Permanent Occupancy | | | 8/4/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/3/2020 | | DONE |
|
|
|
|
Zoning Approval | 7/31/2020 | 7/31/2020 | 7/31/2020 | | DONE |
David Moser
|
|
|
Group Home it is an allowed use.
|
PubWorks Occupancy Approval | 7/29/2020 | 7/29/2020 | 7/29/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by tracey Garrett// ok for perm. occupancy pending others
|
BLD-Grading Inspection | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by tracey Garrett
|
BLD-Final | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by tracey Garrett need others signed off no card for occ issued per bill.
|
FIRE-Final Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Main entry and rear exit have mag locks installed as required by NFPA101 as well as state requirements for the type of use for this building. Mag locks do release on fire alarm activation and remain unlocked until fire panel is reset. Final life fire safety inspection is complete, signature card not available at time of inspection.
|
Plan Reviewer's activity | | | 7/15/2020 | | DONE |
Michael Hanson
|
|
|
Direction was given from Jason Blais and Carl Madsen to allow keypad operated locks on the doors per State of Idaho requirements for memory care home. Contact Nate Elkins for additional information. nate.elkins@dhw.idaho.gov ###-#### Ext. 3
|
BLD-Footing | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Tony Young
|
|
|
Inspect footings for deck at rear of residence; prior to cover. Phone #: ###-#### Inspection requested via web by tracey Garrett
|
CHANGE STATUS TO (ISS) | | | 7/8/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/1/2020 | | DONE |
|
|
|
Emailed GC to inform them we need a revised value for the plan mod before we can change the status back to issued.
|
OVERRIDE | | | 6/25/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 6/25/2020 | | DONE |
|
|
|
MET
Need Revised Value for plan mod
|
OVERRIDE | | | 6/24/2020 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/24/2020 | | DONE |
|
|
|
plan mod
|
Plan assigned to (M_H) | 6/3/2020 | | 6/24/2020 | | DONE |
Michael Hanson
|
|
|
plan mod: new pergola and deck in lieu of concrete deck. Sheets: S-2.0 and S-2.1
|
Routing - PLAN CHECK | 6/24/2020 | | 6/24/2020 | | PASS |
Michael Hanson
|
|
|
Plan mod for wooden deck and pergola
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2020 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/24/2020 | | DONE |
|
|
|
Need COV for Plan mod (Checked Yes on App for Value Change)
|
Intake Approval | | | 6/17/2020 | | FAIL |
Julie Romig
|
|
|
Sent plan mod prescreen back to applicant to upload structural calculations are missing.
|
Plan Modification Accepted | | | 6/3/2020 | | DONE |
|
|
|
Kady from Hatch Design Architecture requested a plan mod
|
BLD-Other | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PEND |
Tony Young
|
|
|
request DRAINAGE INSPECTOR from Public Works to come to job for consult with contractor. Thank you. Bill''s cell ###-####. or Tracey at office ###-#### Phone #: ###-#### Inspection requested via web by tracey Garrett
|
BLD-Wall cover | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Tony Young
|
|
|
Please inspect prior to sheetrock cover. Thank you. Phone #: ###-#### Inspection requested via web by tracey Garrett,, double drywall ok
|
BLD-Energy code compliance | 4/28/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Tony Young
|
|
|
Inspection needed for energy code, ; wall cover. Thank you. Phone #: ###-#### Inspection requested via web by tracey Garrett
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PART |
Tony Young
|
|
|
Inspection needed for framing, energy code, ; wall cover. Thank you. Phone #: ###-#### Inspection requested via web by tracey Garrett frame ok pending sprinkler pass
|
FIRE-Conference | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | DONE |
Jim Page
|
|
|
Fire confernce is complete, atic heat detection will need to be revised before final inspection for acceptance, current drawing does not cover attic space correctly as discussed with Lee Meridith, Fire Alarm Plan Reviewer.
Tracey- conference Phone #: ###-####
|
BLD-Framing/Rough-in | 4/7/2020 | 4/7/2020 | 4/8/2020 | P | PART |
Tony Young
|
|
|
Request a "partial" framing inspection: Soffits to be inspected per Inspector. Phone #: ###-#### Inspection requested via web by tracey Garrett// soffit ok to cover
|
BLD-Conference | 4/1/2020 | 4/2/2020 | 4/3/2020 | P | PART |
Tony Young
|
|
|
on site conf with all trades,, call 415 if ?s,, on site meeting with all.. code ?s
|
BLD-Conference | 3/27/2020 | 4/2/2020 | 4/3/2020 | P | PART |
Tony Young
|
|
|
Tracey Phone #: 208 ###-####// on site conf with all parties,, owner, builder, trades, etc. to go over code requirements
|
BLD-Wall cover | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, girders ok to apply draft stop on,, exterior shear panels ok to cover
|
BLD-Conference | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Tony Young
|
|
|
?s on firewalls,, take plan reviewer,, went over fire wall/ceiling, draft stops,, R4 requirements
|
BLD-Conference | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Tony Young
|
|
|
?s on firewalls,, take plan reviewer
|
Telephone call | | | 1/22/2020 | | DONE |
|
|
|
sent an email to billgarrettremodeling@gmail.com, stating not all fees were paid and to please let us know once there are due to us not getting a second notice
|
Issue PAID IN FULL permit | | | 1/22/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/22/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/17/2020 | | |
|
|
|
|
Telephone call | | | 1/17/2020 | | DONE |
|
|
|
emailed Jeff Hatch to let him know we need the GC to fill out and sign the form 306.
|
Routing Off Site - STRUCTURAL | 1/15/2020 | | 1/17/2020 | | PASS |
Michael Hanson
|
|
|
Passed per ePlan approval by C. Holladay @ AHJ
|
Routing - MECHANICAL | 1/17/2020 | | 1/17/2020 | | PASS |
Troy James
|
|
|
|
Permit Ready to Issue | | | 1/17/2020 | | DONE |
|
|
|
NEED
ACHD
billgarrettremodeling@gmail.com
met: RP, GC Revised Certificate of Value
|
Plan assigned to (M_H) | 12/2/2019 | | 1/17/2020 | | DONE |
Michael Hanson
|
|
|
1st review completed - 12/30 #502 L3 ePlan - Brightstar Taft
|
Routing - PLAN CHECK | 1/15/2020 | | 1/15/2020 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 1/7/2020 | | 1/13/2020 | | FAIL |
Michael Hanson
|
|
|
AHJ
|
Routing PW Drainage | 1/7/2020 | | 1/10/2020 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/7/2020 | | 1/7/2020 | | FAIL |
Michael Hanson
|
|
|
See building plan review report 01-07-2020.pdf for corrections required.
|
Route to Impact Fee Review | 1/3/2020 | 1/6/2020 | 1/6/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 11/26/2019 | 11/26/2019 | 1/3/2020 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 1/3/2020 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 12/27/2019 | | 12/27/2019 | | FAIL |
Michael Hanson
|
|
|
See building plan review report for corrections required.
|
Routing Off Site - STRUCTURAL | 11/26/2019 | | 12/27/2019 | | FAIL |
Michael Hanson
|
|
|
AHJ
|
Routing - MECHANICAL | 12/9/2019 | | 12/9/2019 | | FAIL |
Troy James
|
|
|
Need to show UL 300A exhaust system for the kitchen range. Emailed correction to Architect.
|
Routing - MECHANICAL | 11/26/2019 | | 12/6/2019 | | FAIL |
Troy James
|
|
|
Sent corrections to heating supply and applicant
|
Routing - Erosion and Sediment | 12/3/2019 | | 12/3/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver approved.
|
Plan assigned to (JAR) | 11/26/2019 | 11/26/2019 | 12/2/2019 | | DEFR |
Julie Romig
|
|
|
(502) Brightstar Taft, ePlan
|
Routing - PLUMBING | 11/26/2019 | | 12/2/2019 | | PASS |
Daryl Spivey
|
|
|
no plan required
|
Routing PW Street Lights | 11/27/2019 | | 12/2/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 11/27/2019 | | 11/29/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 11/26/2019 | | 11/29/2019 | | PASS |
David Moser
|
|
|
group homes are an allowed use in R-1C zone and it complies will all setbacks
|
Routing - PUBLIC WORKS | 11/26/2019 | | 11/27/2019 | | PASS |
Morgan Webb
|
|
|
CREDIT RECEIVED FOR PREVIOUSLY DEMOED HOUSE.
|
Routing - Addressing | 11/26/2019 | | 11/27/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Design | 11/27/2019 | | 11/27/2019 | | PASS |
DeAnn Brown
|
|
|
Connect building via existing sewer service stub that had been used for existing home.
|
Routing PW Drainage | 11/27/2019 | | 11/27/2019 | | FAIL |
|
|
|
need drainage letter
|
Intake Approval | | | 11/25/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H.
|
Application received | | | 11/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2019 6:37AM
|
First Notice | | 8/14/2020 | | | |
|
|
|
|