Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-01594
StatusFinaled
Name PETRA INC
Site Address 1032 S BROADWAY AVE
Project NameThe Broadway Mixed Use
Customer Number 
ePlanReviewYes
Description
(THE BROADWAY MIXED USED SHELL/CORE) (DRH19-00032) (CUP19-00004) Permit to construct a new 4,429 sq ft, 2-story shell and core building and related site improvements. Work to include: concrete spread footings and ground floor slab; wood framed exterior walls, second floor and wood truss roof; exterior windows and doors; electrical lighting and power; mechanical roof top units and ductwork; rough plumbing. Envelope, lighting, and mechanical in compliance with the 2015 IECC. This is a shell/core permit only; separate tenant improvement permit will be required to finish this building for occupancy. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Special Inspections required per the attached Form 310. NOTE: This building will be fully fire sprinkled and have an approved fire alarm system. The sprinklers are used for future A-2 occupancy. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20207/22/2020 DONE
This permit finaled on the web by Chris Witt
First Notice5/14/20205/14/20207/9/2020 DONE
DetailsBrandon Shaw
mailed 7-9-2020
BLD-Final5/13/20205/14/20205/14/2020PPASS
DetailsBrandon Shaw
Bo Phone #: ###-####
DOC - Permit Finaled5/14/20205/14/20205/14/2020PPASS
DetailsBrandon Shaw
BLD-Wall cover5/7/20205/12/20205/12/2020APASS
DetailsBrandon Shaw
Screened- Bo Phone #: ###-####
BLD-Energy code compliance5/1/20205/4/20205/4/2020APASS
DetailsBrandon Shaw
Sreened- Bo Phone #: ###-####
BLD-Final4/8/20204/9/20204/9/2020AFAIL
DetailsJim Storey
Bo **cleared** Phone #: ###-#### 2 hr pl wall not complet leagers and membrane .// insulation not done.
FIRE-Final Inspection4/3/20204/6/20204/6/2020APASS
DetailsJim Page
Previously noted item has been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.

cleared // Bo Phone #: ###-####
PubWorks Occupancy Approval4/1/20204/1/20204/1/2020 DONE
DetailsTiffany Lowery
FIRE-Final Inspection3/23/20203/25/20203/25/2020AFAIL
DetailsJim Page
Fire sprinkler riser room is not 1 hour rated as required.

Bo Phone #: ###-####
FIRE-Final Inspection3/19/20203/20/20203/20/2020AFAIL
DetailsTroy Cobbley
Need project related fire alarm and fire sprinkler permits finaled, need all small documents. No inspection performed but we did conference on life safety items.

Bo Phone #: ###-####
FIRE-Final Inspection3/19/20203/19/20203/19/2020PFAIL
DetailsJim Page
Associated FIR permits for fire alarm and fire sprinkler are not finaled, FIR permits must be finaled before life fire safety inspection can be performed.

Bo Phone #: ###-####
Zoning Approval3/19/20203/19/20203/19/2020 DONE
DetailsJosh Wilson
BLD-Energy code compliance12/11/201912/13/201912/13/2019PPART
DetailsBrandon Shaw
partial insulation and vapor barrier for 1st floor north wall and section of east wall to the elevator, and exterior elevator wall. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in12/3/201912/4/201912/4/2019PPASS
DetailsBrandon Shaw
Exterior sheeting, roof deck sheeting, hardware.
BLD-Framing/Rough-in11/19/201911/20/201911/20/2019APASS
DetailsBrandon Shaw
framing hardware - holddown bolts HUD2, HUD5, HUD8 Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Energy code compliance9/30/201910/1/201910/1/2019PPASS
DetailsBrandon Shaw
foundation insulation. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Foundation9/30/20199/30/20199/30/2019APASS
DetailsBrandon Shaw
OK to puor, pending special inspection...
BLD-Footing9/30/20199/30/20199/30/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by J.C. Murray
Print Occupancy Form  8/22/2019 DONE
Print Occupancy Form  8/22/2019 DONE
Issue PAID IN FULL permit  8/22/2019 DONE
OVERRIDE  8/14/2019  
Plan assigned to (JAR)6/5/20196/5/20198/14/2019 DONE
DetailsJulie Romig
08/08 - 3rd Rev - 1st Rev Comp - 2nd Rev Comp - 502 Broadway Mixed Use Shell/Core
PLANS/APPL TAKEN TO FRONT DESK  8/14/2019 DONE
Permit Ready to Issue  8/14/2019 DONE
MET bhurlburt@petrainc.net
NEED
GC FORM
Revised Value
RP
ACHD
Routing - Design Review8/12/2019 8/14/2019 PASS
DetailsJosh Wilson
Routing - PLAN CHECK8/3/2019 8/13/2019 PASS
DetailsJulie Romig
Routing - PLAN CHECK7/23/2019 8/1/2019 FAIL
DetailsJulie Romig
Routing - Design Review7/23/2019 7/29/2019 PASS
DetailsJosh Wilson
Routing PW Drainage7/23/2019 7/26/2019 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL7/23/2019 7/26/2019 PASS
DetailsJulie Romig
KPFF 2nd Review
Routing PW Sewer Design7/25/2019 7/26/2019 PASS
DetailsDeAnn Brown
Building is connecting to existing sewer stub.
Routing - FIRE7/23/20197/23/20197/23/2019 PASS
DetailsMark Scharfen
completed fire review. UPloaded rev_fire 07.23.2019.pdf.
Routing PW Street Lights7/23/2019 7/23/2019 PASS
DetailsTom Marshall
Route to Impact Fee Review7/15/20197/18/20197/16/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  7/15/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK6/5/2019 7/15/2019 FAIL
DetailsJulie Romig
Routing - FIRE6/4/20196/5/20197/12/2019 FAIL
DetailsMark Scharfen
07.16.2019-Fire review complete. Needs PIV or rated riser room. Uploaded rev_fire 07.16.2019.pdf and emailed architect.
Routing Off Site - STRUCTURAL6/5/2019 6/18/2019 FAIL
DetailsJulie Romig
KPFF
Routing - Design Review6/5/2019 6/13/2019 PASS
DetailsJosh Wilson
Ok per DRH19-00032
Routing PW Environmental6/6/2019 6/12/2019 PASS
DetailsTerry Alber
Grease interceptor (1500-gallon) shown and approved. Grease waste line shall connect to any tenant space that may house food service.
Routing PW Solid Waste6/6/2019 6/10/2019 PASS
DetailsPeter J. McCullough
Approved for alley service; be aware that service could be affected in future due to the dead-end alley, as other developments could alter the truck's through-access
Routing - PLANNING6/5/2019 6/10/2019 PASS
DetailsDavid Moser
Routing - MECHANICAL6/5/2019 6/7/2019 PASS
DetailsChad Schwendiman
Approved with mark ups
Routing - PLUMBING6/5/2019 6/6/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing PW Street Lights6/6/2019 6/6/2019 FAIL
DetailsTom Marshall
Routing - Addressing6/5/2019 6/6/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/5/2019 6/6/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment6/5/2019 6/6/2019 PASS
DetailsMichael Zawacki
RP needed. Site prep inspection required.
Intake Approval  6/4/2019 PASS
DetailsBrian McGowan
Intake Approval  5/10/2019 FAIL
DetailsBrian McGowan
Please provide the following in order for your Prescreen to be approved:
1. A completed Permanent O and M Agreement.
2. Form # 310 for Special Inspections.
3. Verification of Legal Lot or Parcel.
4. The ESC Narrative needs to be signed.
5. I could not find an Interior Finish Schedule (not on Sheet A51-53)
6. The Structural Section of the Checklist was not completed. Please complete.
Application received  5/7/2019 DONE
Application submitted via PDS Online on May 7 2019 3:07PM
Routing PW Drainage6/6/2019   FAIL
DetailsBrian Murphy
NEEDS O AAND M ,APDEX J