INSP-Final Inspection | 7/22/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items on the 22JULY2020 inspection have been corrected, final fire sprinkler inspection is complete.
Coordinate a time with James. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed, no pressure loss observed at riser provided gauges.
Hydro, all floors. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, fire alarm inspection did not get scheduled to coincide with fire sprinkler final.
Final inspection if hydro passes in AM. Coordinate with James. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | FAIL |
Jim Page
|
|
|
Visible leaks plus pressure loss on riser gauges during hydro. Multiple areas that have 4.9K heads closer than 24 inches to heat registers in restrooms. Replace heads in areas where 5.6K should have been installed and 4.9K were put in place. Replace 5.6K head in apartment that should be a 4.9K. Dry sidewall head in south exterior room is farther than 6 inches from the deck, could not find any documentation allowing head to be outside the 4 too 6 inch measurement range. Provide head guards on heads under stairs, level 1.
Overhead hydro on all four floors. Call James before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | FAIL |
Jim Page
|
|
|
PIV tamper not installed/wired. Hydrostatic test for overhead fire sprinkler has not been completyed/documented under permit notes. Need fire alarm inspection scheduled to coincide with fire sprinkler final for sprinkler monitoring.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Supply line flush | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | DONE |
Jim Page
|
|
|
Re-flush on underground due too PIV addition has been complete.
Scheduling in case we can get everyone on board. Stacy is flexible on time, so please coordinate with James or Alicia so we can get Stacy out at your preferred time. ###-#### Thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | DONE |
Jim Page
|
|
|
PIV has been added, no pressure loss observed for re-hydro.
Underground rough/hydro - PIV has been installed on the fire line. Call James when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 7/20/2020 | 7/20/2020 | 7/20/2020 | A | PASS |
Jim Page
|
|
|
PIV has been installed/inspected, cover is approved.
|
INSP-Supply line flush | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | DONE |
Jim Page
|
|
|
Main line flush witnessed.
Scheduled with Pat at Suez for 9:30am pending your availability (did not reach out as you were on vacation) Anthony will check with you early to confirm availability. If time does not work, can be moved to afternoon, Pat is flexible in afternoon (or can be rescheduled for next week if not available) Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 5/4/2020 | 5/4/2020 | 5/4/2020 | A | PART |
Jim Page
|
|
|
Soffits in tenant rooms, levels 4 complete, soffits in tenant rooms approved for cover.
4th floor soffit sprinklers. Call James when heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 4/22/2020 | 4/22/2020 | 4/22/2020 | A | PART |
Jim Page
|
|
|
Restroom lowered ceilings on levels 1 2 amd 3 complete, restrooms approved for cover. Level 3 room soffits approved for cover.
1st, 2nd ; 3rd floor soffit sprinkler inspections. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PART |
Jim Page
|
|
|
Soffits in tenant rooms, levels 1 and 2 are complete, soffits in tenant rooms approved for cover.
Soffit sprinklers, first and second floor units. Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Troy Cobbley
|
|
|
Fourth floor piping is ok for cover. See Mark Stumbaugh letter. Fourth floor rough to cover, ready any time. Call James when heading out there so he can meet you. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/31/2020 | 1/31/2020 | 1/31/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for levels 1, 2 and 3 complete, levels 1,2 and 3 suite rooms approved for cover, city approved plans are notated with red ink areas approved for cover, corridor heads to be cut in after ceiling grid is installed. Rough in inspection for level 4 complete, tenting not installed at time of inspection. According to GC the roof has an R-30 rating, as shown on city approved drawings R-38 is minimum R value to be compliant with approved drawings, cover is not approved for level 4.
1st, 3rd, 4th floor rough/tenting. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | CANC |
Jim Page
|
|
|
Inspection request was cancelled per conversation with point of contact due to flexible dry pendant being graded the wrong way. Corrections will be made to have whip grade towards sprinkler head per manufacturers requirements.
Rough and tenting on 1st, 3rd, and 4th floors. 2nd already passed. Please call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PART |
Troy Cobbley
|
|
|
FIrst floor inspection stopped due to pipe routing changes and additional fittings that need approved prior to a cover approval. The second floor rough-in passed and piping can be covered in the residence rooms. An additional cover inspection will be needed when the T-bar in the corridor has been installed and pendants cut to it.
First and second floors, overhead rough. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed.
Underground rough ; hydro - call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact due to underground not holding pressure, will be rescheduled for a later date.
Underground rough ; hydro. Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|