Permit Information
Permit NumberESC18-00309
StatusFinaled
Name SHELBY STROEBEL
Site Address 1745 N MOCKBEE PL
Project Name8-1 Sherman
Customer Number 
ePlanReviewNo
Description
Per Attached Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection4/26/20194/26/20194/26/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled4/26/20194/26/20194/26/2019PPASS
DetailsMichael Zawacki
BMP Violation11/30/201812/4/201812/12/2018ACANC
DetailsAndy J. Long
BMP Violation12/12/201812/12/201812/12/2018PPEND
DetailsAndy J. Long
WIP on clean up. No new trackout or discharges. Trash has been picked up. Gatorguard wattles re-aligned.

Washout pit has been cleaned out and re-excavated. Will need secure the lining so it contains washout.
Conference11/29/201811/30/201811/30/2018ADONE
DetailsAndy J. Long
830 AM site inspection with Canyon Crest GC Dave to discuss violations

Correction request:
- clean up all loose trash and discarded materials
- sweep and sidewalks in front of projects
- reviewed washout requirements. Clean up concrete and dried slurry.
BMP Violation11/29/201811/29/201811/29/2018PFAIL
DetailsAndy J. Long
Multiple violations:

- evidence of sediment runoff
- uncontained concrete washout next to sidewalk running off site
- wattles no longer staked/properly
- loose trash and debris all over site
- employees parking in mud behind homes leading to trackout.

Onsite compliance conferece requested for tomorrow AM
General Inspection8/23/20188/23/20188/23/2018PPASS
DetailsMichael Zawacki
Foundation completed, skid steer on site backfilling. Gator guard along perimeter. Sharing common access point with neighboring parcel.
General Inspection6/25/20186/26/20186/26/2018APART
DetailsAndy J. Long
Wattles to install along bottom of stockpile are now staged on site.

Correction:
- install wattles per specifications (gator guard wattles should be staked and backfilled)
General Inspection6/21/20186/22/20186/25/2018PCANC
DetailsAndy J. Long
follow up
General Inspection6/20/20186/20/20186/21/2018PPART
DetailsAndy J. Long
WIP on two adjacent Canyon Crest homes. 3rd lot being used for concrete washout, which is lined and away from sidewalk. Permit signs posted. No trackout.

Correction needed:
- install wattle or silt fence below stockpile to prevent runoff to washout and street.

Notified RP-GC Dave
General Inspection6/13/20186/13/20186/13/2018PPASS
DetailsMichael Zawacki
Site excavated and surrounded with gator guard. Material being stored on adjacent lot, was told permission was give by lot owner. Nothing leaving site.
Site Preparation6/6/20186/6/20186/6/2018PPASS
DetailsMichael Zawacki
Met with contractors on site. Will use gatorguard along perimeters and clean as needed. Have permission to store backfill in neighboring lot, may haul off site if needed. Were made aware neighbors are monitoring site.