INSP-Final Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Johnathon Phone #: ###-####
|
INSP-Supply line flush | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PART |
Jim Page
|
|
|
Rough to cover iospection for overhead fire sprinkler piping/tenting in units 102 and 112 complete, approved for cover.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting/insulation complete in units 106, 108, 110, 202 and 204, approved for cover.
johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | FAIL |
Jim Page
|
|
|
Insulation below the attic deflectors in numurous locations, insulation needs to be raised above the deflector around all of the atic heads to include truss pockets next along the upright protection.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/8/2019 | 2/8/2019 | 2/8/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection is complete, cover is not approved until the insulation is installed and a follow up inspection is performed to verify attic coverage is still correct.
|
INSP-Sprinkler Rough-in | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | CANC |
Troy Cobbley
|
|
|
No city approved plans on site, no inspetion. Johnathon Phone #: ###-####
|