Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberESC18-00893
StatusFinaled
Name JAYSEN PORTER
Site Address 3711 S COUNCIL SPRING RD
Project NameCouncil Springs Apartments
Customer Number 
ePlanReviewNo
Description
11 unit Apartment building. Construction entrance required. Preserved perimeter vegetation. Site preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/27/20202/4/20202/4/2020PPASS
DetailsMichael Zawacki
General Inspection1/27/20201/27/20201/27/2020 CANC
DetailsAndy J. Long
General Inspection12/10/201912/10/201912/10/2019 PASS
DetailsMichael Zawacki
Landscapers on site and are supposed to be finished today. Parking lot scheduled to be cleaned and striped. All trash is stored in garage.
Only work remaining is to do carports.
General Inspection10/25/201910/25/201910/25/2019 PASS
DetailsMichael Zawacki
Site is clean, trash box needs to be emptied soon.
General Inspection9/9/20199/9/20199/9/2019 PASS
DetailsMichael Zawacki
Landscaping walls alonge perimeter, still nees grass or stabilization. No esc issues
General Inspection7/25/20197/25/20197/25/2019PPASS
DetailsMichael Zawacki
Masonary work in progress. Site still needs landscaping. Trash box in use and contained.
General Inspection7/3/20197/3/20197/3/2019 PASS
DetailsMichael Zawacki
Inspected 7-2. Site is contained but not stabalized. Work is on interior.
BMP Violation5/3/20195/15/20195/14/2019APASS
DetailsMichael Zawacki
Stucco crew finished. Parking area cleaned and being prepped for paving. Majority of trash picked up.
General Inspection5/3/20195/3/20195/3/2019 PART
DetailsMichael Zawacki
Message sent to RP.
Lots of small loose trash around site. Stucco area is a mess.
Follow up scheduled.
General Inspection12/13/201812/13/201812/13/2018PPASS
DetailsMichael Zawacki
One worker on site using mini excavator to move backfill back into foundation. Lined washout has been used on site. Foundation is poured. No current ESC issues.
General Inspection10/31/201811/1/201811/1/2018PPASS
DetailsAndy J. Long
WIP on foundation excavation. RP on duty. Permit posted. No corrections requested. Approved.
BMP Violation8/17/20188/20/20188/20/2018PPEND
DetailsAndy J. Long
follow up inspection

Site currently inactive. No new violations. Will continue to monitor and check for additional BMP installation.
Complaint Inspection8/17/20188/17/20188/17/2018AFAIL
DetailsAndy J. Long
No activity at time of inspection. Crew has been installing stormwater system this week

Met project manager Andy with Core Building. Issued warning about Site Preparation Inspection requirement. Next time Core will get fined if Site Prep not completed.

Corrections requested:
- repost ESC permit signs, 1 on south entrance and one on the Greenbelt.
- water truck is required for dust control. Must be onsite.
- sweep gutter at end of work day today.
- construction entrance should be installed after stormwater bed is covered/stabilized.



Receiving storm drain has existing DI bag installed, it is 1/4 full and cemented into the curb. Request to prevent trackout and dirt on roadway by daily sweeping. Recommended writing that into subcontractor contracts.

Follow up inspection scheduled 8/20