Information based on query as of Sunday, June 2, 2024.
Permit Information
Permit NumberESC17-01688
StatusFinaled
Name HUNTER GOMEZ
Site Address 627 S ASH ST
Project NameAsh Street Townhomes
Customer Number 
ePlanReviewNo
Description
West Building: New multifamily development consisting of 34 total units, a small commercial space, and a carport. See also ESC17-01687
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/22/20191/22/20191/22/2019 PASS
DetailsAndy J. Long
see ESC 17-01687 for all remaining inspections for this site.
DOC - Permit Finaled1/22/20191/22/20191/22/2019PPASS
DetailsAndy J. Long
General Inspection1/3/20191/3/20191/3/2019 PASS
DetailsAndy J. Long
General Inspection12/13/201812/13/201812/13/2018 PART
DetailsMichael Zawacki
Met with RP while on site. Lined washout has ripped, some washout leaching out bottom. Trackout onto Ash St, has been cleaning at end of day.
General Inspection11/28/201811/28/201811/28/2018 PASS
DetailsMichael Zawacki
Site is contained. Will need to monitor for trackout, few trucks and trailers parking in site, all others on street parking.
General Inspection11/13/201811/13/201811/13/2018 PASS
DetailsAndy J. Long
WIP on vertical construction for condos. Site imporovements and new sidewalks going in on ROW on Ash and River. Storm drains have sediment protection. No trackout or discharges observed.
General Inspection10/29/201810/29/201810/29/2018 PASS
DetailsMichael Zawacki
Inspected 10/26. Site is clean, Ash st has been patched. Road work on river street. New lined washout built, foreman will make sure everyone used it.
General Inspection10/12/201810/12/201810/12/2018 PART
DetailsMichael Zawacki
Paved entrance is mud covered, will be cleaned. Inspected 10/11
Entrance only being used for deliveries, have permission to park in lot across street. Site drainage worked during rain event, no standing water. No trackout or discharges.
General Inspection9/27/20189/27/20189/27/2018 PASS
DetailsAndy J. Long
WIP on frame of apt buildings. Road work complete. Area has been swept. Approved
General Inspection9/11/20189/11/20189/11/2018 PEND
DetailsAndy J. Long
road work and stockpiles in ROW. Dry weather, no discharges. Entrance to River is blocked off. DI protected.

Folllow up scheduled on main site permit to check on post construction clean up of loose dirt.