Permit Information
Permit NumberESC18-00213
StatusFinaled
Name JOEY BENART
Site Address 4356 E PARKCENTER BLVD
Project Name12B, LOT 5
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/25/20197/25/20197/25/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled7/25/20197/25/20197/25/2019PPASS
DetailsMichael Zawacki
General Inspection8/24/20188/27/20188/27/2018APASS
DetailsAndy J. Long
Trash picked up, alleys where road mix was recently dumped have been swept. Projects have a concrete washout pit that is lined.
BMP Violation8/23/20188/24/20188/24/2018APASS
DetailsAndy J. Long
DI bags are now installed in alley ways behind projects. Most trash is contained. Concrete washout with lining is located on lot8- block 14. Needs to have a sign.

Corrections requested were completed. Request to Joey to have loose trash at foundation sites picked up and that sweeping should be done on sites that recently added road mix to driveways.
BMP Violation8/21/20188/22/20188/23/2018APEND
DetailsAndy J. Long
Verbal correction request to Joey with Blackrock via phone:

- install DI bags in alleys behind active construction in new phases at east end of the Blvd townhomes.
- remove DI bags from alleys that have all construction and landscaping complete
- post concrete washout sign at washout (apparently in a craw space area of a completed foundation.


- follow up inspection scheduled.
BMP Violation8/21/20188/22/20188/22/2018ACANC
DetailsAndy J. Long
General Inspection8/21/20188/21/20188/21/2018PFAIL
DetailsMichael Zawacki
locate blackrock washout for this phase.
No washout on site, no workers present. No inlet protection in alley or road, dirt tracked across inlets. Backfill spilling out onto sidewalk.