Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberFIR18-00716
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2180 S HUDSON AVE
Project NameSkyline Apartments Bldg C
Customer Number 
ePlanReviewYes
Description
Shilo will install a new fire sprinkler system into the new apartment building per NFPA 13R, 2016, and the City of Boise.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/9/20195/15/20195/15/2019APASS
DetailsJim Page
Previously noted item has been corrected, final fire sprinkler inspection is complete.

Austin Farnworth is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection5/1/20195/2/20195/2/2019PFAIL
DetailsTroy Cobbley
need the interconnections with the fire alarm tested. Need ceiling at the ground floor north apartment repaired. All other areas the work appears complete.


Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/11/201812/12/201812/12/2018ADONE
DetailsJim Page
Hydrostatic test for level 2 completed with anit-freeze, no pressure loss observed.

Gerarrdo is the contact and he would like a hydro on the 2nd floor. please. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/4/201812/4/201812/4/2018PPART
DetailsJim Page
Hydrostatic test for levels 1 and 3 witnessed, no pressure loss observed at riser gauges, hydro was completed with glycerine anitfreeze. Level 2 to be completed at a later date.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/4/201812/4/201812/4/2018APART
DetailsJim Page
Tenting inspection complete for level 3, level 3 overhead fire sprinkler piping approved for cover. Where piping crosses breezeway freeze protection will be required, rough in will not be signed off until freeze protection is inspected.
INSP-Sprinkler Rough-in11/27/201811/28/201811/28/2018APART
DetailsJim Page
Tenting inspection for overhead fire sprinkler piping on level 3, 2 north units complete, approved for cover, remaining units on level 3 still require tenting to be installed and inspected.

Gerarrdo is the contact. he would like a rough to cover on the 3rd floor. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/21/201811/26/201811/26/2018AFAIL
DetailsJim Page
Cover material was installed before tenting inspection of fire sprinkler piping was complete, as noted before cover is not approved until tenting inspection is complete and passed, cover material installed needs to be removed on level 3 for tenting inspection to be performed correctly.

3rd floor and contact is Gerarrdo. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/26/201810/29/201810/29/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on levels 1 and 2 complete, levels 1 and 2 approvbed for cover. Rough in inspection for level 3 complete, tenting still needs to be installed, level 3 not approved for cover.

Phone #: ###-#### Inspection requested via web by Stan Beus