Site Final | 11/8/2018 | 11/14/2018 | 11/15/2018 | P | PASS |
Andy J. Long
|
|
|
Work complete. No temporary sediment controls left in work areas along 8th Street, Freak Alley, Union Alley, and Capitol Blvd. ESC permit finaled
|
Site Final | 11/6/2018 | 11/7/2018 | 11/8/2018 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/6/2018 | 11/6/2018 | 11/6/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 9/4/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Andy J. Long
|
|
|
Area in front of bikelane and in crosswalks was swept up. New work occuring the west lane now. No new corrections.
|
General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Andy J. Long
|
|
|
Correction request:
Sweep up loose gravel and dirt on Idaho and Capitol Street. DI's have sediment protection the but the bike lane entrance and sidwalk /crosswalk areas need some maintenance/clean up.
Verbal correction request to RP Anthony.
|
General Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on street scape renovations on 8th Street between Idaho and Main. Recieving storm drains have sediment protection. No discharges or fugitive dust observed.
|
General Inspection | 3/20/2018 | 3/21/2018 | 3/23/2018 | P | PASS |
Andy J. Long
|
|
|
8th streetr & Union Block improvements
|
Site Preparation | 2/27/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Andy J. Long
|
|
|
2:30 PM with Guho Construction; meet at Idaho & 8th in front of Fork
Onsite meeting with Anthony, Tom, and Dave (?) with Guho Construction.
Phase 1 of project is linear project to replace curbing and install side walk improvements along 8th street between Main and Idaho. Next phase will be re-surfacing Union block alley and Freak Alley. Silva cells and improvements along east side of Capitol south of Main Street will also occur.
Storm drains have sediment filter bags installed on all inlets with work area. Other BMPs will be sweeping after temporary stockpiling, controlling concrete and paver cutting dust, and regular trash pickup. Reminded crew that all temporary DI bags installed for project must be removed.
Approved for construction.
|