Site Final | 12/6/2019 | 12/6/2019 | 12/9/2019 | P | PASS |
Andy J. Long
|
|
|
Building complete, parking lot paved, frontage landscaped. No temporary storm drain protectionon Bethel to be removed. ESC permit finaled.
|
Random Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | | PASS |
Michael Zawacki
|
|
|
Curbing and sidewalks completed. Sewer work on Betherl and site, some trenching. Parking lot not paved yet.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | | PASS |
Michael Zawacki
|
|
|
WIP, site is below grade, no issues.
|
General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Structure is up, but no parking lot of vegetation. Road not patched from water line work. No trackout or discharges.
|
General Inspection | 6/18/2019 | 6/18/2019 | 6/18/2019 | | PASS |
Michael Zawacki
|
|
|
Shell completed. Site is all below grase, stabalized entrance installed. No trash or dust.
|
General Inspection | 4/30/2019 | 4/30/2019 | 5/1/2019 | | PASS |
Michael Zawacki
|
|
|
Metal building is up. Construction entrance in place. Will need to watch for mud when rains.
|
General Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Andy J. Long
|
|
|
No trackout or other violations observed, rock construction entrance is installed. Clean job site. Vertical construction in progress. Approved.
|
General Inspection | 11/26/2018 | 12/13/2018 | 12/19/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. Construction entrance installed. No trackout. Workers using entrance. No corrections requested.
|
Random Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 | A | PASS |
Andy J. Long
|
|
|
WIP. Equipment staged within lot. No trackout. Disturbed area now has road mix prepped . Bethel road surface is above grade of parcel. No stormwater infrastructure on street.
|