Site Final | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Andy J. Long
|
|
|
Work complete. BLD permit finaled. Stormwater retainined on WPS site. No offsite BMPs to be removed. ESC permit finaled, no ESC requests.
|
General Inspection | 5/21/2020 | 5/21/2020 | 5/21/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/20/2020 | 4/20/2020 | 4/21/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2020 | 3/19/2020 | 3/20/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/17/2020 | 2/17/2020 | 2/19/2020 | | PASS |
Michael Zawacki
|
|
|
Still has large bare area, all contained.
|
General Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | | PASS |
Michael Zawacki
|
|
|
Inspected 1/15. No activity, sit was frozen and snow covered.
|
General Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | | PASS |
Andy J. Long
|
|
|
Leaking washoout was removed some site and area cleaned. Added secondary containment around above ground washouts as new policy.
|
General Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | | PASS |
Michael Zawacki
|
|
|
Still some stockpiles and landscaping not finished.
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Work completed. Will monitor until spring for stbalization.
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/20/2019 | 8/20/2019 | 8/20/2019 | | PASS |
Michael Zawacki
|
|
|
Perimeter road around addition paved. No growth in any of seepage beds. Large stockpile in front, west side has growth, east is fresh and bare. In front of addition is all graded and bare, no landscaping or stabalization. Parking lot work is completed.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work completed. Road and parking lot paved. All backfill staying on site for WPS track, currently has growth and is stabalized.
|
Site Preparation | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Michael Zawacki
|
|
|
.WIP on new parking lot. Water truck on site, no dust, everything contained.
|
General Inspection | 5/21/2019 | 5/21/2019 | 5/22/2019 | | PASS |
Michael Zawacki
|
|
|
Crrws now grading area around new completed expansion. Road still needs to be paved. Backfill will be used for motocross.
|
General Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior work completed. No trackout to broadway. Large stockpiles on site, area is below grade.
|
General Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Michael Zawacki
|
|
|
Did site walk with foreman. Entrance needs to be feshened up, currently frozen solid. Site is in sump, no water or dirt leaving site.
|
General Inspection | 1/10/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is all below grade and holds water. Large lined washout on site. Long entrance, starting to pump through, needs to be refreshed. Met woth foreman and he will take care of entrance and clean any trackout. Backfill on site and being used for WPS mx track.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Andy J. Long
|
|
|
Construction entrance, lined large capacity washout, a perimeter sediment control wattles are installed. NO trackout or discharges observed.
Posted ESC permit sign at entrance. No corrections requested. Will need to maintain construction entrance soon. Follow up scheduled.
|
General Inspection | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Michael Zawacki
|
|
|
Work hasn't begun.
|