Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-00534
StatusIssued
Name ESI
Site Address 11964 W FAIRVIEW AVE
Project NameVillage East - Building K
Customer NumberBLD19-00526-00536, 538-539
ePlanReviewNo
Description
(13 PERMITS IN EPLAN UNDER BLD19-00526) (BUILDING K – VILLAGE EAST APARTMENTS – RESIDENTIAL) (PUD18-00042) (DRH18-00528) The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 22,793 square foot, 4 story apartment building (5,959 square foot 1st story, 5,959 square foot 2nd story, 5,959 square foot 3rd story, and 4,916 square foot 4th story) with a total of 16 dwelling units (4 on each story). All dwelling units on the 1st story are required to comply as Type B dwelling units (one is also required to comply as Type A in Building G and in Building K). Since there is no elevator in this building, the dwelling units located on the 2nd, 3rd and 4th stories are not regulated for accessibility to the disabled. Work is to include concrete footings, concrete stem walls between conditioned and unconditioned spaces, concrete pedestals, concrete slab on grade with thickened slab at interior bearing walls and R-10 perimeter slab edge insulation between conditioned and unconditioned spaces, 2x6 walls between conditioned and unconditioned spaces with R-20 cavity insulation and R-3.8 continuous insulation, wood columns, shear walls with gypsum panels or structural wood panels and hold downs, an unconditioned 1-hr fire-resistance-rated corridor on each story, two unconditioned 2-hr fire-resistance-rated exterior stairways, 1-hr dwelling unit separation walls between dwelling units, draftstops in the attic, 1-hr dwelling unit separation floors between dwelling units, engineered wood truss roof system with a structural wood panel roof deck and R-49 insulation installed on top of the ceiling with the attic vented to the outside, roof overbuilds, ladder and roof hatch to access roof top heat pumps, exterior windows, interior doors between conditioned and unconditioned spaces, exterior cementitious lap siding, exterior brick veneer, exterior stucco, guards, handrails, asphalt shingles, 3-ply roofing membrane at flat roof areas, roof drains and overflow drains, interior millwork, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The design for the engineered wood trusses is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/12/20208/13/20208/13/2020PFAIL
DetailsGreg Ruxton
Pavement required for TCO not complete.

Paving operations for fire truck access should wrap up in the morning.Other small items addressed from Troy Cobbley''s visit on Wednesday. Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Final8/12/20208/13/20208/13/2020ANR
DetailsTell Riley
Need a couple hours in the morning. After 10 am inspection preferred Phone #: ###-#### Inspection requested via web by Travis Blackburn
FIRE-Final Inspection8/11/20208/12/20208/12/2020PFAIL
DetailsTroy Cobbley
Life safety will be ok for a temp when the additional pavement has been layed as agreed. For a final the permanant address and heaters will need to be provided and veriifed.

Lee *screened Phone #: ###-####
CHANGE STATUS TO (ISS)  8/12/2020 DONE
Status altered after DR routing added and completed - permit needs to stay in issued status.
Routing - Design Review8/11/2020 8/11/2020 PASS
DetailsKatelyn Menuge
BLD-Wall cover6/2/20206/2/20206/2/2020PPART
DetailsTell Riley
Drop ceiling on 1st and 2nd floors for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//soffits ok to cover when fire caulk is fixed as discussed//areas will be framed down in laundry//fire tape areas as discussed 2nd floor//Jeremy will send photos to confirm//
BLD-Wall Bracing5/22/20205/22/20205/22/2020PPART
DetailsTell Riley
Reinspect for gyp shear on all floors Phone #: ###-#### Inspection requested via web by Travis Blackburn//4th and 3rd floor ok//fix shear wall in 2nd floor, block edges//add screws at first floor//
BLD-Wall Bracing5/21/20205/22/20205/22/2020ACANC
DetailsTell Riley
Re inspect of gypsum board shear on all floors Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Wall cover5/21/20205/21/20205/21/2020PPART
DetailsTell Riley
3rd and 4th floor drop ceiling inspection for cover along with gyp shear in the entire building Phone #: ###-#### Inspection requested via web by Travis Blackburn//drops ok, third floor pending fire sprinkler approval//shear walls will need to be re-inspected after more screws are added//
BLD-Wall cover5/20/20205/20/20205/21/2020PCANC
DetailsTell Riley
Inspect drop ceilings on bldg K 4th floor, possibly 3rd also Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Framing/Rough-in5/11/20205/11/20205/11/2020PPART
DetailsTell Riley
Corridor inspection to cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//add lags in areas marked//fire caulk penetrations where marked//
BLD-Energy code compliance5/6/20205/7/20205/7/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Framing/Rough-in5/4/20205/5/20205/5/2020APART
DetailsTell Riley
Inspection to insulate 1st floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts as noted on floor//fix holddown that is not installed//fire caulk areas noted//photos of repairs will be sent//
BLD-Wall cover4/27/20204/28/20204/28/2020APART
DetailsTell Riley
Cover inspection for 2nd floor only Phone #: ###-#### Inspection requested via web by Travis Blackburn//2nd floor cover ok, add insulation around vent exhausts at exterior wall and at rims where needed//
BLD-Wall cover4/23/20204/24/20204/24/2020APASS
DetailsDave Hannah
Insulation inspection to cover 3rd floor only Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Conference4/21/20204/22/20204/22/2020ADONE
DetailsTell Riley
Discuss phased turnover and clubhouse firestopping. Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Framing/Rough-in4/21/20204/22/20204/22/2020APART
DetailsTell Riley
Framing inspection to insulate 2nd floor only. Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to insulate 2nd floor//collars on 3rd and 4th floor installed, and joist repairs were made//
BLD-Framing/Rough-in4/20/20204/21/20204/21/2020PPART
DetailsTell Riley
Inspection on 3rd floor for approval to insulate and cover inspection on 4th floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//4th floor ok to cover when fire collars are on drain pipe//3rd floor ok to insulate, fix sprinkler tenting, add fire collar to drain pipe, fix hole in joist in furnace room on two of the 4 units//
BLD-Conference4/1/20204/1/20204/1/2020PDONE
DetailsTell Riley
met onsite with Matt, plumbing inspector, discussed with Travis need for plumbing plans to be revised for building and all other buildings prior to any passed plumbing inspections//
BLD-Wall cover3/31/20204/1/20204/1/2020APEND
DetailsTell Riley
4th floor only approval to cover. Phone #: ###-#### Inspection requested via web by Travis Blackburn//insulation ok---still need trades inspections completed--need them prior to insulation and cover//
BLD-Framing/Rough-in3/26/20203/27/20203/27/2020APEND
DetailsTell Riley
Shaftliner cover and 4th floor ok to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when firecaulk has been done at shaftliner//ok to insualate 4th floor pending other trades inspections//
BLD-Framing/Rough-in3/24/20203/25/20203/25/2020PNR
DetailsTell Riley
2ND and 3RD Floor preliminary inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//discussed framing corrections for cut joists, will need fixed//some fire caulking, need plumbing and fire alarm finished//
BLD-Framing/Rough-in3/19/20203/20/20203/20/2020APART
DetailsTell Riley
3rd and 4th floor//truss bracing fixed//framing appears to be ok//need mechanical, electrical, and plumbing roughs passed//will need to do walk through before insulation//
BLD-Framing/Rough-in3/18/20203/19/20203/19/2020ACANC
DetailsTell Riley
3rd and 4th floor preliminary walk to check structural aspects. Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Framing/Rough-in3/11/20203/12/20203/12/2020APART
DetailsTell Riley
Preliminary inspection for trusses and structural as time allows Phone #: ###-#### Inspection requested via web by Travis Blackburn//northside 4th floor units trusses ok//south side 4th floor units trusses need bracing//shear straps 4th floor ok//
BLD-Other2/17/20202/18/20202/18/2020APART
DetailsTell Riley
Exterior sheetrock inspection to install weather barrier Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok per pla ns//
BLD-Framing/Rough-in2/3/20202/3/20202/3/2020PPART
DetailsTell Riley
Walk prerock areas in K for insulation Phone #: ###-#### Inspection requested via web by Travis Blackburn//will be ok after hold downs installed//
BLD-Wall Bracing1/14/20201/14/20201/14/2020PPART
DetailsTell Riley
Shear inspection on last wall and h2.5''s to be covered at eves Phone #: ###-#### Inspection requested via web by Travis Blackburn//shear area on exterior south wall ok//see CN for other areas requested to look at//
BLD-Wall Bracing1/8/20201/10/20201/10/2020APART
DetailsTell Riley
Exterior shear and hardware for cover. Interior at a later date Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to cover exterior with wrap--DO NOT COVER south wall until approved for straps and fixed sheathing//
BLD-Conference1/7/20201/8/20201/8/2020PDONE
DetailsTell Riley
Discuss 2hr walls Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Wall Bracing1/7/20201/8/20201/8/2020PNR
DetailsTell Riley
Shear inspection for hardware for exterior cover Phone #: ###-#### Inspection requested via web by Travis Blackburn
BLD-Wall Bracing1/7/20201/7/20201/8/2020PCANC
DetailsTell Riley
BLD-Wall Bracing1/3/20201/6/20201/6/2020APART
DetailsTell Riley
Shear inspection and hardware inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//nailing ok//need to finish straps//provide documentation on nails in pressure treat or use hot dipped galvanized//will need to check hold downs//
BLD-Concrete10/14/201910/14/201910/14/2019PPASS
DetailsTell Riley
Concrete pour at 1pm. Inspection on reinforcing steel at edges of corridor Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok pending specials//
BLD-Concrete10/9/201910/10/201910/10/2019PPART
DetailsTell Riley
We are pouring the slab for building K at 6:30 on Friday morning. Phone #: ###-#### Inspection requested via web by Matt Perry//ok pending specials//
BLD-Concrete10/3/201910/4/201910/4/2019PCANC
DetailsTell Riley
Pouring slab on grade for this building early Monday morning so late inspection should work Phone #: ###-#### Inspection requested via web by Travis Blackburn//cancel per Matt//
BLD-Foundation9/18/20199/19/20199/19/2019PPART
DetailsTell Riley
Concrete pour scheduled for 3:30 Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok to pour//pending special inspections///
BLD-Footing9/16/20199/16/20199/16/2019PPART
DetailsTell Riley
Second half of this building will need inspected for reinforcement.Pour time is after the walls on the clubhouse walls this afternoon Phone #: ###-#### Inspection requested via web by Travis Blackburn//bar fixed while onsite// ok pending specials//
BLD-Footing9/10/20199/12/20199/12/2019PFAIL
DetailsMike Jordan
Concrete pour is at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn. Clearance issues fromm bottom of footing. Needs to install verts in corner, rebar needs to be tied as to resist movement when concrete is placed.
Issue PAID IN FULL permit  8/15/2019 DONE
Print Occupancy Form  8/15/2019 DONE
Permit Ready to Issue  8/13/2019 DONE
DO NOT ISSUE WITHOUT OHTER 13 PERMITS AND VOIDED PERMIT HAS PLAN CHECK FEES
met
RP
GC
Revised Certificate of Value
Routing PW Street Lights8/12/2019 8/12/2019 PASS
DetailsTom Marshall
Plan assigned to (CJW)3/11/20193/11/20198/10/2019 PASS
DetailsCarl Westfall
* (2nd done) 04/08/19 (new buildings - 25 days) (eplan) Village East Apartments (K) (approved pending structural)
Plan Reviewer's activity  8/10/2019 DONE
See the routing under permit BLD19-00526 for all buildings.
PLANS/APPL TAKEN TO FRONT DESK  8/10/2019 DONE
Routing - Design Review8/5/2019 8/5/2019 PASS
DetailsAndrea Tuning
Routing - FIRE7/9/20197/9/20197/16/2019 PASS
DetailsMark Scharfen
07/16-Village East Building K resumbittal. MS. Completed fire review. Uploaded rev_fire 07.16.2019.pdf. All permits ok on fire.
Routing PW Drainage7/15/2019 7/15/2019 PASS
DetailsBrian Murphy
Plan resubmittals received  7/8/2019 DONE
See the routing under permit BLD19-00526 for the 3rd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Routing - FIRE6/13/20196/13/20196/24/2019 FAIL
DetailsMark Scharfen
06/26-Village East Building K resubmittal MS. Completed review and uploaded rev_fire 06.24.2019.pdf. Emailed review to architect.
Routing - Design Review6/17/2019 6/17/2019 FAIL
DetailsAndrea Tuning
A total of 272 bicycle parking spaces will be required. A minimum of 68 of the bicycle parking spaces are required to be covered. To provide a safe, covered and efficient location for the bicycles, design the spaces to be a minimum of 6-feet long and 2.5 feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. A detail of the rack and how it is attached to the wall should be submitted with the building permit.

Vertical curbing shall be utilized adjacent to all landscaping and pedestrian walk ways. Permanent wheel restraints may be utilized in lieu of curbing adjacent to pedestrian walk ways.

All interior and terminal planter islands shall provide at least one Class II tree within all of the interior and terminal planters.

Provide an easement for portions of the Valley Regional transit stop located on private property.

Continue to work with staff to provide a cohesive and quality exterior building design in regard to material breaks, the application of brick on each building and the color palette for the development. This may include providing a brick wainscot or brick corner elements on each building, reevaluating the location of material breaks and further refining the color palette.

Employ techniques to recess windows above the ground floor a minimum of 2-inches from the façade or incorporated window trim at least 4-inches in width. Submit a window detail showing this recess.
Plan Reviewer's activity  6/13/2019 DONE
See the routing under permit BLD19-00526 for the 2nd plan review. None of the permits can be issued until all plan reviews are approved. CJW
Route to Impact Fee Review5/10/20195/13/20195/10/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/11/2019 5/7/2019 FAIL
DetailsCarl Westfall
1st review completed  5/7/2019 DONE
Plan resubmittals requested  5/7/2019 DONE
Routing - Erosion and Sediment3/11/2019 4/25/2019 PASS
DetailsAndy J. Long
see ESC19-00181 for details
Routing - FIRE3/11/20193/11/20194/12/2019 FAIL
DetailsMark Scharfen
IFC 1st review 04.12.2019.pdf
Routing Off Site - STRUCTURAL3/11/2019 3/27/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing PW Sewer Design3/12/2019 3/26/2019 PASS
DetailsDeAnn Brown
Routing PW Solid Waste3/12/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing PW Drainage3/12/2019 3/21/2019 FAIL
DetailsBrian Murphy
Routing - PLANNING3/11/2019 3/19/2019 FAIL
DetailsLeon Letson
See DR comments
Routing - MECHANICAL3/11/2019 3/15/2019 PASS
DetailsTroy James
Routing - Design Review3/11/2019 3/13/2019 FAIL
DetailsAndrea Tuning
Routing - Addressing3/11/2019 3/12/2019 PASS
DetailsDoug Chausow
Bldg K: 11964 W Fairview Ave
Routing - PUBLIC WORKS3/11/2019 3/12/2019 PASS
DetailsAngela Hardy
Routing PW Street Lights3/12/2019 3/12/2019 FAIL
DetailsTom Marshall
Routing - PLUMBING3/11/2019 3/11/2019 PASS
DetailsDaryl Spivey
Meet suds relief requirements and per ISPC.
Intake Approval  3/5/2019 PASS
Application received  2/21/2019 DONE
Application submitted via PDS Online on Feb 21 2019 5:02PM
BLD-Final8/13/20208/14/2020 A 
DetailsTell Riley
Phone #: ###-#### >> Inspection requested via web by Travis Blackburn