General Inspection | 6/25/2020 | 6/25/2020 | 6/25/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/10/2020 | 6/10/2020 | 6/10/2020 | | PASS |
Michael Zawacki
|
|
|
Will continue to monitor for revegetation and rilling.
|
General Inspection | 5/26/2020 | 5/26/2020 | 5/26/2020 | | PASS |
Michael Zawacki
|
|
|
Grass planted along driveway. Some dirt and rilling still on hillside.
|
General Inspection | 5/7/2020 | 5/7/2020 | 5/11/2020 | | PASS |
Michael Zawacki
|
|
|
Hillside still needs to be vegetated.
|
General Inspection | 4/21/2020 | 4/21/2020 | 4/21/2020 | | PASS |
Michael Zawacki
|
|
|
Upper area along driveway has been tackified. Hillsides still bare.
|
General Inspection | 4/3/2020 | 4/3/2020 | 4/7/2020 | | PASS |
Andy J. Long
|
|
|
Reviewed homeowners plan to complete revegetation & stabilization.
- finish all site drainage features per the approved grading and drainage plan - hydroseed disturbed slope areas along Cartwright road. Remove loose dirt on sage brush and living vegetation; repair slopes with visible erosion damage/rake out rills
- hydroseed triangular area between driveway, parking area and Cartwright. Recommend doing some soil prep and topsoil spread, area is compacted. - homeowner is fencing in backyard and will finish landscaping over time - homeowner/builder should review hillside development revegetation and erosion control standards, 11-7-08 subsection 5 C
|
General Inspection | 3/18/2020 | 3/18/2020 | 3/18/2020 | | FAIL |
Michael Zawacki
|
|
|
Work has started on fence. Lot of area disturbed on hillside above cartwright, new rills forming.
|
General Inspection | 3/3/2020 | 3/3/2020 | 3/4/2020 | | PASS |
Michael Zawacki
|
|
|
Hillside along cartwright still needs to be stabalized.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/6/2020 | | PART |
Michael Zawacki
|
|
|
Steep hillside along cartwright bare and has no BMPs
|
General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Michael Zawacki
|
|
|
Driveway poured and home exterior completed. Hillside above Cartwright still not repaired or stabalized. ZNot landscaped along driveway.
|
General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is clean, all wood scraps going into trailer on site. No loose or blowing trash. Hillside where water came up still bare. Los of dust when driving into site, no dust otherwise.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation has been poured and washout used. No dirt has run down hill to road, area of hill was disturbed to run sewer. Water has been hooked up and used for dust control. All materials stored up on site.
|
General Inspection | 6/6/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Michael Zawacki
|
|
|
Hillside is not disturbed, excavation is right to edge and there is no BMPs. Excavation for home has begun, backfill on site. No concrete washout installed.
|
Site Preparation | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Andy J. Long
|
|
|
Reviewed ESC plan with RP. Crew in process of installing rock construction entrance on existing site access. Building pad is flat. Will preserve the vegetated bank and earthen berm along the edge everywhere exempt where house and water line come in from Cartwright.
Will install lined concrete washout. Approved to start. RP-GC Lloyd to be onsite daily.
Follow up scheduled.
|