General Inspection | 2/13/2020 | 2/13/2020 | 2/13/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/29/2020 | 1/29/2020 | 1/30/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/14/2020 | 1/14/2020 | 1/14/2020 | | PASS |
Michael Zawacki
|
|
|
OK to close when bld closed
|
General Inspection | 12/27/2019 | 12/27/2019 | 12/27/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/27/2019 | 11/27/2019 | 11/27/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior completed and lawn landscaped.
|
General Inspection | 11/8/2019 | 11/8/2019 | 11/8/2019 | | PART |
Michael Zawacki
|
|
|
Exterior work completed. Front is dirty with old stucco and debris, mini excavator at site.
|
General Inspection | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | | PART |
Michael Zawacki
|
|
|
Exterior completed. Lots of dumped stucco around home, all contained to site.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
House has scaffolding and is prepped for stucco. No stucco mixer on site. Some random trash around site, nothing major and nothing blowing.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Owner talked to George and got RP situation resolved, George will be RP. Street was cleaned, washout and trash removed. Called techs and let them know to lift hold.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Michael Zawacki
|
|
|
|
BMP Violation | 8/27/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Michael Zawacki
|
|
|
Nothing done to clean site. Will issue parcel hold and request reinspection.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | FAIL |
Michael Zawacki
|
|
|
shout has beendumped on ground, dirt in gutter and road. Message sent to RP, follow up scheduled.
|
General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Capitol paving and gas company both on site. Looks like driveway is being prepped, lot bare. Nothing leaving site.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Gatorguard protecting perimeter. Lots of lumber scraps on lot.
|
General Inspection | 6/17/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Trash box on site and used. All word scraps in pile. Lots of lumber on sie.
|
General Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PEND |
Michael Zawacki
|
|
|
WIP on hooking up water. Some trackout from ini excavator. Have plumbing inspection scheduled for later this afternoon.
|