INSP-Final Inspection | 1/21/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Contact Leroy Anderson ###-#### 30 Min prior to Fire Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Troy Cobbley
|
|
|
The additional hangers have been added. Will verify the 4 way brace at the riser during the final. All piping can be covered. Still need submittals verifying the calculations still work and all of the final items such as tags, signs, fire alarm panel.
|
INSP-Sprinkler Rough-in | 11/12/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Troy Cobbley
|
|
|
The rough-in for the most part is passed. It appeears additional hangers are needed for the cpvc piping. Also as-builts need to be approved showing all of the additional fittings that have been added including the two 90's at the base of the riser and the 90's added on the cpvc piping grid lines.
Contact Scott Powada ###-#### 30 min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | CANC |
Troy Cobbley
|
|
|
Can't perform final until a rough-in inspection has been performed. As per previous inspection note the ceiling tile needs to be removed so that the piping can be inspected.
Contact Scotty Powada ###-#### 30 min prior to Fire Final Insp Start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2018 | 8/22/2018 | 8/22/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Contact Scott Powada ###-#### 30 min prior to RTC Hydro Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 8/16/2018 | 8/21/2018 | 8/21/2018 | P | CANC |
Jim Page
|
|
|
Contact Scott Powada ###-#### 30 min prior to RTC Hydro Insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | FAIL |
Jim Page
|
|
|
Phone number provided was not the correct point of contact, building is locked and secure with no access, inspection will need to be rescheduled.
Contact Brad Westbrook ###-#### 30 min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled when ceiling tile has been removed
Contact Scott Powada ###-#### 30 min prior to RTC Insp Start please, he would like to schedule at the same time as the UG RTC.
Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Supply line flush | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | CANC |
Troy Cobbley
|
|
|
Contact Scotty Powada 30 Min prior to Flush Start, Suez water would like to t schedule for 10:30 AM of possilbe...
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|