Permit Information
Permit NumberFIR19-00365
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3500 N CABARTON LN
Project NameMOUNTAN VIEW ELEMENTARY
Customer Number 
ePlanReviewYes
Description
***QUICK PERMIT**MAS** SHILO SHALL INSTALL APPROXIMATELY 78 FT OF 6" C-900 FROM THE PROPERTY LINE TO A IN BUILDING RISER. AND APPROXIMATELY 218 FT OF 4" C900 TO A REMOTE FDC COMPLETE WITH FRENCH DRAIN AND ROAD BOX.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/10/20204/13/20204/13/2020APASS
DetailsJim Page
Final inspection for underground supply is complete.

Kenny Caldwell is the contact. Have a good day (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/30/20201/31/20201/31/2020APASS
DetailsTroy Cobbley
Underground Hydro witnessed. Kenny Caldwell is the contact.Thanks for all you do. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush1/29/20201/29/20201/29/2020PPASS
DetailsTroy Cobbley
Underground supply line flush witnessed.
INSP-Sprinkler Rough-in/Hydro1/28/20201/29/20201/29/2020PCANC
DetailsTroy Cobbley
Not ready for hydro due to Suez needing an extended flush time because of water discoloration.

Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/2/20201/2/20201/2/2020PPASS
DetailsTroy Cobbley
The underground supply piping and the remote FDC piping is ok for cover.

Bryan Collins is the for this underground RTC Inspection. He is hoping for and appointment around 11AM if possible. Thank you so much for your help. Have a great day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/1/201911/4/201911/4/2019PPASS
DetailsTroy Cobbley
See the city approved plans for area of rogh-in today.

Kenny Caldwell is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/21/201910/22/201910/22/2019APASS
DetailsTroy Cobbley
Rough-in for piping and hangers passed for the north wing. See the city approved plans for location. Another rough to cover inspection will be required when the drops have been installed . I noted acouple of missing upright heads and possible blocked heads due to truss webbing. I went over the "three time rule" with fitter.
INSP-Sprinkler Rough-in10/17/201910/17/201910/17/2019PCANC
DetailsTroy Cobbley
Cancel per Kenny Caldwell. Also wrong permit called in. We appreciate your help. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/10/20196/10/20196/10/2019PPART
DetailsJim Page
Inspection for IBR and remote FDC piping that passes under the footing complete (around 5 feet of pipe out from footing) , piping inspected approved for cover, remaining undergorund piping to be installed at a later date.

The contact is Jared. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus