Site Final | 6/2/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Andy J. Long
|
|
|
Project complete. No temp BMPs to remove. Area stabilized
|
General Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 5/8/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Work looks completed. Some pallets of stone on driveway, lot still needs to be landscaped.
|
General Inspection | 4/30/2020 | 4/30/2020 | 5/8/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/25/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Andy J. Long
|
|
|
Sweeping conducted on driveway and sidewalk.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PART |
Andy J. Long
|
|
|
No trackout, discharges or spill observed. Posted ESC permit sign in front of project and notified RP about requesting signs and site preparation inspections.
Correction request: - sweep gutter, sidewalk and driveway to prevent dirty runoff from impervious surfaces.
Followup scheduled
|
BMP Violation | 11/15/2019 | 11/18/2019 | 11/21/2019 | A | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | FAIL |
Andy J. Long
|
|
|
Dirt in gutter, no BMPs installed, no permit sign visible from road
|