Permit Information
Permit NumberESC19-01166
StatusIssued
Name CARL FUNK
Site Address 7761 W CRESTWOOD DR
Project NameRidgeline Townhomes
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/31/20207/31/20207/31/2020 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection1/2/20201/8/20201/10/2020PFAIL
DetailsMichael Zawacki
Mud tracked out from forklift.
Rp notified, follow up scheduled.
General Inspection1/2/20201/2/20201/2/2020PFAIL
DetailsAndy J. Long
Mud and dirt on gutter, sidewalk and street. Loose trash/uncontained trashpile at site. $55 re-inspection has not been paid.

Notified Carl of the following corretions:
- pick up trash, build trash container. Was notified the trash trailer was stolen from site a few weeks ago
- clean up sidewalk & gutter. Scrape mud out of gutter with shovel; sweep street
- pay $55 fee

Carl agreed to complete corrections. Follow up next week.
General Inspection11/13/201911/14/201911/14/2019PPEND
DetailsAndy J. Long
fees not yet paid. Parcel hold still in effect until re-inspection fee for dumped concrete washout is settled
BMP Violation11/6/201911/8/201911/8/2019PPART
DetailsMichael Zawacki
Cleaned and new lined washout. Fee not paid.
BMP Violation11/5/201911/6/201911/6/2019APEND
DetailsAndy J. Long
RP notified of parcel hold and reinspection fee assessed for the dumped washout.

Need to pay fee, clean up dumped washout, and install a lined or leakproof washout containment.
General Inspection10/22/201911/6/201911/5/2019AFAIL
DetailsMichael Zawacki
Washout dumped on pile of backfill next to Glenwood. Second time washout has been dumped at site.
Silt fence not removed from above canal.
Talked to Craig while at site, will send pics to RP.
BMP Violation10/18/201910/21/201910/22/2019PPASS
DetailsAndy J. Long
call Carl to schedule

Dumped concrete washout cleaned. Site walk through conducted with RP-GC Carl. Site already has sand window swales installed on the south side of development behind the new townhomes, they are covered with geotextile from protection.

Storm drain at corner of Crestwood & Glenwood has sediment protection.

RP to install new washout for upcoming flat work, which is to occur after backfill is put back around the foundations.
BMP Violation10/18/201910/18/201910/18/2019PFAIL
DetailsAndy J. Long
Uncontained concrete washout occuring at this site.

Correction:
- install concrete washout by Monday
- site inspection with Inspector on Monday PM.

Caught by BLD inspector
Site Final7/31/20208/17/2020 P 
DetailsAndy J. Long