General Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PASS |
Michael Zawacki
|
|
|
Yard is landscaped and stable. Small area of home near entrance needs to be finished. Fence company on site finishing.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | FAIL |
Andy J. Long
|
|
|
Home near completion, yard not yet landscaped. No hillside erosion issues.
Corrections needed:
Loose dirt and debris on sidewalk and in culdesdac in front of home, some with potential to flow directly to storm drain. No storm drain sediment protection installed. Unlined concrete washout used, not per ESC plan construction details. Washouts should be lined leakproof containers.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Most exterior work and stucco complete. Site is free from trash, Lots of old stucco laying around home.
|
General Inspection | 5/15/2018 | 5/17/2018 | 5/18/2018 | P | PASS |
Michael Zawacki
|
|
|
Follow up inspection. Wattle and gator guard installed on bottom of lot, gravel bag check dams installed. Sediment has been scraped and swept from intersection of Windsong. Sediment has stained pavement, looks much worse than it is, unable to scrape any more dirt off.
|
Random Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Post rain inspection. No ESC issues.
|
Site Preparation | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Michael Zawacki
|
|
|
Work has begun without site inspection. Currently there is a vegatation buffer. Excavator driven in and below road grade. Stabalized entrance will need to be installed when driveway is cut in.
|