DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/9/2019 | 12/9/2019 | 12/10/2019 | | PASS |
Michael Zawacki
|
|
|
Work completed, DI bags around area need to be pulled.
|
General Inspection | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Framing crew on site. Area is trash free,m will need to watch bigger pieces of cover from blowing away. Truck on site hauling out fill,m no trackout. Few 24" sono tube installed for street lamps. ill need to watch for washout when concrete work done.
|
Conference | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Michael Zawacki
|
|
|
Updated permit to add Jill Jenkins as RP
|
BMP Violation | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | FAIL |
Michael Zawacki
|
|
|
No washout on site, washout for wall along warm springs was dumped on pile of backfill. Sent picture to Jill Jenkins, she will have them get it taken care off. Need to update project to add her as RP for site.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Storm drain sediment protection, construction entrance installed, and permit posted.
No corrections requested.
|
General Inspection | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PART |
Michael Zawacki
|
|
|
Site needs new entrance and washout. Message sent to RP.
|
General Inspection | 3/20/2019 | 4/3/2019 | 4/4/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is excavated below grade. Perimeter BMPs on sidewalk on warm springs side, area excavated for seepage beds. Washout on site, entrance needs to be maintained. Lrge stockpiles on site, wil need to be addressed if idle for more than 2 eeks.
|
Site Preparation | 3/19/2019 | 3/29/2019 | 3/28/2019 | A | FAIL |
Andy J. Long
|
|
|
check on site status, RP was to call for site prep
Site prep completed previously. NO new work has occured, but no new construction entrance as requested.
|
Site Preparation | 3/20/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Andy J. Long
|
|
|
Site meeting with project manager Kurt. RP contacts are also Scott and Jill. Kurt also working on Aspen Valley.
-permit sign posted. - perimeter has sidewalk and landscaping already installed, site is below grade of surrounding areas. Just need to keep sidewalks clean, no stockpiling on sidewalk - correction request to do maintenance on construction entrance. Add angular or crushed 1.5"-3" rock - lined pit method of concrete washout will be used. - onsite stormwater swale is being installed. Will protect with wattles once complete
|
Complaint Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Andy J. Long
|
|
|
trash complaint received through code enforcement
No loose trash observed on site. Significant construction activity and wind in area is an issue. Harris Ranch landscape crew was picking up trash in common areas along Warm Springs bypass.
. Work is now underway removing stockpile. No violations. Spoke with listed RP Scott to request site preparation when set up.
|
Site Preparation | 11/26/2018 | 11/26/2018 | 11/27/2018 | P | PASS |
Michael Zawacki
|
|
|
Work hasn't begun. Parcel still being used as storage for aspen valley.
|