Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberFIR19-00679
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 2273 S VISTA AVE Unit: 110
Project NameIdaho Perio Vista TI
Customer Number 
ePlanReviewYes
Description
**QUICK PERMIT** Relocate 19 SSP heads to accomodate for new walls and grid layouts. Add 5 SSP heads to accommodate for new walls and gfrid layouts. Fire Sprinkler
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/28/20201/29/20201/29/2020APASS
DetailsTroy Cobbley
Permit finaled.

Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection1/15/20201/17/20201/16/2020ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Final Inspection1/2/20201/3/20201/3/2020ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
INSP-Final Inspection12/12/201912/13/201912/13/2019PFAIL
DetailsTroy Cobbley
Some ceiling tile is missing in nearly every room. Need all tile installed for a final.
Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in11/11/201911/12/201911/12/2019PCANC
DetailsJim Page
Per conversation with installing contractor, this is a duplicate inspection request, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in11/8/201911/12/201911/12/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work is complete, approved for cover. City approved drawings points out a room that does not have a ceiling, no ceiling was installed at time of inspection. As stated on the city approved draiwngs if walls do not go all the way to the deck then that area will need to comply with 2016 NFPA 13 section 18.15.23.

If sprinkler heads are added due to the walls not going all the way to the deck then ceiling tiles will need to be removed to verify upright fire sprinkler addition to comply with NFPA 13.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
The two hard lids piping is ok for cover. . Phone #: ###-#### Inspection requested via web by Sam Ball