Site Final | 7/5/2019 | 7/9/2019 | 7/10/2019 | A | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. No ESC requests. Permit finaled.
|
General Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2019 | 6/20/2019 | 6/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2019 | 6/5/2019 | 6/5/2019 | | PASS |
Michael Zawacki
|
|
|
Home is completed and landscaped. Wattle was thrown into lined channel behind home. No sign of any water or dirt flowing into neighbors yard.
|
Complaint Inspection | 5/21/2019 | 5/21/2019 | 5/22/2019 | P | PEND |
Andy J. Long
|
|
|
Complaint regarding runoff onto adjacent property.
Crews are completing landscaping and installing an additional drainage to prevent runoff.
Home has not had final hillside drainage inspection/approval. WIP.
|
General Inspection | 5/20/2019 | 5/20/2019 | 5/20/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, still needs landscaping.
|
Complaint Inspection | 5/2/2019 | 5/2/2019 | 5/8/2019 | P | PEND |
Andy J. Long
|
|
|
adajacent homeowner concerned about grading of backyard directing runoff into their yard. Refered complaint to PW hillside and drainage engineer. No ESC violations.
|
General Inspection | 5/1/2019 | 5/1/2019 | 5/1/2019 | | PEND |
Andy J. Long
|
|
|
Home exterior complete, but slopes around home are not yet landscaped or vegetated. Temporary perimeter controls installed
|