INSP-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PART |
Jim Page
|
|
|
Final inspection for scope of work has been performed, install is code compliant, permit will remain in issued status until School District AES (FIR18-00225, instructed by Boise Fire to not final any FIR permits associated with addresses that have an open permit for AES) communicator is inspected and passed. After AES is completed then an inspection request will need to be made to final this permit.Please call Clarence a couple of hours before heading out. No one is on site.
Thank you Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 6/3/2019 | 6/5/2019 | 6/5/2019 | P | FAIL |
Troy Cobbley
|
|
|
I called the contact number twice but could not leave a message due to voice mail being full. I went to the project site and spoke to school superintendant but did not make contact with the sprinkler contractor. No inspection performed.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Conference | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | DONE |
Troy Cobbley
|
|
|
After confering with Adele and Ron a 200lb hyro test and a 24 hour air test will be required prior to a final sign off. I will need to have the installation guide for the Nitrogen Generator to verify maximum leakage allowed as well.
|
INSP-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PART |
Troy Cobbley
|
|
|
We tested the new dry pipe valves which passed. The nitrogen gererator is installed but is cycling excesivly as per discussion with the sprinkler contractor. I have contacted my supervisory and the fire dept for guidance.
Phone #: ###-#### Inspection requested via web by Chris Gregory
|
INSP-Sprinkler Rough-in/Hydro | 12/13/2018 | 12/14/2018 | 12/14/2018 | P | CANC |
Jim Page
|
|
|
Inspection rescheduled for 17DEC2018 per conversation with point of contact. This request is cancelled.
Please call chris felty Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|