INSP-Final Inspection | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Katie Marron
|
|
|
Permit Finaled. Previously noticed items have been completed satisfactory. New drops in electrical closet and south east corner OK. Riser annual inspection due this month and scheduled for 4/17. No signature card on site.
|
INSP-Sprinkler Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PART |
Katie Marron
|
|
|
Need City approved plans on site for verification of work completed. Consultation room and 12 new heads at new wall ok to cover. Noted missing coverage at existing electrical closet on north side and at southeast corner.
|
Permit Ready to Issue | | | 3/20/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/20/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/20/2015 | | 3/20/2015 | | DONE |
Kristal Soland
|
|
|
|
Sprinkler Plan Check | 3/19/2015 | | 3/19/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2015 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 3/18/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 3/18/2015 | | 3/18/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/18/2015 | | 3/18/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/18/2015 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 3/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2015 1:16PM
|