General Inspection | 6/30/2020 | 6/30/2020 | 7/1/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/13/2020 | 5/13/2020 | 5/18/2020 | | PASS |
Michael Zawacki
|
|
|
No new activity, sites starting to overgrow.
|
General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | | CANC |
Michael Zawacki
|
|
|
|
Random Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Andy J. Long
|
|
|
No activity. No trackout or dirt leaving site
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity, prep and joint trench looks completed, some stockpiling of material in rear of site.
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Crew on site boring under road. No new construction activity on site.
|
General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity at site, prep work done. Some stockpiles, site is bare, portable toilet has been knocked over.
|
General Inspection | 7/8/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Michael Zawacki
|
|
|
ACHD chipsealing neighborhood. Utilitie installation looks completed, no trenches on sites. No trash or blowing dust.
|
General Inspection | 6/17/2019 | 7/2/2019 | 7/8/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Will need to install construction entrance or pave shared driveways before starting foundations.
|
Site Preparation | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Andy J. Long
|
|
|
call RP Sam to give ETA
Permit sign posted, DI bags installed on receiving drains west on Irving. RP will oversee concrete washout installation. After driveway dig out, excavator to install rock construction entrance.
|