Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberESC18-00069
StatusFinaled
Name ANTHONY GUHO
Site Address 798 W IDAHO ST
Project NameCentral District Renovation
Customer Number 
ePlanReviewNo
Description
see GRD permit for project description. install sediment protection on receiving storm drains, contain stockpiles and loose materials, perform regular sweeping and maintenance. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/8/201811/14/201811/15/2018PPASS
DetailsAndy J. Long
Work complete. No temporary sediment controls left in work areas along 8th Street, Freak Alley, Union Alley, and Capitol Blvd. ESC permit finaled
Site Final11/6/201811/7/201811/8/2018ACANC
DetailsAndy J. Long
rescheduled
General Inspection11/6/201811/6/201811/6/2018 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection9/4/20189/6/20189/6/2018APASS
DetailsAndy J. Long
Area in front of bikelane and in crosswalks was swept up. New work occuring the west lane now. No new corrections.
General Inspection9/4/20189/4/20189/4/2018PPART
DetailsAndy J. Long
Correction request:

Sweep up loose gravel and dirt on Idaho and Capitol Street. DI's have sediment protection the but the bike lane entrance and sidwalk /crosswalk areas need some maintenance/clean up.

Verbal correction request to RP Anthony.
General Inspection5/1/20185/1/20185/1/2018PPASS
DetailsAndy J. Long
WIP on street scape renovations on 8th Street between Idaho and Main. Recieving storm drains have sediment protection. No discharges or fugitive dust observed.
General Inspection3/20/20183/21/20183/23/2018PPASS
DetailsAndy J. Long
8th streetr & Union Block improvements
Site Preparation2/27/20182/28/20182/28/2018PPASS
DetailsAndy J. Long
2:30 PM with Guho Construction; meet at Idaho & 8th in front of Fork

Onsite meeting with Anthony, Tom, and Dave (?) with Guho Construction.

Phase 1 of project is linear project to replace curbing and install side walk improvements along 8th street between Main and Idaho. Next phase will be re-surfacing Union block alley and Freak Alley. Silva cells and improvements along east side of Capitol south of Main Street will also occur.

Storm drains have sediment filter bags installed on all inlets with work area. Other BMPs will be sweeping after temporary stockpiling, controlling concrete and paver cutting dust, and regular trash pickup. Reminded crew that all temporary DI bags installed for project must be removed.

Approved for construction.