INSP-Final Inspection | 2/4/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Sprinkler Rough-in | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Forward Flow test passed. TVFP is providing a more permanent solution for yearly testing.
coordinate forward flow of the back flow with Troy Nelson Phone #: ###-#### >> Inspection requested via web by Christophe Wilson
|
INSP-Final Inspection | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Tim Frost
|
|
|
Performed tamper and flow tests. All ok
Looked at basement. ok
Walked around spot checking sprinklers. ok
*** They need to add signs to the risers which will need to be coordinated with fire alarm.
*** They need to perform a forward flow test.
This is inspection for TCO at Phase 1 as directed by General Contractor. Please call Lonnie with Time frame. Will include tampers flows and dry system trip test to put all fire sprinkler systems in service. Phone #: ###-#### >> Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for levels 1, 2 and 3 are complete.
Coordinate Hydro with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids on level 1 complete, approved for cover.
Please coordinate inspection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro for the 4th and 5th floors witnessed with no visible loss at the guages.
Please coordinate hydro with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PART |
Jim Page
|
|
|
Hydrostatic test for standpipe 1 and 2, basement wet system and dry system witnessed, no pressure loss observed at riser provided gauges.
dry Coordinate inspection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Supply line flush | 9/17/2018 | 9/20/2018 | 9/20/2018 | A | PASS |
Tim Frost
|
|
|
Coordinate Fire Service flush with Lonnie Greenfield Phone #: ###-#### >> Inspection requested via web by Christophe Wilson
___________________
Flush was ok
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Jim Page
|
|
|
this is an underground hydro. Lonnie is our foreman Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
I also looked at the underground in the parking garage. All was ok. Hydro of underground OK.
|
INSP-Sprinkler Rough-in | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located in level 1 condos complete, level 1 condos approved for cover. Fire sprinkler pipng for trash shutes approved for cover as well.
First Floor Rough in Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for uderground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above drop down ceilings in apartments complete, level 5 drop down ceiling in apartments approved for cover.
on level 5 completecover inspection Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardids on levels 4 and 5 complete, approved for cover.
Cover inspection for 4th ; 5th Floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids on levels 2 and 3 complete, hardlids on levels 2 and 3 approved for cover, drop in ceilings will be inspected at a later date.
Coordinate Inspection With Lonnie Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | CANC |
Jim Page
|
|
|
Wrong FIR permit called in, verified with Mike Phone #: ###-####, this request is cancelled.
|