General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
BMP Violation | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Andy J. Long
|
|
|
Site cleaned up. Sidewalks and gutters swept, trash removed. Will need to properly contain all new trash generated.
|
BMP Violation | 3/18/2019 | 3/26/2019 | 3/28/2019 | A | PASS |
Andy J. Long
|
|
|
Streets and sidewalks were swept. Inlet fabic installed on Hilton and trash has been picked up around sites.
Site is still on warning for more frequent housekeeping.
|
Conference | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | DONE |
Andy J. Long
|
|
|
Onsite meeting with RP/GC Vince.
Sidewalk and gutter was swept, filter fabric install in storm drain, and trash picked up.
Still alot of loose dirt on sidewalk and street.
Correction request to have street sweeper sweep guttters and re-sweep sidewalk.
|
Conference | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | FAIL |
Andy J. Long
|
|
|
Multiple violations at site. Unable to meet contractor RP at site. See corrections listed in previous inspection.
|
Complaint Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | FAIL |
Andy J. Long
|
|
|
Loose dirt and debris all around site.
Correction request sent via text to RP Vince: - sweep all sidewalks, gutter, and common drive
Meeting onsite scheduled for tomorrow AM
|
General Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of boot trackout onto sidewalk and street. Needs to be swept.
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | FAIL |
Michael Zawacki
|
|
|
No concrete washout, trucks were cleaning into unlined hole. Trackout from concrete trucks.
|