Permit Information
Permit NumberFIR19-00599
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 3500 N CABARTON LN
Project NameMOUNTAINVIEW ELEMENTARY SCHOOL
Customer Number 
ePlanReviewYes
Description
SHILO SHALL INSTALL A 6" C900 UG TO A 4" BACKFLOW AND 4" RISER MANIFOLD FEEDING ONE SYSTEM IN A COMBUSTIBLE BUILDING. CLASSROOMS AND HALLWAYS HAVE EXTENDED COVERAGE HEADS. SELECTED AREAS ARE NON-COMBUSTIBLE. EQ BRACING AND LINE RESTRAINTS AREA REQUIRED. OUTSIDE CANOPIES ARE NON-COMBUSTIBLE.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/21/20204/22/20204/22/2020APASS
DetailsJim Page
Forward flush is complete, final fire sprinkler inspection is complete.

Kenny Caldwell is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection4/13/20204/13/20204/13/2020PPART
DetailsJim Page
Final fire sprinkler inspection is complete. Last remaining item to complete is the forward flow test, pitot tube not available at time of inspection.

Kenny Caldwell is the contact. The inspection is already being done this morning. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/10/20202/12/20202/12/2020PPASS
DetailsTroy Cobbley
The piping in the Kitchen area is ok for cover. Three EQ braces will be verified at next inspection.

Kenny Caldwell Is the Contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/30/20201/31/20201/31/2020APASS
DetailsTroy Cobbley
Overhead hydro test witnessed.

Kenny Caldwell is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush1/28/20201/29/20201/29/2020APASS
DetailsTroy Cobbley
Underground supply line flush passed but this is the wrong permit number. Actual permit is FIR19-00365 and an entry has been made there.

Kenny Caldwell will be the contact. Stacey with the water will be there between 10 and 10:30 AM. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/27/20201/29/20201/29/2020APASS
DetailsTroy Cobbley
Overhead rough-in, branchlines/hangers, for the Kitchen area passed. An additional cover inspection will be needed when T-bar has been installed. Kenny Caldwell is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/6/20201/7/20201/7/2020APASS
DetailsTroy Cobbley
All piping is now ok for cover except the Kitchen area which is not complete.

Kenny Caldwell is the contact for this RTC inspection. We appreciate you help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/3/20201/6/20201/6/2020PPASS
DetailsTroy Cobbley
See the city approved plans with room locations marked "ok" where piping is ok for cover. ]
Kenny Caldwell is the contact for this RTC Inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/10/201912/13/201912/13/2019PPASS
DetailsTroy Cobbley
See the city approved plans for rooms marked "ok" where piping is ok for cover.

Kenny is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/19/201911/20/201911/20/2019PPASS
DetailsTroy Cobbley
The piping above the third floor corridor soffits is ok to cover. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/17/201910/21/201910/21/2019ACANC
DetailsTroy Cobbley
Cancel per Kenny Caldwell. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/2/201910/3/201910/3/2019PPASS
DetailsTroy Cobbley
Corrections have been made at the two restrooms. Also see the city approved plans for an additional area where the rough-in has passed dated today. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/1/201910/2/201910/2/2019APASS
DetailsTroy Cobbley
See the city approved plans for area where branchline and main rough-in took place. I noted that upright sprinkler heads are overspace at two restroom locations if the sheet rock goes to the deck. Kenny Caldwell is the contact for this rough to cover inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/23/20199/23/20199/23/2019PPASS
DetailsTroy Cobbley
The four combustible concealed spaces in the south will are ok to cover. Sprinkler protection has been added. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/20/20199/23/20199/23/2019APASS
DetailsTroy Cobbley
See the city approved plans for today inspection area. Has been marked on the plans and dated. I noted combustible concealed spaces in the corridor above each of the classroom doors that will need to be addressed before a cover approval is given. Kenny Caldwell is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus