INSP-Final Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Troy Cobbley
|
|
|
The second group (six) of apartments to the north of the central breeze sprinkler work is complete.
Gabe Garduno is the contact for this final inspection. We appreciate your help, thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Troy Cobbley
|
|
|
Todays inspection was just for the six north end apartments, two canopies need installed and one side wall adjusted as discussed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | CANC |
Jim Page
|
|
|
Inspection request needs to be coordinated with fire alarm vendor, alarm contractor has inspection scheduled for 01JULY2019, this request is cancelled.
Gabe Garduno is the contact for this final. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | CANC |
Jim Page
|
|
|
Could not final, fire alarms not ready, this request is cancelled.
Gabe Garduno is the contact. Thank you for all that you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Gabe Garduno is the contact. This inspection is to be done in connection with an underground flush/hydro for 11783 W. Fairview at 10:00 AM, as well as an underground flush/hydro for this building. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Troy Cobbley
|
|
|
The rough-in passed for the remaining piping for the south half of the buiding. Tenting passed. All piping can be covered.
|
INSP-Sprinkler Rough-in | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for apartments marked on the north half of the building where piping is ok for cover.
Gabe Garduno is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | FAIL |
Troy Cobbley
|
|
|
City approved plans not on site. We discussed cocerage under the exterior eave at the entrys. I deferred him to the designer and plan review.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for several locations on the second floor where piping is marked "ok" for cover. Plan mods are needed for pipe routing changes. Possible additional heads will be required due to soffits being added.
Gabe Garduno is the contact. He wants this to be a partial rough-in. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PART |
Troy Cobbley
|
|
|
Inspection was actually a conference about pipe covering in two rooms
Gabe Garduno is the contact. This inspection is for a partial rough-in. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|