JUMP - Shell permit - To construct the shell portion of the new 240,445 square foot, six story JUMP building project. This permit will include the installation of exterior walls, roofs and soffits, as well as, all portions of the above grade parking garage. To construct all exterior circulation and egress areas, exterior stairways, elevators and mechanical shafts. To complete all mechanical, electrical and machine rooms. To install main mechanical equipment and to rough-in mechanical, plumbing and electrical work. Although the approved plans show scopes of work beyond the shell, it is for reference only. These plans were not reviewed or approved for those scopes of work. Separate tenant improvement permits will be required to finish all core areas and tenant spaces for occupancy. This permit also includes related site improvements. This is a highrise building and is required to be fully fire sprinkled in accordance with NFPA 13. The underground garage was permitted under BLD12-01330. The building superstructure was permitted under BLD12-02320. The building permit to finish the building is BLD13-01634. All construction per the approved plans and attached comment list. PLAN MODIFICATION 6-11-15 – Modification submitted to modify ramp / handrails and other park features.**TLW** JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  9/4/2018 DONE
CHANGE STATUS TO (FNL)  8/31/2018 DONE
BLD-Final3/28/20183/29/20183/29/2018APASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection3/28/20183/28/20183/28/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
Zoning Approval1/19/20181/19/20181/19/2018 PASS
DetailsSarah Schafer
PubWorks Occupancy Approval1/18/20181/18/20181/18/2018 DONE
DetailsTiffany Lowery
BLD-Final10/23/201710/24/201710/24/2017ANR
DetailsDave Hannah
Victoria-please call Victoria she has questions about this permit and the camopies permit Phone #: ###-####
CHANGE STATUS TO (ISS)  10/16/2017 DONE
deferred submittal for tractor canopies issued
OVERRIDE  8/7/2017  
Plan assigned to (AJS)4/14/20174/14/20178/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
Telephone call  8/7/2017 DONE
emailed Angie that the plan mod is ready
Routing Off Site - STRUCTURAL8/7/2017 8/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
structural on stair canopy
Routing - PLAN CHECK8/7/2017 8/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
structural on stair canopy
Permit Ready to Issue  8/7/2017 DONE
DO NOT RE ISSUE- deferred plans for tractor shelter 460, 697, 723, 725, 734, 751 & 754 is ready as well as stairs cont (?) BLD15-02669
Plan resubmittals received  7/17/2017 DONE
6 copies of JUMP PH2 Tractor & Stair Canopy Deferred Submittal ( HCCA Response to Citty Comments) taken to Adele. (bld15-02669)
Change Expiration Date Only  7/16/2017 DONE
DetailsJason Blais
A 180 day extension is approved from 4/24/17.
Routing - PLAN CHECK4/14/2017 5/10/2017 FAIL
DetailsAdele J Schaffeld-Griffin
pending structural approval
Routing - Design Review4/24/2017 5/9/2017 PASS
DetailsSarah Schafer
stair canopy is approved as per DRH15-00056
Routing Off Site - STRUCTURAL4/14/2017 5/1/2017 FAIL
DetailsAdele J Schaffeld-Griffin
Plan Modification Accepted  4/14/2017 DONE
DetailsChristina Prado
Deferred Sub for Stair Canopy
OVERRIDE  12/20/2016  
CHANGE STATUS TO (ISS)  12/20/2016 DONE
as per Angie, deferred plans ready-changed staus back to issued
Permit Ready to Issue  12/20/2016 DONE
Plan assigned to (AJS)12/12/201612/12/201612/19/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK12/19/2016 12/19/2016 PASS
DetailsAdele J Schaffeld-Griffin
Park rail structural review only
Plan resubmittals received  12/12/2016 DONE
DetailsChristina Prado
received three sets of plans and structural calcs for Site Park Rails deferred submittal. Plans stamped and taken to CDM for review. Third set sent to off-site structural for review
Routing - PLAN CHECK10/12/2015 11/7/2016 FAIL
DetailsTim L. Woodard
Wide Slide.
Routing - PLUMBING5/18/2016 5/18/2016 PASS
DetailsBill VanDegrift
Approved changes to sheet C$-02, sewer stub location.
Additional plans submitted  5/17/2016 DONE
Received revised sheet C$-02 as requested by Kyle to show changes to sewer connection for SWHQ.
Routing PW Sewer Design5/17/2016 5/17/2016 PASS
DetailsKyle S. Rosenmeyer
sheet C4-02
Routing - PLAN CHECK5/12/2016 5/13/2016 PEND
DetailsTim L. Woodard
Defered submittal for glass at tractor canopies switched to be part of BLD15-02669. TLW
Plan Reviewer's activity  5/13/2016 DONE
Defered Submittals for Trash Enclosure and Vault Ladder approved. TLW
Telephone call  5/13/2016 DONE
tried calling Victoria but her phone mail box is full and won't take anymore calls so i emailed her that 3 deferred submittals are ready for pickup-vault ladder-trash enclosure & the tractor canopies
Routing Off Site - STRUCTURAL11/17/2015 5/13/2016 PASS
DetailsTim L. Woodard
New deferred submittal - Super 805 climbing play structure. Approved and issued **TLW**
Plan Modification Accepted  5/12/2016 DONE
deferred submittals-received 3 sets of Jump PH1 tractor canopy glass shop drawings & calcx-make copy of cover and emailed to Angie B and took plans to Tim W
BLD-Conference4/28/20164/29/20164/29/2016APASS
DetailsDave Hannah
would like call ahead; Walter Phone #: ###-#### ok to remove exit signs on 6th floor patio cover
Plan resubmittals received  4/27/2016 DONE
deferred submittals for below grade garage meter vault ladder-received 3 sets of struc calcs & 3 each sheets EM-6, M16-Took to Tim Woodards desk and sent a copy of the top sheet to Angie B











B
Plan resubmittals received  4/27/2016 DONE
deffered submittals received jump trash emclosure biford gate-received 3 sets of struc calcs and 3 sheets of each EM-14 & M21-took to Tim Woodards desk and sent Angie B a copy of the top sheet
Plan Reviewer's activity  4/25/2016 DONE
Approved - Minor Modifications to the "Party Zone" project. TLW
Telephone call  4/25/2016  
Spoke with Victoria informing her that the party zone for JUMP is ready to be picked up
Plan Modification Accepted  4/21/2016 DONE
deferred submittals received 2 sets of plans-lower deck steel framing modifications-Angie ok'd-took to Tim W
(F) Reprint permit  4/13/2016 DONE
CHANGE STATUS TO (ISS)  4/13/2016 DONE
all plan mod fees paid
OVERRIDE  3/31/2016  
Permit Ready to Issue  3/31/2016 DONE
DetailsChristina Prado
DO NOT RE-ISSUE, PLAN MOD APPROVED, ALL REQUIREMENTS MET///CP
Routing - PLAN CHECK3/28/2016 3/29/2016 PASS
DetailsTim L. Woodard
Pending Assignment by TLW3/11/2016 3/29/2016 PASS
DetailsTim L. Woodard
Routing - PLANNING3/18/2016 3/28/2016 PASS
DetailsSarah Schafer
Route to Sarah Schafer DRH16-00032

Approved per DRH16-00032.
Routing PW Street Lights3/17/2016 3/18/2016 PASS
DetailsMike D Hedge
Routing - PUBLIC WORKS3/17/2016 3/18/2016 PASS
DetailsRachael Beierle
Route to Sarah Schafer when finished. This needs to go to historic street lighting for sure. TLW
Routing - PLAN CHECK3/11/2016 3/17/2016 PEND
DetailsTim L. Woodard
Need reviews by PW and Planning. TLW
Routing - Addressing3/17/2016 3/17/2016 PASS
DetailsLaura Hunter
Plan Modification Accepted  3/11/2016 DONE
plan mod for addendum 037/ASI 070-071 core & shell package received 2 sets of response letter, plan mod ap, P & Z letter DRH16-00032, C2-04-0-HQ, C4-01-0-HQ, C4-01, C4-02-0-HQ, C4-02, E1-01-E, E1-01-F, E1-01-G, L-01-1HQ, L-01-2HQ & L-01-3HQ-Christina got our plans to have customer insert drawing
Plan Reviewer's activity  3/10/2016 DONE
Approved "Wide Slide" defered Submittals. TLW
Routing Off Site - STRUCTURAL11/17/2015 3/10/2016 PASS
DetailsTim L. Woodard
Resubmittals for Level 5 Wide Slide
Routing - PLAN CHECK11/7/2014 3/10/2016 PASS
DetailsTim L. Woodard
Wide Slide approved. TLW
Routing - PLAN CHECK2/4/2015 3/10/2016 PASS
DetailsJohn Menard
Approved previously by JCM
Telephone call  3/2/2016 DONE
called Network Global for pick up to CH2MHILL
Plan resubmittals received  3/1/2016 DONE
received 3 copies of calculations and 3 sets of plans sheets 1-10 for deffered submittal on teh WIde slide at the level 5 party zone- gave to Tim and emailed Angie cover sheet
OVERRIDE  1/26/2016  
CHANGE STATUS TO (ISS)  1/26/2016 DONE
as per Tim Woodard- NO fees due
Telephone call  1/26/2016 DONE
left message with customer and notified that plans are ready, no fees due
Plan assigned to (TLW)1/25/2016 1/26/2016 DONE
DetailsTim L. Woodard
Plan Mod. JUMP Amphitheater
Permit Ready to Issue  1/26/2016 DONE
all requirments met- as per Tim Woodard, no fees due
Routing - PLAN CHECK12/7/2015 1/26/2016 PASS
DetailsTim L. Woodard
plan mod revisions for ampitheater including availible restrooms AMMR. TLW
Telephone call  12/16/2015 DONE
called Victoria to let know deferred submittals for the climbing structure are ready
Plan resubmittals received  12/7/2015  
DetailsTim L. Woodard
Received requested resubmittals/additional sheets for ampitheater. This is for existing plan mod approved by John Menard. Reflects Code alternate #13. Addendum 035/ASO 068. Received sheets A0-00-B, A0-00-B1, A0-00-W, A0-01-N, A3-01-D, A3-01-E, L-01-1-HQ, L-01-2-HQ, L-01-3-HQ, C2-03-1-HQ, C2-03-2-HQ, C2-03-3-HQ, C2-04-1-HQ, C2-04-2-HQ, C2-04-3-HQ, C2-06-0-HQ, C3-03-0-HQ, C3-05-0-HQ, C5-03-0-HQ, C2-04-1.
BLD-Conference11/23/201511/23/201511/23/2015PPASS
DetailsDave Hannah
Conf requested by Victoria via voicemail, not sure on exact area Phone #: ###-####
BLD-Final11/23/201511/23/201511/23/2015PPART
DetailsDave Hannah
ok for temp occ ok for perm occ after other buildings are finaled and under ground parking garage can be openned
Telephone call  11/19/2015 DONE
called Noelle to let know plan mod is ready-left message on her phone
Plan Reviewer's activity  11/18/2015 DONE
DetailsTim L. Woodard
Glass Guard Rails Deffered Sumittal Approved. Submitted 10-30-15. TLW
Routing Off Site - STRUCTURAL10/30/2015 11/18/2015 PASS
DetailsTim L. Woodard
Glass Guardrail
Plan resubmittals received  11/16/2015 DONE
DetailsChristina Prado
Received three sets of structural calcs and plans for new Climbing Structure Deferred Submittal, plans stamped and taken to TLW for review
Plan resubmittals received  11/16/2015 DONE
DetailsChristina Prado
Received three sets of revised strcutural calcs & plans for the Level 5 Wide Slide
BLD-Conference11/10/201511/12/201511/12/2015APART
DetailsDave Hannah
Victoria Phone #: ###-#### ok to have simplot employees tour site
CHANGE STATUS TO (ISS)  10/30/2015 DONE
DetailsChristina Prado
Plan resubmittals received  10/30/2015 DONE
DetailsChristina Prado
Deferred submital for Glass Guardrail
Plan Modification Accepted  10/29/2015  
Changes updating storm drain on 11th and Myrlte Streets and vacated. Addition of detectable warning strips and ADA ramp. sheets A0-00-A, A0-00-B1, C2-04-1, C4-01, C$-02, C4-07 ADDENDUM 036/ ASI 069
BLD-Conference10/22/201510/23/201510/23/2015ADONE
DetailsDave Hannah
Victoria Phone #: ###-####
Routing Off Site - STRUCTURAL9/23/2015 10/12/2015 FAIL
DetailsTim L. Woodard
Deferred submittal for Level 5 Wide Slide - Received three sets of calculattions & plan sheets; Plans sent to off site engineering and TLW for review
Plan review with corrections required sent.
Plan resubmittals received  9/23/2015 DONE
**Deferred Submital for Wide Slide on level 5.3 copies of structual plans and 3 copies of calcs.
Plan resubmittals received  9/23/2015 DONE
DetailsChristina Prado
Deferred submittal for Level 5 Wide Slide - Received three sets of calculattions & plan sheets; Plans sent to off site engineering and TLW for review
BLD-Conference9/17/20159/18/20159/18/2015APASS
DetailsJim Storey
CJ Phone #: ###-####
CHANGE STATUS TO (ISS)  9/17/2015  
BLD-Final8/27/20158/28/20158/28/2015APART
DetailsDave Hannah
CJ Phone #: ###-#### ok for temp occ staff only still not ready for general public.
FIRE-Final Inspection8/27/20158/28/20158/28/2015PPART
DetailsThomas Walsh
Fire and Life-Safety inspection of the JUMP bldg, for TCO of a small amount (10-15) of staff personnel to access the building for start-up purposes - No public access at this time.
Followup inspection from this morning, including covering up some exit signs for exit stairs that are not in service at this time. Fire protection systems and fire alarm systems are fully operational and shall be kept in service at all times. There may be times when systems have to be taken off line for maint. purposes, however these systems shall always be put back into service at the end of shift.
Exit gates have been identified, and fitted with panic hardware. Egress paths are in place, however some of these walkways from the JUMP structure to the public way may be temporary. Temp. exit signs were also posted to aid staff to the nearest exit gate at grade level.
Fire is OK with TCO for this small amount of staff while the building is being completed.
FIRE-Final Inspection8/27/20158/28/20158/28/2015APART
DetailsThomas Walsh
Retest of the exit signs and emergency lighting system for the JUMP bldg, on generator - above ground only - underground parking garage not tested, addressing corrections made from the previous test on 8/21.
All previous items deqautely addressed, The following items should be addressed prior to TCO of office staff;
1. Cover all exit signs (approx. 6) for the northwest exits on the second floor office suite. This exit, and exterior exit stair, will not be used for this partial TCO.
2. Install EM lighting fixture on pole at exit gate, located on 9th street exit.
3. Cover exit signs for parking garage far west stair, that will not be utilized for this partial TCO of office staff only.
NOTE: Pathways from exit stairs, and the pedestrian walkways are currently being poured, and will be inspected later today. East exit gates will also be fitted with panic hardware devices.
FIRE-Final Inspection8/27/20158/27/20158/27/2015PPART
DetailsThomas Walsh
Preliminary walk through of JUMP structure to see changes made to egress signs, walking surfaces, etc. from last inspection. An early morning retest of the EM lighting and exit signage off the generator is scheduled for 8/28 am. Some of the exit stairs (parking garage) are not completed yet, but are scheduled to be done also by 8/28. TCO for a small group of emplyees for use of the JUMP building is being proposed next week, pending successful completion of the EM light retest.
FIRE-Final Inspection8/18/20158/21/20158/21/2015APART
DetailsThomas Walsh
Exit sigage and emergency egress lighting for JUMP building, including A/G parking structure, Helix, and associated rooms that make up the JUMP bldg. Test was performed off of generator. All areas tested OK, except as follows;
1. Install exit signs at center stairs (2) in parking structure to clarify exit stairs
2. parking structure level 1 - west side lights not working.
3. Exit signs and EM lights nt working for level 2 office area.'
4.Stair A03B not lit - still under construction.
5. 5th floor kitchen area not lighted.
6.restrooms at multipurpose room not lit.
7. 4th floor frieght elevator lobby not lit.
8. Mech. mezzanine at Inspiration room not lighted.
9. Temp exit signs needed at grade level to direct personnel to exit gates, that are still not present.
10. Egress lighting along east exits not complete yet.
FIRE-Final Inspection8/18/20158/20/20158/20/2015PPART
DetailsThomas Walsh
Meeting to review egress plan prior to tomorrow'smeans of egress inspection with exit sigange and emergency lights off the generator.
Telephone call  8/18/2015 DONE
DetailsChristina Prado
Called Hoffman to advise deferred submittal for "Party ZOne" area is approved and ready for pick up
Routing - PLAN CHECK8/17/2015 8/17/2015 PASS
DetailsTim L. Woodard
Defered Submittal for "Party Zone" Deck and Trellis Approved. TLW
Routing Off Site - STRUCTURAL6/23/2015 8/17/2015 PASS
DetailsTim L. Woodard
Party Zone, deck and trellis
FIRE-Conference8/12/20158/14/20158/14/2015ADONE
DetailsThomas Walsh
Meeting with GC and electrical contractors to review upcoming exit signage and emergency lighting test, which will be scheduled for early morning (5am) to get an accuarte assessment of EMs under dusk conditions, since most of the egress from the building is outside, or open to the outside.
FIRE-Conference8/11/20158/12/20158/12/2015ADONE
DetailsThomas Walsh
Meeting with Bldg. Dept. (Dave) and Hoffman (ZAC) to review areas of the building that they are looking for TCO for use by staff personnel only (approx. 10-12 persons), to get things setup in the building. No public use at this time. They are shooting for temp. TCO status by next Friday (8/21). A review and inspection of the temp. egress systems will be conducted before next Friday. Fire alarm systems are still being tested, so it is the goal to get fire sprinklers, fire alarm and egress (signs and lighting) completed by then. No use of the U/G parking area is being proposed at this time.
BLD-Conference8/11/20158/12/20158/12/2015ADONE
DetailsDave Hannah
CJ Phone #: ###-####
BLD-Final8/4/20158/7/20158/7/2015APEND
DetailsDave Hannah
part 2; CJ Phone #: ###-####
BLD-Final8/4/20158/6/20158/6/2015APEND
DetailsDave Hannah
part 1; CJ Phone #: ###-####
BLD-Conference8/3/20158/4/20158/5/2015ADONE
DetailsDave Hannah
TJ Phone #: ###-####
BLD-Conference7/30/20157/30/20157/31/2015PPASS
DetailsDave Hannah
CJ Phone #: ###-####
BLD-Conference7/23/20157/24/20157/24/2015ADONE
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Conference7/20/20157/20/20157/20/2015APASS
DetailsDave Hannah
C.J. Phone #: ###-####
BLD-Conference7/13/20157/17/20157/20/2015ACANC
DetailsDave Hannah
C.J. Phone #: ###-####
Attached Document  7/20/2015 DONE
Cable Guardrail Letter from AHJ engineers.
Plan resubmittals received  7/20/2015 DONE
DetailsChristina Prado
***Deferred submital for tractor canopies*** Received three sets of repsonse letter, spec book and plans for tractor canopy install. Plans taken to TLW for review and approval
BLD-Wall cover7/15/20157/16/20157/16/2015APASS
DetailsDave Hannah
Requesting Sheathing inspection for Entry Portal. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
BLD-Framing/Rough-in7/15/20157/16/20157/15/2015PCANC
DetailsDave Hannah
Requesting sheathing inspection for entry portal please contact RUDY Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
Fees Due Hold7/8/2015 7/13/2015 DONE
DetailsCarlos Velazquez
fees paid over-the-mail
Plan resubmittals received  6/25/2015 DONE
DetailsChristina Prado
Received three sets of revised structural calcs for JUMP Slide Tower deferred submittal package. Calcs taken to TLW for further review
Plan Reviewer's activity  6/25/2015 DONE
Approved "Fireplace Wall" defered submittal. TLW
Routing Off Site - STRUCTURAL6/18/2015 6/25/2015 PASS
DetailsTim L. Woodard
Fall Protection @2nd level tractor box. Approved. TLW
Plan resubmittals received  6/23/2015 DONE
deferred submittals-canopy and deck on level 05-gave Angie the cover-received 3 of each sheetS101, S201, S202, S301, S401, struc calcs for party zone deck & trellis-took to Tim W
Plan resubmittals received  6/23/2015 DONE
deferred submittals recieved 3 each-sheet CR3.11, CR3.19 & struc calcs for G10 handrail-gave Angie a copy of cover letter and took to Tim W
Plan resubmittals received  6/18/2015 DONE
Derferred Submittal for Lobby Studio Fireplace Wall. Three copies of Structural Design Calculations and three copies of sheet S1.1. Taken to Tim W
CHANGE STATUS TO (ISS)  6/18/2015 DONE
DetailsChristina Prado
Per Rita keep status ISS so they can schedule insp online.
Plan resubmittals received  6/15/2015 DONE
Deffered submittals received; (3) copies of calculations 1.01, 1.02, 3.01, 3.02, structural plans (A0-00-B, A0-00B1, A3-05-B, A3-05-C, A10-10-01, AD-44-1, AD-45-1, AD-46-1, AD-47-1)
Permit Ready to Issue  6/12/2015 DONE
ready-nothing needed but please do not re issue
Telephone call  6/12/2015 DONE
called Noelle to let know the plan mod amount and that it was ready
Plan assigned to (TLW)5/5/2015 6/11/2015 PASS
DetailsTim L. Woodard
JUMP - Reassigned from John Menard
Routing - PLAN CHECK5/27/2015 6/11/2015 PASS
DetailsTim L. Woodard
Plan mod for changes to ADA handrails in park.
Telephone call  6/11/2015 DONE
called Noelle to let her know the deferred submittals were ready for the cale guards-left message on her cell
Case Summary (BLD)  6/11/2015 DONE
Routing - PLAN CHECK3/25/2015 6/11/2015 PASS
DetailsJohn Menard
Cable Guard Deffered Submittals approved. TLW
Plan resubmittals received  6/9/2015 DONE
Three copies of structural plan review comment responses, and Supplemental Structural Calculations
Plan resubmittals received  6/2/2015 DONE
defferred submittals-received 3 of each-response sheet from Hobson and struc calcs-called Angie and took to Jason Blais
Routing - Design Review5/26/2015 5/27/2015 PASS
DetailsSarah Schafer
Resubmittals for plan mod failed on 3-25; changes to parking at grade and landscape buffer adjacent to trash enclosure

Resubmittals approved for parking changes and landscape buffer adjacent enclosure.
Routing - PUBLIC WORKS GRADING5/27/2015 5/27/2015 PASS
DetailsBrian Murphy
Resubmittals for previously approved plan mod for minor changes to drainage in the park.
Plan resubmittals received  5/22/2015 DONE
DetailsTim L. Woodard
Resubmitttals for plan mod addendum 31, landscape and civil revisions which failed DR on 3-25. Everyone but Sarah had passed last mod. Also includes new modifications to handrails and drainage. This is addendum 33. Received sheets A0-00-B, A0-00-B1, A0-00-L, A3-01-A, A3-01-B, A3-01-C, A3-01-D, A3-01-E, A3-01-F, A3-01-G, A3-01-H, A5-02-30, A5-02-31, A5-02-32, A7-15-02, AD-4-2, C2-01-0, C2-01-1, C2-01-2, C2-01-3, C2-02-0, C2-04-0, C2-04-1, C2-06-0-HQ, L-01-1S, L-01-2S, L-01-3S.
Routing Off Site - STRUCTURAL5/13/2015 5/15/2015 FAIL
DetailsTim L. Woodard
Cable Guard Resubmittals. TLW

5/15/15 Resubmittal calculations required.
Plan resubmittals received  5/13/2015 DONE
DetailsChristina Prado
Received three set of HVAC review comments and corrections for Jump Cable Guard Rail deferred submittal
Plan assigned to (JCM)10/29/2014 5/5/2015 DEFR
DetailsJohn Menard
Plan modification for Maker's Studio level 5
Reassigned to Tim Woodard.
Routing Off Site - STRUCTURAL4/23/2015 5/4/2015 FAIL
DetailsJason Blais
deferred submittal for Lobby Stair; taken to John Menard
Comments to be addressed.
Telephone call  4/23/2015 DONE
called Action Couriers on 4-23-15//set up pick up for 4-24-15
Plan resubmittals received  4/15/2015 DONE
Deferred submittal for the cable guardrail- received 3 copies of plans, letter, and structural calculations- gave to John Menard and I emailed Angie B
Plan Modification Accepted  4/3/2015 DONE
plan mod received 3 sets of-level 4 above grade garage dustg containment room, core & Shell pkg cover sheet and 3 seats each sheet E2-04-B & E3-04-B-took to John with blue book
Plan resubmittals received  4/2/2015 DONE
deferred plans received 3 sets of sheet TR14-388-000,02, 101, 102, 103, 104, 105, 106,107, 108, 109. 110, 111, 112, 200, 215, 216, 220, 241, connection details, substru const-3 structural analysis & design (slide ) 3 drawing lists, TR14-388-230. &231 with 3 sheets each TR14-###-####, 02, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 1156, 200, 201, 220, 241 attached to it-took to John M.
Plan Reviewer's activity  3/26/2015 DONE
DetailsJohn Menard
Taken to front desk for issue of plan modification to the Maker's Studio on level 5 for a slab penetration to level 4 for a dust containment system. As fire dampers do not work for the equipment, a plan modification to make the room on level 4 a 2 hour rated enclosure. THe dust containment room will have 90 min doors to maintain the 2h rating; submitted on plan sheets A0-00-B;A3-04-B; A3-05-B;AD-33-1; M4-03-0
Telephone call  3/26/2015 DONE
DetailsChristina Prado
Called Mark to advise latest plan mod is approved and gave fees due
Routing - PUBLIC WORKS3/4/2015 3/26/2015 PASS
DetailsBeverly Mountain
approved per Beverly Mountain
Routing - Design Review3/23/2015 3/25/2015 FAIL
DetailsSarah Schafer
No concerns with the majority of the changes proposed. The one area where it doesn't provide appropriate screening from the public right-of-way is at the southeast corner of the site adjacent the generators and the access point to the parking for Seiniger. The generator access was rotated, planter island removed and vegetation adjacent to the generator screens only gets to be 2 - 3-foot in height.
Routing - MECHANICAL3/24/2015 3/25/2015 PASS
DetailsTroy James
Plan Mod for Dust containment with mechanical plan as requested by Troy; sheet M4-03-0
Additional plans submitted  3/24/2015 DONE
Received mechanical sheet at requested for pending mod for dust containment; M4-03-0. Routed plan mod to Troy.
Routing PW Drainage3/13/2015 3/24/2015 PASS
DetailsBrian Murphy
BLD-Wall cover3/18/20153/18/20153/18/2015APASS
DetailsDave Hannah
Requesting sheathing inspection for tractor box 02c03, 04c02 and 03d03. Phone #: ###-#### Inspection requested via web by Tim Pendleton
Routing PW Sewer Design3/4/2015 3/13/2015 PASS
DetailsKyle S. Rosenmeyer
Revised plans recieved 3/12 for sheets C4-01-0-HQ and C4-02. Sheets inserted 3/13.
BLD-Framing/Rough-in3/3/20153/4/20153/4/2015APASS
DetailsDave Hannah
Requesting Framing/Sheathing inspection for East Tractor Box. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
Plan Modification Accepted  3/3/2015 DONE
DetailsChristina Prado
Plan modification accepted for review of updated Civil & Landscape drawings. Sheets affected are C1-01-0, C2-01-0, C2-01-1, C2-01-2, C2-01-3, C2-02-0, C2-02-1, C2-03-1, C2-04-1, C03-02, C4-02, C4-01-0-HQ, L-01-1N, L-01-1S, L-01-2S, L-01-3N & L-01-3S; Plans taken to John Menard for review
BLD-Framing/Rough-in2/17/20152/18/20152/19/2015APASS
DetailsDave Hannah
Requesting sheathing inspection for level 6 service core. outside sheathing inspection for all tractor boxes excluding east box Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
Plan Reviewer's activity  2/18/2015 PASS
DetailsJohn Menard
Reviewed and approved final revised structural calculations for the deferred submittal of the Skylight and Canopy systems. JCM
Telephone call  2/18/2015 DONE
called Contractor and let them know deferred submittal is ready for pick up
Plan resubmittals received  2/18/2015 DONE
DetailsChristina Prado
Received three sets of plans for deferred submital for Distributed Antenna System. Plans taken to John Menard for processing
CHANGE STATUS TO (ISS)  2/13/2015 DONE
Plan resubmittals received  2/13/2015 DONE
received 3 sets of structural revisions for skylight and canopy framing- gave to John Menard for review
Permit Ready to Issue  2/4/2015 DONE
DetailsCandy A. Nichols
do not re-issue
Telephone call  2/4/2015 DONE
DetailsCandy A. Nichols
called Noelle to let know plan mod was ready for JUMP-3rd level roof assembly occupancy expansion-left message on her phone
Routing - PLAN CHECK1/29/2015 2/4/2015 PASS
DetailsJohn Menard
Plan modification to expand third level roof assembly area. JCM
Routing - FIRE2/4/2015 2/4/2015 PASS
DetailsScott Arellano
No change to comments.
Routing Off Site - STRUCTURAL1/29/2015 2/3/2015 PASS
DetailsJohn Menard
Plan Mod to expand accembly area at 3rd level roof. JCM
Plan Modification Accepted  1/27/2015 DONE
DetailsCandy A. Nichols
received plan mod-3 sets of sheetA0-00-B, A0-00-B1, A0-03-0, A0-03-1, A3-03-A, A5-02-03, A5-02-05, A5-04-02, A5-05-02, AD-5-2, S1-01, S3-03-A., R S6-23-1, E2-03-A, E7-04, PSK-085, PSK-086-3 PERMIT APP'S, 3 cover sheets, 3 struc calcs- made copies for Angie of the cover sheet and took to John M
Telephone call  1/26/2015 DONE
DetailsCandy A. Nichols
Called Noelle to let know plans are ready. RE # RF-6 standing seam metal roof system & MS2 perfprated panel-for stair tower- left message on her phone
PubWorks Occupancy Approval1/21/20151/21/20151/21/2015 DONE
DetailsTiffany Lowery
Reference ODI-3234 for master plan. BLD12-01330 or BLD13-00940
Routing Off Site - STRUCTURAL1/9/2015 1/20/2015 PASS
DetailsJohn Menard
Deferred submittal - stair enclosure response
Routing Off Site - STRUCTURAL1/9/2015 1/20/2015 PASS
DetailsJohn Menard
Deferred submittal - perforated panel for stair tower
Routing Off Site - STRUCTURAL1/9/2015 1/20/2015 PASS
DetailsJohn Menard
Deferred submittal - standing seam metal roof system
Plan resubmittals received  1/12/2015 DONE
deferred submittal for wood canopy; routed to John Menard. (2)
Plan resubmittals received  1/12/2015 DONE
deferred submittal for wood canopy; routed to John Menard (1)
Plan resubmittals received  1/8/2015 DONE
received deffered submittal for MS-2 perforated panel for stair tower including 3 copies of drawings and calculations: taken to John Menard
Plan resubmittals received  1/8/2015 DONE
received response to city comments regarding structural review for stair enclosure including cover sheet and 3 sets of revised calculations
Plan resubmittals received  1/8/2015 DONE
received deffered submittal for RF-6 standing seam metal roof system including 3 copies of revised drawings and calculations
Routing - PLAN CHECK12/4/2014 1/8/2015 PASS
DetailsJohn Menard
Plan Modification for landscaping park design changes, electrical street light revisions and plumbing relocation of a drinking fountain, submitted 11/19/2014. JCM
Routing - MECHANICAL12/22/2014 12/22/2014 FAIL
DetailsTroy James
Responed to email sheets submitted by Mona
Routing - FIRE12/19/201412/19/201412/19/2014 PASS
DetailsScott Arellano
No change to previous plan review report.
Plan resubmittals requested  12/12/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the review comment from our consulting structural engineer for the deferred submittal of the Stair Screen Support Framing for JUMP.
Routing Off Site - STRUCTURAL12/2/2014 12/12/2014 PASS
DetailsJohn Menard
Deferred Submittal: Fall Arrest System (Resubmittals)
Received letter from cosulting structural engineer approving resubmittals. JCM
Routing Off Site - STRUCTURAL12/2/2014 12/12/2014 FAIL
DetailsJohn Menard
Deferred Submittal: Stair Metal Screen Support Framing - Received comment letter from consulting structural engineer requesting some additional documentation or revisions. JCM
Routing - Design Review11/21/2014 12/4/2014 PASS
DetailsSarah Schafer
Modifications ok per CZC14-00332
Plan resubmittals received  12/1/2014 DONE
DetailsCandy A. Nichols
deferred submittals receieved for Jack's Urban Meeting Place-1 reviewed comment cover sheet & 3 response packets-took to John M
Plan resubmittals received  12/1/2014 DONE
DetailsCandy A. Nichols
deferred submittals received-1 cover sheet/response letter-3 metal screen wall framing design struc calcs and 3 each sheet SS0.01, SS1.01, SS1.02, SS1.03, SS2.01, SS2.02, SS2.03, SS3.01, SS3.02, SS3.03, SS3.04 TOOK TO
OHN m
Routing Off Site - STRUCTURAL11/3/2014 11/26/2014 FAIL
DetailsJohn Menard
Deferred Submittal: skylight and canopy systems.
Routing - FIRE11/18/2014 11/24/2014 FAIL
DetailsCraig D. Hanson
Need more information. e-mail sent (plan mod for dust collection system)
Routing PW Street Lights11/21/2014 11/21/2014 PASS
DetailsMike D Hedge
Routing - PLUMBING11/20/2014 11/20/2014 PASS
DetailsDaryl Spivey
Plan Mod accepted for Park Entrance to Market Place, Street Lights, Site Electrical & Relocation of drinking fountains and related plumbing - Shell & Core.
Plan Modification Accepted  11/19/2014 DONE
DetailsChristina Prado
Plan Mod accepted for Park Entrance to Market Place, Street Lights, Site Electrical & Shell & Core packages. Received two sets of revised plan sheets marked A0-00-B, A0-00-B1, A0-00-F, A0-01-0, A1-01-1, A3-01-A, A3-01-B, A3-02-C, A3-01-D, A3-01-E, A3-01-F, A3-01-G, A3-01-H, A5-02-30, A5-02-31, A5-02-32, AD-43-1, C2-01-0, C2-01-1, C2-01-2, C2-01-3, C2-01-0, C2-01-1, L-01-1N, L-01-1S, L-01-2N, L-01-2S, L-01-3N, L-01-3S, E1-01-0, E1-01-A, E1-01-B, E1-01-C, E1-01-D, E1-01-E, E1-01-F, E1-01-G, E1-01-H, E1-01-I, E7-00, E7-11, E7-12, E7-13, P2-01-D, P2-01-F, P2-01-G, P2-01-H & P4-31 as well as three plan mod applications and three letters addressed to Angie & John;Plans stamped and taken to John for further review
Routing - Design Review11/6/2014 11/7/2014 PASS
DetailsSarah Schafer
OK per DRH14-00047
Routing - PUBLIC WORKS GRADING11/6/2014 11/6/2014 PASS
DetailsBrian Murphy
Plan mod for park expansion.
Routing PW Drainage11/6/2014 11/6/2014 PASS
DetailsBrian Murphy
Plan Modification Accepted  10/29/2014 DONE
DetailsJohn Menard
received plan modification to the Maker's Studio on level 5 has a slab penetration to level 4 for a dust containment system. As fire dampers do not work for the equipment our approach is to make the room on level 4 2h rated. THe dust containment room will have about 90 min doors to maintain the 2h rating; submitted on plan sheets A0-04-0;A3-04-B; A3-05-B;AD-33-1; Routed to John Menard
Additional plans submitted  10/29/2014 DONE
DetailsTisha Gallop
deferred submittal for Skylight & Canopy Systems
Plan Reviewer's activity  10/10/2014 DONE
DetailsJohn Menard
Processed glass railing at JUMP 5th level deferred submittals for issue. JCM
Routing Off Site - STRUCTURAL9/30/2014 10/6/2014 PASS
DetailsJohn Menard
Response to commments of Glass Guardrails on level 5 garage
Plan resubmittals received  9/30/2014 DONE
DetailsChristina Prado
Received three sets of revised structural calcs for glass on 5th fl garage
Plan resubmittals requested  9/24/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the deferred Glass Guard designs. JCM
Routing Off Site - STRUCTURAL9/4/2014 9/19/2014 FAIL
DetailsJohn Menard
deferred submittal of Glass Guards
Plan resubmittals received  9/4/2014 DONE
DetailsCandy A. Nichols
deferred submittals received today for the GR-2 handrail system 055100 metal balustrades & glazed guards-took in email to Angie Brosious from Hoffman Construction, transmittal letter from Steelencounters, 3 sets of calcs from Wheaton & Sprague Engineering and sheets 101, cover sheet,101, 200, 201, 202, 203,204,205,206,207,209, 210, 211,212,213,214,215,216,217,218,220,221,222,223,224,225,226,227,228,300,301,302,303,304,305,306,307,308,309,310,337,338,339,340,341,342,343,344,345,346,347,348,349,352,400,401,402,403,404,405,406,407,450,451,475,500,501,502,503,504,505,510,512,579,580,581,583,584,585,586,587,599,600,601,602,603,604,605,606,607,608,609 & 610-took to JCM
Routing - PUBLIC WORKS8/25/2014 8/28/2014 FAIL
DetailsBeverly Mountain
FAIL per Bev Mountain
Routing PW Solid Waste8/28/2014 8/28/2014 PASS
DetailsPeter J. McCullough
No changes.
Routing - Erosion and Sediment8/28/2014 8/28/2014 PASS
DetailsAndy J. Long
No changes to site ESC plan submitted. Changes to current erosion and sediment controls will be address during the bimonthly inspection.
Routing PW Street Lights  8/27/2014 FAIL
DetailsMike D Hedge
No electrical drawings for the two additional lights added to Front street.
Routing PW Sewer Design  8/27/2014 FAIL
DetailsKyle S. Rosenmeyer
Per phone conversation with MKA 8/27:

Label public sewer manholes on plans.
Label all sewer angles between manhole inverts.
Match all crowns of different sized pipe in manholes.
Services less than 8" require 2% slope in public R/W.
No service bends or fittings allowed in public R/W.
Routing PW Drainage8/25/2014 8/26/2014 FAIL
DetailsBrian Murphy
SEEPAGE BED DETAIL NEEDS M WELL,NOBEDS EXISTNOW,ECT
Routing - PLAN CHECK8/22/2014 8/25/2014 PASS
DetailsJohn Menard
Plan Modification submitted on 8/22 (civil and landscape for entire site, including adjacent to the new Simplot office building. JCM
Plan Modification Accepted  8/22/2014 DONE
DetailsTisha Gallop
Plan Modification accepted to show new inforamtion resulting of the developing design of the park for the added Simplot Headquarters and adjusted design items for the park. Note: This package includeds the civil and landscape scope for the complete site. Lanscape and Civil sheets are split into JUMP and JUMP HQ (headquarter) titleblock sheets for client purposes but the complete park should be reviewed under JUMP permit Bld13-00016. Submitted on plan sheets A0-00-F, A0-00-C, A0-00-F, A0-01-0, A1-01-1, A3-01-A, A3-01-B, A3-01-C, A3-01-D, A3-01-E, A3-01-F, A3-01-G, A3-01-H, A5-02-30, A5-02-31, A5-02-32, AD-42-1, L-00-1, L-00-2, L-00-3, L-01-1N, L-01-1S, L-01-2N, L-01-2S, L-01-3N, L-01-3S, L-03-1, L-03-2, L-05-1, L-05-2, L-00-1HQ, L-00-2HQ, L-00-3HQ, L-01-1HQ, L-01-2HQ, L-01-3HQ, C1-01-0, C1-02-0, C, C3-02, C3-03, C3-04, C4-01 (prevously C4-02), C4-02 (previously C4-05), C5-01 (previously C4-06), C1-01-0HQ, C1-01-1-HQ (Was C1-01-1), C2-01-0-HQ, C2-02-0-HQ, C2-03-0-HQ, C2-03-1-HQ, C2-03-2-HQ, C2-03-3-HQ, , C2-04-0-HQ, C2-04-1-HQ, C2-04-2-HQ, C2-04-3-HQ, C2-06-0-HQ, C2-07-0-HQ, C3-0, C4-03-0-HQ, C5-01-0-HQ, C5-02-0-HQ, C5-03-0-HQ, C2-03-0, C2-05-0, C2-05-2, C2-05-3, C2-05-4, memo from architect, and specs; routed to John Menard.
Routing Off Site - STRUCTURAL8/4/2014 8/21/2014 PASS
DetailsJohn Menard
Deferred submital - Lobby Stairs
Routing - FIRE8/13/2014 8/15/2014 PASS
DetailsScott Arellano
Attached updated case comments to permit case. Plan review report relfects the addition of the new automatic smoke curtain at level 6.
Routing - PLAN CHECK8/15/2014 8/15/2014 PASS
DetailsJohn Menard
Plan Mod for fire curtain a level 5 & 6 at windows adjacent to exterior stairway.
Telephone call  8/15/2014 DONE
DetailsCandy A. Nichols
called Noelle to let know the plan mods are ready to be picked up-left message on machine
Permit Ready to Issue  8/15/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals requested  8/13/2014 DONE
DetailsJohn Menard
Sent the applicant a request for revisions for the deferred submittal of the EPS-1A & ESP-1B soffit framing levels 1-3. JCM
Plan Modification Accepted  8/13/2014 DONE
DetailsTisha Gallop
Plan Modification accepted for the incorporation of the approved AMMR M10 - Fire Rated Protection to exterior stairway documents in to project drawings; submtitted three copies of response to Fire comments and plan sheets A0-00-B, A0-00-R, A0-00-S, A0-00-T, A0-03-0, A0-04-0, A0-05-0, A0-?, AD-41-1; routed to John Menard.
Routing - PLAN CHECK8/13/2014 8/13/2014 PASS
DetailsJohn Menard
plan mod for stairway fire curtain
Routing Off Site - STRUCTURAL7/17/2014 8/13/2014 FAIL
DetailsJohn Menard
Deferred submittals - Metal framing systems level 6-7, revisions & level 8 area "A" EPS-1A & ESP-1B soffit framing levels 1-3
Received comment list from consulting structural engineer for the EPS-1A & ESP-1B soffit framing levels 1-3. JCM - Metal framing systems level 6-7, revisions & level 8 area "A" PASSED 8/13/2014 JCM
Routing Off Site - STRUCTURAL7/31/2014 8/12/2014 FAIL
DetailsJohn Menard
deferred submittal Fall Protection System
Routing Off Site - STRUCTURAL7/31/2014 8/12/2014 FAIL
DetailsJohn Menard
Deferred submittal Glass Guards at Garage level 5
Plan resubmittals requested  8/12/2014 DONE
DetailsJohn Menard
Sent the applicant a request for resubmittals for the structural review of the deferred submittals of the glass guards at Level 5 and the fall protection system. JCM
Additional plans submitted  7/31/2014 DONE
DetailsTisha Gallop
Deferred submittal for Fall Protection safety system; taken to John Menard.
Additional plans submitted  7/29/2014 DONE
DetailsTisha Gallop
deferred submittal for Glass Guardrails on level 5 of the Garage; taken to John Menard.
Plan resubmittals received  7/16/2014  
Received a DEFFERED SUBMITAL" with the following in items: 2 sets of SS0-1, SS0.2, SS-A3-06-A, SS-A3-07-A, SS-3-08-A, SS-5.01, SS-5.02, SS-5.05, SS-5.06, SS-7.9, SS-7-10, SS-7-11, SS7-12, CS4-01A, CS4-02A, CS4-03A, CS7.1, CS7.2, CS7.3, CS7.4, 3 sets fof structural calcs. Then given to John Menard
Routing Off Site - STRUCTURAL7/3/2014 7/11/2014 PASS
DetailsJohn Menard
1st response to review of deferred concrete curtain walls - Approved revisions, but requires that the plans be stamped by the project engineer. JCM
Plan resubmittals received  7/3/2014 DONE
DetailsCandy A. Nichols
received 3 sets of defferred submital responses-sheets D1, D1A, D2, D3, D4, D5, D6, 3 Engineering packets- took to John M. (response to 1st review of deferred concrete curtain walls)
Plan resubmittals requested  6/23/2014 DONE
E-mailed the applicant a copy of the structural review comments for the deferred submittal for the Structural Metal Stud Framing Levels 5-7. JCM
Routing Off Site - STRUCTURAL6/6/2014 6/23/2014 FAIL
DetailsJohn Menard
deferred submittal for Structural Metal Stud Framing Levels 5-7
Routing Off Site - STRUCTURAL6/11/2014 6/23/2014 PASS
DetailsJohn Menard
Received letter approving structural review for Glu-Lam support curtain walls and glazing for levels 5-8. JCM
Plan resubmittals requested  6/16/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review comments for the structural metal stud walls for levels 4-6. JCM
Routing Off Site - STRUCTURAL5/22/2014 6/13/2014 FAIL
DetailsJohn Menard
deferred submittal for structural metal stud framing levels 4-6
BLD-Framing/Rough-in6/11/20146/12/20146/12/2014APASS
DetailsDave Hannah
Requesting a sheathing inspection for Thursday AM. Multi-Purpose Studio on Level 5 - west and south elevations. Contact Rudy with NWI at ###-####. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
Telephone call  6/11/2014 DONE
DetailsChristina Prado
called action couriers for pick up
Additional plans submitted  6/10/2014 DONE
deferred submittal for Glulam Curtain Wall & Glazing levels 5-8; taken to John Menard. (the calcs for these levels were turned in with levels 1-4)
Telephone call  6/6/2014 DONE
DetailsTisha Gallop
called Noelle and told her deferred submittal plans for (1) Folding Doors in curtain wall, level 1; (2) Precaset roofs at stairs; (3) Glulam durtain wall and glazing levels 1-4; are ready for pick up.
Additional plans submitted  6/5/2014 DONE
DetailsTisha Gallop
deferred submittal for Structural Metal Stud Framing Levels 5-7; three copies of plans and calcs taken to JCM
Plan resubmittals requested  6/4/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the deferred submittal of the concrete curtain walls. JCM
Routing Off Site - STRUCTURAL5/22/2014 6/2/2014 PASS
DetailsJohn Menard
deferred submittal for folding glass doors at exterior walls of kitchen
Routing Off Site - STRUCTURAL5/15/2014 6/2/2014 PASS
DetailsJohn Menard
deferred submittal for Glu-Lam curtain wall
Routing Off Site - STRUCTURAL5/15/2014 6/2/2014 FAIL
DetailsJohn Menard
deferred submittal for concrete curtain wall
Telephone call  5/22/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Additional plans submitted  5/21/2014 DONE
DetailsTisha Gallop
deferred submittal for Structural Metal Stud Framing, three copies of plans and calds; taken to John Menard
Plan resubmittals received  5/16/2014 DONE
DetailsTisha Gallop
received three copies of deferred submittal for Kitchen Folding Doors within Curtain Wall; taken to John Menard
Plan resubmittals received  5/15/2014 DONE
DetailsChristina Prado
Received three sets of plans ans related structural calcs for deffered submittals for Glass FIber Reinforced Concrete as well as GluLam Curtain Wall & Glazing on levels 1-4;Plans taken to John Menard for review
BLD-Other5/2/20145/2/20145/2/2014PPASS
DetailsDave Hannah
kevin - fire proofing insp Phone #: ###-####
BLD-Framing/Rough-in5/1/20145/1/20145/2/2014APART
DetailsDave Hannah
fire calking rated assembly//###-#### Shane at rooflinekitchen ok
FIRE-Final Inspection5/1/20145/1/20145/1/2014PDEFR
DetailsForrest France
shane - as late as possible please call 1/2 hr prior Phone #: ###-#### * Note- intended for a structural inspection of a rated assembly*
Telephone call  4/23/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up of two plan rolls for two separate deferred submittals.
Additional plans submitted  4/22/2014 DONE
DetailsTisha Gallop
received deferred submittal for Precast Roofs at Stairs; received three copies of plans and structural calcs; taken to John Menard.
BLD-Conference4/17/20144/18/20144/18/2014APASS
DetailsDave Hannah
Call Joey JKB Construction with comments or questions ###-#### Phone #: ###-#### >> Inspection requested via web by Leonard Dooms
BLD-Framing/Rough-in4/14/20144/15/20144/15/2014APASS
DetailsDave Hannah
Requesting inspection for the following items. Please call Rudy with Northwest Interiors to coordinate inspection ###-####.

1. Exterior Framing Inspection - Inspiration Studio.

2. Exterior Framing Inspection - at grid G around the helix on Level 4 (east and west sides).

3. Sheathing Inspection at Service Core for Levels 1-4 (excluding west and south elevations at just the service elevator). Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Framing/Rough-in3/25/20143/25/20143/25/2014PPART
DetailsDave Hannah

requesting exterior framing inspection at the lobby/kitchen. Grid lines 9.4-9.5 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ok to start ext sheeting
BLD-Framing/Rough-in3/20/20143/21/20143/21/2014APASS
DetailsDave Hannah
requesting exterior sheathing inspection at the kitchen. Grid lines 9.3-9.3a. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
BLD-Other3/18/20143/19/20143/20/2014PDONE
DetailsDave Hannah
Field walk with special inspector and field superintendent Zac Ross. Zac''s cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
BLD-Framing/Rough-in3/11/20143/12/20143/12/2014APART
DetailsJim Sly
Requesting an exterior framing inspection for the Lobby/Kitchen Studio. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
Insp. of South wall Lobby/Kitch/studio....Rock, ice/water shield, flashing, Vertical aluminum screwed at 8" OC, and Horizontal purlins. OK to install finish product.
BLD-Framing/Rough-in2/17/20142/18/20142/19/2014APASS
DetailsDave Hannah
Need exterior steel stud framing inspection at the kitchen. Grid lines 9.3-9.3a. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
Routing Off Site - STRUCTURAL11/27/2013 12/6/2013 PASS
DetailsJohn Menard
11-27-13 called Action Couriers for pick up - Received letter from consulting structural engineer approving pioneer stair and skylight resubmittals. JCM
Plan resubmittals received  11/26/2013 DONE
DetailsChristina Prado
Received three sets of plan review comments and three sets of plans marked S3-03-A-R;Taken to John M for review
Plan assigned to (JCM)10/29/2013 11/22/2013 PASS
DetailsJohn Menard
deferred submittal for Precast Pioneer Stair
Routing Off Site - STRUCTURAL11/21/2013 11/22/2013 PASS
DetailsJohn Menard
E-mailed the consulting structural engineer a copy of the response for the Pionneer precat stairs. JCM
Plan Reviewer's activity  11/22/2013 DONE
DetailsJohn Menard
Took issue copy of pioneer stair precast concrete stairs to the front counter for pickup by applicant. JCM
CHANGE STATUS TO (ISS)  11/22/2013 DONE
DetailsTisha Gallop
Per Rita keep status ISS so they can schedule insp online.
Plan resubmittals received  11/21/2013 DONE
DetailsTisha Gallop
received three copies of structural response memo to deferred submittal for Precast Pioneer Stairs. No plans received. Taken to John Menard.
Routing Off Site - STRUCTURAL10/30/2013 11/15/2013 FAIL
DetailsJohn Menard
Plan resubmittals received  10/29/2013 DONE
DetailsTisha Gallop
received deferred submittal for Precast Pioneer Stair; received three copies of structural calculations and plan sheets E0.1, E1.0, E2.9, E2.10, E2.11, E3.3; routed to John Menard.
Plan Reviewer's activity  10/10/2013 DONE
DetailsJohn Menard
Took to the front counter the deferred submittals for the precast guardrails, precast building stairs at area A and precast stairs for above grade garage. JCM
Routing Off Site - STRUCTURAL9/30/2013 10/9/2013 PASS
DetailsJohn Menard
9-30-13 called Action Couriers for pick up
Permit Ready to Issue  10/1/2013 DONE
DetailsChristina Prado
deferred submittal approved 9-25 by JCM
Issue PAID IN FULL permit  10/1/2013 DONE
DetailsTisha Gallop
Plan Reviewer's activity  9/25/2013 PASS
DetailsJohn Menard
Reviewed and approved floor and roof decking deferred submittal. JCM
Telephone call  9/25/2013  
9-25-13 called left message for Ron Allen that the deferred submittal for metal decking is ready for pick up///dld
Additional plans submitted  9/24/2013 DONE
rec'd deffered submittals for precast stairs located in region A. rec'd three copies of calcs and sheets E0.1; E1.0; E2.0; E2.2; E2.3; E2.4; E3.0; E3.1 - taken to JCM
Office Staff conference/action  9/19/2013 DONE
Mark Bowen requested review of impact fees due to unique nature of project. Met with Tonya Wallace, Cheyne Weston and Jason Blais. Tonya and Cheyne agreed to allow removal of open air walkways and patios provided fees charged for ramp and surface parking lot under garage. Sq. ft. document attached.
Plan Reviewer's activity  9/9/2013 DONE
DetailsJohn Menard
Reviewed and approved final revisons for the deferred precast concrete stairs. JCM
Additional plans submitted  9/6/2013 DONE
DetailsTisha Gallop
Received deferred submittal for metal decking. Received three copies of ES Evaluation Report and plan sheets D1, D2, D3, D4, D5, D6, D7, D8; taken to John Menard.
Plan resubmittals requested  9/6/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the precast concrete stairs. JCM
Routing Off Site - STRUCTURAL8/19/2013 8/30/2013 FAIL
DetailsJohn Menard
Called Action Courier for pick up @ 2:30pm - precast concrete stairs. JCM
Plan resubmittals received  8/26/2013 DONE
DetailsChristina Prado
Received three sets of revised calcs for the above grade precast stairs deffered submittal for this project. Calcs and letter taken to John for review
Inspection Record Card- Bld  8/21/2013 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  8/21/2013 DONE
DetailsTisha Gallop
reprinted with correct parcel number
Telephone call  8/21/2013 DONE
DetailsTisha Gallop
called Noelle and left vm permit is ready, fee due, need GC form and ACHD.
Permit Ready to Issue  8/21/2013 DONE
DetailsTisha Gallop
Plan assigned to (JCM)1/4/20131/4/20138/20/2013 PASS
DetailsJohn Menard
1st Review completed 3/27/2013. JCM
PLANS/APPL TAKEN TO FRONT DESK  8/20/2013 DONE
DetailsJohn Menard
Routing - PLAN CHECK5/20/2013 8/20/2013 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL8/7/2013 8/13/2013 FAIL
DetailsJohn Menard
Pre-cast stairs - deferred submittal. JCM
Plan resubmittals received  8/13/2013 DONE
DetailsChristina Prado
Received two sets of revised plan sheets marked A00-00-B, A0-00-B1, A0-00-C, A0-00-L, AD-1-1, AD-1-2, AD-1-3, AD, 5-1, AD-5-2, AD-6-1, AD-7-1, AD+-8-1AD-8-2, AD-9-1, AD-16-2, AD-21-4AD-22-1, AD-23-1, AD-24-1 & AD-37-2 as well as 2 plan review responses. Plan inserted by arch rep and taken back to John for review
Plan resubmittals received  8/7/2013  
DetailsJohn Menard
8-7-13 received 1 deferred submittal sheet,and 3 copies of sheets
E0.1,E1.0,E2.0,E2.1,E2.2,E2.3,E3.0 sent to John M.
Routing Off Site - STRUCTURAL7/10/2013 7/12/2013 PASS
DetailsJohn Menard
Plan resubmittals requested  7/11/2013 DONE
DetailsJohn Menard
E-mailed the applicant a letter requesting additional plan revisions. JCM
Plan resubmittals received  7/10/2013 DONE
DetailsChristina Prado
Received one response letter for deferred submittal of precast Guardrails and three sets of revised sheets marked E4.1
Telephone call  7/10/2013 DONE
DetailsChristina Prado
called action couriers for pick up
Plan resubmittals received  6/25/2013 DONE
DetailsChristina Prado
received twosets of revised calcs, response letter and plans marked A0-00-B, A0-00-B1, A0-00-C, A0-01-N, A0-01-S, A0-02-0, A0-03-0, A0-04-0, A0-05-0, A0-06-0, A0-07-0, A0-08-0, A2-01-0, A2-02-0, A2-03-0, A2-04-0, A2-05-0, A2-06-0, A2-07-0, A2-08-0, A3-01-A, A3-02-A, A3-03-A, A3-04-A, A3-05-A, A3-06-A, A3-07-A, A4-01-0, A4-02-0, A4-03-0, A4-04-0, A4-05-0, A4-06-0, A5-04-01,A5-04-01, A5-04-02, A5-04-03, A5-04-05, A5-04-06, A5-04-07, A5-05-01, A5-05-02, A5-05-03, A5-05-04, A5-05-06, A6-01-01, A6-01-02, A6-01-04, A6-01-05, A6-01-06, A6-01-07, A6-01-08, A6-01-09, A6-01-10, A6-02-01, A6-02-02, A7-01-02, A7-04-02, AD-1-1, AD-1-2, AD-14-3, AD-16-2, AD-26-1, AD-32-1, AD-33-1 & AD-34-1;Taken to John Menard for further review
Plan resubmittals requested  6/24/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the precast concrete guards requesting some resubmittals. JCM
Routing Off Site - STRUCTURAL6/7/2013 6/21/2013 FAIL
DetailsJohn Menard
deferred submittals for precast guardrails - Received comment list from consultng structural engineer requesting revisions. JCM
Plan resubmittals received  6/7/2013 DONE
DetailsTisha Gallop
received three copies of structural calcs and plan sheets E0.1, E1.0, E1.1, E1.2, E2.0, E2.1, E2.2, E2.3, E2.4, E2.5, E2.6, E2.7, E2.8, E3.0, E3.1, E3.2, E4.0, E4.1, E5.0, E6.0, E6.1, E6.2, E6.3, E6.4, E6.5, E6.6, E6.7, E6.8; taken to John Menard.
Plan resubmittals requested  6/4/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of a letter requesting additional revisions. JCM
Routing - PLAN CHECK5/3/2013 6/4/2013 FAIL
DetailsJohn Menard
Plan resubmittals received  6/3/2013 DONE
DetailsChristina Prado
Received five sets(Two small, three large -for Mike Hedge) of revised plan sheets marked E0-03, E0-04, E1-01-O, E1-01-A, E1-01-B, E1-01-C, E1-01-D, E1-01-E, E1-01-F, E1-01-G, E1-01-H, E1-01-I & E5-07; Plans inserted by Noelle and taken back to John Menard for review
Routing PW Drainage5/17/2013 5/20/2013 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS5/9/2013 5/20/2013 PASS
DetailsConnie Baumgartner
Plan resubmittals received  5/17/2013 DONE
DetailsChristina Prado
Received 3 large sets of plans marked C2-04, C2-04-1, & C3-02 to be given directly to Brian Murphy and 2 smaller set of sheets C2-04-1, C2-04-1 & C3-02 to be insterted by Matt;Plans taken back to public works per Angies request
Routing PW Street Lights5/13/2013 5/15/2013 PASS
DetailsMike D Hedge
Plan resubmittals received  5/14/2013  
5-14-13 received 2 addendum to the construction documents,& 2 copies of sheets C2-04-0, C2-04-01, C3-02,P2-01-A, P2-02-AP2-01-A inserted by noelle and sent back to pw
Routing PW Drainage5/9/2013 5/14/2013 FAIL
DetailsBrian Murphy
needs revisions
Routing PW Sewer Design5/10/2013 5/13/2013 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste5/13/2013 5/13/2013 PASS
DetailsPeter J. McCullough
Trash enclosure to be built as shown on resubmittal sheet A2-01-0 dated 4-30-13 only.
Plan resubmittals received  5/10/2013  
5-10-13 received 2 response,2 specifications 2 letters to Angie Brosious and 2 copies of sheets a0-00-b, a0-00-b1, a0-00-b2, a0-00-b3, a0-00-c, a0-00-e, a0-00-m, a0-00-n, a0-00-0, a0-00-p, a0-00-q, a0-01-0, a0-01-n, a0-02-0, a0-03-0, a0-03-1, a0-04-0, a0-05-0, a0-06-0, a2-00-0, a2-01-0, a2-05-0, 2-06-0, a3-01-a, a3-01-b,a3-01-j, a3-05-a, a3-06-a,a4-01-0, a4-05-0, a4-05-a, a4-06-0, a4-06-a, a5-03-01, a5-04-01, ad-32-1, ad-33-1, ad-34-1 inserted by Noelle ,plans taken back to PW/Brian M.
Plan resubmittals received  5/8/2013 DONE
DetailsChristina Prado
Received two review comment response letter as well as two sets of revised plans marked C2-03-0, C2-03-1, C2-04-0, C2-04-1, C2-05-0, C2-05-1 & C3-02. Plans inserted by Noelle and taken back to John for review
Routing - FIRE4/30/2013 5/3/2013 PASS
DetailsScott Arellano
Attached comments to plans. Signed AMMR's are necessary prior to issuance of permit.
Meeting  4/30/2013 DONE
DetailsScott Arellano
Onsite meeting conducted with (Architect) Jason Butler, (Project Superintendent), Fire Marshal, and Scott Arellano regarding Fire Pump Room Construction.
Plan resubmittals received  4/30/2013 DONE
DetailsTisha Gallop
Received two copies of plan review response, Fire code review response, memo from engineer, plan sheets Cover, A0-00B, A0-00B1, A0-00B2, A0-00B3, A0-00C, A0-00D, A0-00E, A0-00F, A0-00L, A0-01-0, A0-01-N, A0-01-S, A0-02-0, A0-03-0, A0-03-1, A0-04-0, A0-04-1, A0-05-0, A0-06-0, A0-06-1(new), A0-07-0, A2-01-0, A2-02-0, A2-04-0, A2-05-0, A2-06-0, A2-07-0, A2-08-0, A3-01-A, A3-01-B, A3-01-C, A3-02-A, A3-02-B, A3-02-C, A3-03-A, A3-03-B, A3-03-C, A3-04-B, A3-04-C, AC-05-B, A3-05-C, A3-06-B, A3-06-C, A3-07-A, A3-07-B, A3-07-C, A3-08-B(new), A3-08-C, A4-01-0, A4-01-A, A4-01-B, A4-01-C, A4-02-0, A4-02-A, A4-02-B, A4-03-0, A4-03-A, A4-03-B, A4-03-C, A4-04-0, A4-04-A, A4-04-B, A4-04-C, A4-05-0, A4-05-A, A4-05-B, A4-05-C, A4-06-0, A5-02-00(new),A5-02-02, A5-02-03, A5-02-04, A5-02-5, A5-02-06, A5-02-06B, A5-02-07, A5-02-09, A5-02-10, A5-02-11, A5-02-12, A5-02-13, A5-02-14, A5-02-15, A5-02-16, A5-02-17, A5-02-18, A5-02-19, A5-02-22(new), A5-02-23(new), A5-02-24(new), A5-02-25(new), A5-02-26(new), A5-02-27(new), A5-02-28(new), A5-03-01, A5-04-01, A5-04-02, A5-04-03, A5-04-05, A5-04-06, A5-04-07, A5-05-01, A5-05-02, A5-05-03, A5-05-04, A5-05-06(new), A6-01-01, A6-01-03, A6-01-04, A6-01-05, A6-01-06, A6-01-07, A6-01-08, A6-01-09, A6-01-10, A6-02-01, A6-02-02, A8-10-00(new), A8-10-01(new), A8-10-02(new), A10-10-01(new), AD-1-1, AD-1(new), AD-1-2(new), AD-7-1(new), AD-16-2(new), AD20-1, AD21-1, AD21-4, AD32-1, AD33-1(new), AD34-1; inserted by arch. rep and taken back to John Menard.
Routing - PLAN CHECK4/12/2013 4/19/2013  
DetailsJohn Menard
Routing - Design Review4/19/2013 4/19/2013 PASS
DetailsSarah Schafer
Approved per DRH10-00178.
Routing PW Drainage4/9/2013 4/12/2013 FAIL
DetailsBrian Murphy
NEEDS REVISIONS HAVE CALL INTO ENGINEER
Routing PW Solid Waste4/12/2013 4/12/2013 FAIL
DetailsPeter J. McCullough
Trash enclosure does not meet specifications and two different designs are shown (A3-01-B & A7-15-2).

Contact: Peter McCullough, ###-####
Routing - PUBLIC WORKS4/2/2013 4/12/2013 FAIL
DetailsConnie Baumgartner
Routing PW Geothermal4/5/2013 4/9/2013 PASS
DetailsJon R. Gunnerson
Have been in contact with Mark Bowen for geothermal line locations.
Routing PW Sewer Design4/2/2013 4/5/2013 FAIL
DetailsKyle S. Rosenmeyer
Match crowns of different sized pipe in Manholes. Provide labeling as noted on plan sheets. Pipe inverts shown in manholes do not not comply with Boise City standards.
Routing PW Street Lights4/2/2013 4/2/2013 FAIL
DetailsMike D Hedge
No Street Light plans in set.
Routing - PLAN CHECK3/27/2013 4/2/2013  
DetailsJohn Menard
Plan resubmittals received  3/28/2013 DONE
DetailsChristina Prado
received two sets of response letter,spec books and plans marked A0-00-B, A0-00-B1, A-00-B2, A-00-B3, A1-01-1, A2-01-0, A2-01-N, A2-01-0S, A2-03-0, A2-05-02, A3-01-A, A3-01-B, A3-01-C, A3-01-D, A3-01-E, A3-01-F, A3-01-G, A3-01-H, A3-01-J, A3-02-A, A3-02-J, A3-03-A, A3-03-J, A3-04, A, A3-04, J, A3-05-A, A3-05-BB, A3-05-C, A3-06-A, A5-01-01, A5-01-02, A5-02-01, A5-02-02, A5-02-03, A5-02-04, A5-02-05, A5-02-06, A5-02-07, A5-02-08, A5-02-09, A5-02-10, A5-02-11, A5-02-12, A5-02-13, A5-02-14, A5-02-15, A5-02-16, A5-02-17, A5-02-18, A5-02-19, A5-04-05, A5-04-06, A6-01-01, A6-01-02, A6-01-02B, A6-01-02C, A6-01-03, A6-01-04, A6-01-05, A6-01-06, A6-01-07, A6-01-08, A6-01-09, A6-01-10, A6-01-12, A6-01-13, A6-01-14, A7-01-01, A7-04-02, A7-10-1, A7-10-2, A7-15-02, AD-12-01, AD-12-02, AD-14-02, AD-15-01, AD-15-02, AD-18-02, AD-19-02, AD-21-1, AD-21-2, AD-21-3, AD-21-4, C2-03-0, C2-03-1-C2-04-0, C2-04-1, C2-05-2, C2-05-3, C2-02, L-01-0, L-01-1N, L-01-1S, L-03-1, L-03-2, L-05-1, L-05-2, LT1-01-0, LT1-01-A, LT1-01-B, LT1-01-C, LT1-01-D, LT1-01-E, LT1-01-F, LT1-01-G & LT1-01-H; Given to John Menard for further review
Routing - FIRE3/15/20133/15/20133/27/2013 FAIL
DetailsScott Arellano
Emailed and faxed resubmittal items to the architect.
1st review completed  3/27/2013 FAIL
Failed Planning, PW, Plumbing, Plan Check and Fire
Route to Impact Fee Review3/15/20133/20/20133/18/2013 PASS
DetailsCindy M. Gould
Plan resubmittals requested  3/15/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK2/12/2013 3/15/2013 FAIL
DetailsJohn Menard
John Menard
Routing - PLUMBING3/4/2013 3/5/2013 PASS
DetailsDaryl Spivey
Per plans and 2009 ISPC.
Plan resubmittals received  2/27/2013 DONE
DetailsChristina Prado
Received two sets of plans marked C2-04-0, C2-04-1, C2-05-2, C2-05-3, C3-02, P0-03, P2-01-A, P2-01-B, P2-01-C, P2-01-D, P2-01-G, P3-01-0, P3-03-0, P4-02, P4-11, P4-12, P4-22, PG-1-00, PG2-00A, PG-2-00B, PG-2-00C & PG-2-00D; Plans inserted by arch rep and taken back to John M for review
Routing - PLANNING2/5/2013 2/12/2013 FAIL
DetailsSarah Schafer
Sarah Schafer

2/8/13 - I provided Angie Brosious (PM) with an e-mail on 2-7-13 telling of the concerns with the permit package. A more formal document was provided on 2-8-13 for the JUMP team regarding the differences between the building permit and the Design Review as well as inconsistencies within the building documents. We are awaiting the JUMP teams response to determine how to proceed with the review from the Planning side. The one major difference between the building set and the DR is the removal of the metal mesh around the exterior of the ramp system. This change will require a committee level DR modification if they wish to proceed as shown in the document. Most other changes just need to be document through DR via updated plans

2-12-13 - I am going to go ahead and pass the plans on to Plan Review as a conference call has not yet been scheduled but the information needed in order for Planning to pass the document has been transmitted to the applicant. I have uploaded the memo to Documents as DOC_Planning Comments 2-8-13.
Routing - PLUMBING1/17/2013 2/5/2013 FAIL
DetailsDaryl Spivey
1. All covered area drains and storm drains to drain into sanitary drains in to flammable intercepter.
2. The Wilkins dual check valve model 700XL is not an acceptable backflow valve. Must be a testable device.
3. The 4 inch oil intercepter vent shall vent out seperately.
4. Basement plans do not match up with plumbing on the 1st floor plans.
5. 3 inch waste on P4-01 shows that it continues on to P4-02 at note 2. No connection was found on P4-02.
Routing - MECHANICAL  1/25/2013 PASS
Very limited mechanical review at this time.
Routing - PUBLIC WORKS1/7/2013 1/17/2013 FAIL
DetailsConnie Baumgartner
Routing PW Drainage1/15/2013 1/17/2013 FAIL
DetailsBrian Murphy
NEEDS REVISIONS
Routing PW Geothermal1/13/2013 1/17/2013 FAIL
DetailsJon R. Gunnerson
Left 2 messages with Aundre Skinner regarding points of connection for geothermal. Jon G.. 1-15-13
Routing PW Sewer Design1/8/2013 1/9/2013 FAIL
DetailsKyle S. Rosenmeyer
Different pipe sizes not matched correctly in public MH's, serivce line grades minimum of 2% in the R/W. Spoke with sewer engineer at MKA on 1/9.
Routing PW Solid Waste1/8/2013 1/8/2013 FAIL
DetailsPeter J. McCullough
Enclosure for trash compactors does not meet specifications.

Contact: Peter McCullough ###-####
Routing PW Environmental1/8/2013 1/8/2013 PASS
DetailsWalt Baumgartner
Kitchen wastewater shall route to grease interceptors as required under previous approvals. See DRH10-00178 conditions for parking garage requirements and prohibitions on discharge of building foundation dewatering or stormwater discharge to sanitary sewer system. Call ###-#### with questions.
Routing PW Street Lights1/8/2013 1/8/2013 FAIL
DetailsMike D Hedge
Routing PW Sewer Rating1/8/2013 1/8/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing1/7/2013 1/7/2013 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div1/4/2013 1/7/2013 PASS
DetailsDave Abo
Parcel J of Record of Survey 9185.
Application received 1/4/20131/4/2013 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  1/4/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/4/2013 DONE
DetailsTisha Gallop
Routing Off Site - STRUCTURAL4/23/2014    
DetailsJohn Menard
deferred submittal for structural metal stud framing levels 1-3
Routing Off Site - STRUCTURAL4/23/2014    
DetailsJohn Menard
deferred submittals for precast roofs at stairs
Routing - PLAN CHECK10/29/2014    
DetailsJohn Menard
Plan mod for Makers Dust Control System and Deferred submittal for the skylight and canopy systems. JCM