Site Final | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 9/27/2019 | 9/27/2019 | 9/30/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Home completed, lot needs trash picked up and landscaping.
|
BMP Violation | 1/2/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Andy J. Long
|
|
|
follow up to correction request
Sidewalk has been swept as requested. Trash mostly contained. Receiving storm drain has sediment protection. Approved.
|
BMP Violation | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- pick up all loose trash and put in trash container - sweep sidewalk, gutter, and street in front of the two projects by Harding Homes.
Verbal corrections issued to RP-GC Gene. Note: Young Meadow onsite contact is Ron. Follow up scheduled 1/7
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Working on framing. Trash box in front and site is clean. 1 of 2 homes under construction.
|