General Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Andy J. Long
|
|
|
See ESC17-01687 for all remaining ESC inspections for project
|
DOC - Permit Finaled | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PEND |
Andy J. Long
|
|
|
Corrections in progress. See ESC17-01687
|
General Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | | PEND |
Andy J. Long
|
|
|
corrections in progress, site has multiple permits. No trackout. Need new south entrance or close gate.
|
General Inspection | 12/6/2018 | 12/6/2018 | 12/7/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/10/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Michael Zawacki
|
|
|
Work still on Ash St., flaggers are not allowing traffic. Stockpiles still on road.
|
General Inspection | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PEND |
Andy J. Long
|
|
|
WIP on road improvements and joint trench on Ash Street. Road closed to one lane. Receiving storm drain has sediment filter bag installed. No spills or leaks observed. Sweepers tracks on River Street are signs of clean up.
Follow up inspection scheduled for clean up of stockpiles and loose dirt in roadway
|
General Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Michael Zawacki
|
|
|
Water line being installed on ash st. Site is clean, road is dirty from utility work on ACHD right of way.
|
General Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Michael Zawacki
|
|
|
Foundations are poured and framing starting on some units. Backfill is scheduled to be placed next week, water truck will be on site. Workers are cleaning styrofoam insulation for foundations as they go. No trash on site, no dirt leaving site. Concrete washout is nearly full, will be cleaned after water evaporates.
|
General Inspection | 4/26/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Michael Zawacki
|
|
|
Currently working on grading. Site is below surrounding grade. Entire parcel is disturbed, currently no fugitive dust. Some stockpiles on site that are currently being moved. No dirt leaving site and no trackout.
|
Site Preparation | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PASS |
Michael Zawacki
|
|
|
Hunter--call 30 mins before, prefer early appt Phone #: ###-####. Prepping lot. Rear has curb and will not need watlle shown on plans. Dedicated entrance and exit with one way traffic flow will be on site. DIs protected. Will monitor as excavation begins.
|