp BMPs/DI bags & stabilization. final if ready
|
General Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Michael Zawacki
|
|
|
Home and landscaping completed.
|
General Inspection | 12/20/2018 | 12/20/2018 | 12/20/2018 | | PASS |
Michael Zawacki
|
|
|
Driveway has been poured. Landscaping nearly completed and site is stable.
|
General Inspection | 12/5/2018 | 12/5/2018 | 12/7/2018 | | PASS |
Michael Zawacki
|
|
|
Driveway poured, work is on interior. All workers parking on street.
|
General Inspection | 11/5/2018 | 11/5/2018 | 11/6/2018 | | PART |
Michael Zawacki
|
|
|
Silt fence is warn and falling apart, some trackout from driveway onto sidewalk and apron. Yard is being prepped for landscaping.
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | | PASS |
Michael Zawacki
|
|
|
Landscape crews on site. Drive way is just dirt, no one parked on it. No ESC issues.
|
General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 | | PASS |
Michael Zawacki
|
|
|
Lot has been hydroseeded. No trackout at time of inspection, van is parked on dirt driveway.
|
General Inspection | 9/19/2018 | 9/19/2018 | 9/20/2018 | | PASS |
Michael Zawacki
|
|
|
Perimeter BMPs still in place. Some stucco work left, outside nearly completed. Crew running trench on edge of property to water meter. Site is contained.
|
General Inspection | 9/4/2018 | 9/4/2018 | 9/5/2018 | | PASS |
Michael Zawacki
|
|
|
Site is contained, large pile of landscape rocks on lot. Most exterior work completed.
|
General Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/2/2018 | 8/2/2018 | 8/2/2018 | | PASS |
Michael Zawacki
|
|
|
Work is on interior. Site is contained and free from trash. Paint or drywall mud has been washed out on dirt.
|
General Inspection | 6/18/2018 | 7/2/2018 | 7/3/2018 | A | PASS |
Michael Zawacki
|
|
|
Home is framed. Site is stable and clean. No trash or loose dirt.
|
General Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit sign posted. No violations observed.
|
Random Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PART |
Michael Zawacki
|
|
|
Lift being used on site, causing trackout.
|
Random Inspection | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Only work today is all staying on site. No vehicles will be going on or leaving site.
|
General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Michael Zawacki
|
|
|
Home area excavated and graded. Perimeter BMPs and entrance in place. No trackout onto road or sidewalk.
|
Site Preparation | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Michael Zawacki
|
|
|
9:30 AM Clayton Brooks 208 ###-#### Will install entrance and wattle along front, silt fence along side. Water will flow down towards the hill. Will sweep road and sidewalk at end of workdays.
|
General Inspection | 11/20/2018 | 11/20/2018 | | | |
Andy J. Long
|
|
|
|