INSP-Final Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Jim Page
|
|
|
Previoulsy noteed items have been corrected, final fire sprinkler inspection complete.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 3/19/2019 | 3/21/2019 | 3/21/2019 | P | FAIL |
Jim Page
|
|
|
Escutcheon does cover entire hole from sprinkler penetration in numerous areas. Exposed CPVC from backflow to riser needs to be changed, cannot have exposed CPVC. Provide 911 signage on fire bell. Irrigation shutdown not wired correctly.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Jim Page
|
|
|
Overhead fire sprinkler piping/tenting inspection complete, all tenting installed at time of inspection, cover is approved.
Tenting inspection, confirmed complete and ready for inspection. Please let Alicia know if there are any issues. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | FAIL |
Jim Page
|
|
|
All tenting not installed at time of inspection.
Tenting Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed with anti-freeze, no pressure loss observed.
|
INSP-Sprinkler Rough-in/Hydro | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, piping located between conditioned spaqces approved for cover, tenting is required before cover in areas where piping is in attic spaces.
Call Alicia before heading out, will be ready early. This is up off Bogus Basin Rd. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|