INSP-Final Inspection | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Please call Logan with Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
*** FAIL No ceiling tiles installed. Heads not installed in tiles. MAS***
We would like to perform this inspection in conjunction with fire lie safety final for bld.
Please call Logan with questions and time frame. Phone #: ###-#### >> Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Logan Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|