Permit Information
Permit NumberFIR19-00290
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 5450 W GOWEN RD
Project NameKnife River Office/Shop
Customer Number 
ePlanReviewYes
Description
This is the overhead submittal for the existing UG permit number FIR19-00251. This is a dual zone wet system. Ordinary Gp. 2 Hazard.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/10/201912/11/201912/11/2019APASS
DetailsTroy Cobbley
Permit finaled.

Todd is the contact. Thanks for all yo do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection12/9/201912/10/201912/10/2019PFAIL
DetailsTroy Cobbley
Forward flush passed but unable to verify signals due to fire alarm issue.

Todd is the contact Thanks for all yo do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/3/201912/3/201912/3/2019PPASS
DetailsTroy Cobbley
Overhead hydro passed and pendants have been modified in the second open office.

Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/26/201912/2/201912/2/2019APART
DetailsTroy Cobbley
The sprinkler piping above the "clouds", in the second floor open area is ok for cover however it appears one pendant may need to be added due to 18' spacing on the current pendants. Also it does not appear the latest approved plans are on site since the changes in pipe routing are not shown.

Cole Bierman is the contact for this RTC and Hydro Inspection. He is hoping for an AM appointment. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/20/201911/21/201911/21/2019APASS
DetailsTroy Cobbley
First floor hydro test witnessed. Second floor piping ok to cover as marked.

Cole Bierman is the contact for this RTC/ Hydro Inspection. He is hoping for an hour notice of when appointment will be. Thank you for your help. We appreciate you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/15/201911/18/201911/18/2019APASS
DetailsTroy Cobbley
All sprinkler piping on the first floor is ok for cover. Not ready for hydro today.

Cole is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/10/20199/11/20199/11/2019PPART
DetailsTroy Cobbley
Todays inspection was for a general rough-in. Piping for ceiling drops and overhead doors not installed yet and will require a separate inspection prior to cover. I noted several small deficiencies as noted on plans but mostly the rough-in is fine. Plan modifications are required showing the main piping routing changes which is to include the additional fitings and elevation changes.

Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/10/20199/10/20199/10/2019PPASS
DetailsTroy Cobbley
See the city approved plans for piping above the hardlids on first and second floors where piping is ok to cover.
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in8/8/20198/9/20198/9/2019APART
DetailsJim Page
Inspection for preset hangers complete, verified back nuts are in place with sammy attachments, preset hangers approved for cover.