Permit Information
Permit NumberESC18-00427
StatusFinaled
Name WILLIAM SHARP
Site Address 2121 N COLE RD
Project NameFairmont Junior High School
Customer Number 
ePlanReviewNo
Description
New stand alone building with gymnasium, locker rooms, kitchen, and cafeteria for the junior high's use.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/20/201910/4/201910/4/2019PPASS
DetailsMichael Zawacki
General Inspection9/20/20199/20/20199/20/2019 CANC
DetailsAndy J. Long
General Inspection8/20/20198/20/20198/20/2019PPASS
DetailsMichael Zawacki
Work on building completed. Area has been graded, still needs landscaping, no coverage.
General Inspection8/12/20198/12/20198/12/2019 PASS
DetailsMichael Zawacki
Exterior work completed, still needs to be landscaped.
Site Final7/8/20197/11/20197/11/2019PNR
DetailsMichael Zawacki
Not landscaped. Building completed.
Site Preparation6/17/20197/8/20197/8/2019PCANC
DetailsAndy J. Long
data entry error
General Inspection6/17/20196/17/20196/17/2019 PASS
DetailsAndy J. Long
WIP. Site access and staging is paved with onsite drainage. Landscaping and irrigation lines not yet complete. Trash contained.

Will need to remove all temporary BMPs and do final parking lot and perimeter cleanup for ESC site final. MS4 on Cole has sediment bag installed.

No corrections requested at this time. Follow up scheduled.
General Inspection5/17/20195/17/20195/17/2019 PEND
DetailsMichael Zawacki
3 Trucks parked in mud, everyone else on paved area, will track out.
Only exterior and landscaping remains.
General Inspection4/16/20194/16/20194/16/2019PPASS
DetailsMichael Zawacki
No workers parked in mud, all on paved street. SIte still needs landscaping, exterior of building complete.
General Inspection4/4/20194/4/20194/4/2019ACANC
DetailsAndy J. Long
General Inspection3/6/20193/6/20193/6/2019 PASS
DetailsMichael Zawacki
Work area contained. Was saw cutting in parking lot, not yet patched.
General Inspection1/30/20191/30/20191/30/2019 PASS
DetailsMichael Zawacki
Building shell complete, all work is on nside. Site is low spot, some standing water. No vehicles except lift operating in mud. Large lined washout, trackout will be only issue to watch for.
General Inspection12/21/201812/21/201812/21/2018 PEND
DetailsMichael Zawacki
Some trackout starting to come out of work area and onto parking lot road. Will need to watch so it doesn't end up on Cole. Few trucks in mud, shouldn't be parking in there. Talked to super intendent, will monitor. Sweeper scheduled for next week.
General Inspection11/20/201811/20/201811/20/2018PPEND
DetailsMichael Zawacki
Some trackout into parking lot, foreman said he will get a sweeper scheduled.
Bus turn around area completed, all work is by the new gym. Washout is starting to fill up, they plan on replacing soon.
General Inspection8/13/20188/13/20188/13/2018PPASS
DetailsMichael Zawacki
Parking lot is being prepped for paving, needs to be done before school begins on 8-20. Landscapers on site, have removed lots of perimeter wattle to get where they need. Will be replaced as needed when they are done in area.
Water truck on site, some dust is being kicked up by front end loader, will water in area.
New building will be fenced off when school begins.
General Inspection7/9/20187/9/20187/9/2018PPASS
DetailsMichael Zawacki
Water truck sprays down site, no dust. Rock entrance installed, no trackout to Cole. Wattles in place and buffer has been retained where possible.
Site Preparation6/4/20186/4/20186/4/2018PPASS
DetailsMichael Zawacki
Contractor is having Syman come back out and install wattle with overlap shown in plans. DIa protected on site. Work has begun on removal of old parking lot, old material is currently being stockpiled on site. Water truck will be brought to site as area becomes exposed.
SWPPP board at entrance, copy of permit displayed with all SWPPP info.