[Skyline Apartments Building B]
The fire sprinkler scope of work consists of installing a new fire sprinkler system into a new three level apartment building per NFPA 13R, 2016, and the City of Boise. The system has floor control valves, residential sprinklers and CPVC piping.

• The underground piping is under permit FIR18-00545

[BLD17-04624]
(Building B) (SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 Units) PLAN MOD RELOCATE WASHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1-hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/31/20195/31/20195/31/2019PPASS
DetailsJim Page
Final underground supply inspection complete.
INSP-Final Inspection5/1/20195/2/20195/2/2019PFAIL
DetailsTroy Cobbley
Need the interconnection with the fire alarm system tested and balcony ceilings installed. Walk through of the apartments passed..

Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/10/20191/10/20191/10/2019PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed with anti-freeze, no pressure loss observed at riser gauges.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/8/20191/9/20191/9/2019APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/4/20191/7/20191/7/2019APART
DetailsJim Page
Tentin in Unit B-HC level 3 has been corrected, Unit B-HC level 3 approved for cover, remaining level 3 to be inspected at a later date.

3rd floor tinting. Gerarrdo is the contact. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/28/201812/28/201812/28/2018APART
DetailsJim Page
Rough to cover inspection for overehad fire sprinkler piping/tenting on north apartment units complete, approved for cover except unit B-HC on level 3, mentioned unit cannot be covered due to tenting issues.
INSP-Sprinkler Rough-in12/27/201812/28/201812/28/2018AFAIL
DetailsJim Page
Unit B-HC level 3 has exposed piping in the attis space where tenting was not installed correctly.

2nd half inspection. Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/26/201812/26/201812/26/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in north apartments levels 1 and 2 complete, approved for cover. Level 3 inspected but no tenting installed, no cover allowed for level 3.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus