INSP-Sprinkler Rough-in | 6/23/2020 | 6/23/2020 | 6/23/2020 | P | PASS |
Troy Cobbley
|
|
|
Piping in first floor soffits is ok for cover.
Screened- Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PASS |
Troy Cobbley
|
|
|
Piping in the second floor soffits is ok for cover.
screened // MIke Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Troy Cobbley
|
|
|
Piping in the third floor soffits is ok for cover.
Screened- Tanner Phone #: ###-####
|
INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | CANC |
Troy Cobbley
|
|
|
Tanner Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/3/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/2/2020 | | 6/2/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
As Built Drawings - No Fee
|
Permit Ready to Issue | | | 6/2/2020 | | DONE |
|
|
|
**DO NOT REISSUE - AS BUILT**
|
Plan resubmittals received | | | 6/1/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/1/2020 | | 6/1/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 5/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Plans resubmitted without any changes from last submittal. Returned to applicant
|
Sprinkler Plan Check | 5/26/2020 | | 5/28/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 5/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
Emailed Bill with Alpine fire explaining what was need on as built drawings(attached in docs)
|
Plan assigned to (Stumbaugh) | 5/21/2020 | | 5/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
As builts
|
Plan resubmittals received | | | 5/21/2020 | | DONE |
|
|
|
as builts per Bill Corbit
|
INSP-Sprinkler Rough-in | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Troy Cobbley
|
|
|
Heat taped piping is ok for cover. Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | CANC |
Troy Cobbley
|
|
|
Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/6/2020 | 5/6/2020 | 5/7/2020 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed, heat tape/insulation complete. All piping can be covered. Screened- Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | FAIL |
Troy Cobbley
|
|
|
Need as-builts showing the pipe routing changes and pipe size changes, repair the tenting in two spots, relocate one overspaced pendant in the breezeway and repir two hangers on the first floor.
screened // Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Tanner Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | CANC |
Troy Cobbley
|
|
|
Cancel per point of contact. Tanner **Cleared** Phone #: ###-####
|
Plan resubmittals received | | | 3/31/2020 | | DONE |
|
|
|
|
Intake Approval | | | 3/31/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/31/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/31/2020 | | 3/31/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/31/2020 | | DONE |
|
|
|
Passed. No additional review comments.
|
Permit Ready to Issue | | | 3/31/2020 | | DONE |
|
|
|
Plan Mod Met
|
CHANGE STATUS TO (ISS) | | | 3/31/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/23/2020 | | DONE |
|
|
|
3-23-19: Returned to applicant. Inadequate information has been provided. Emailed specific requirements to Bill and suggested the installer provide detailed information on a seperate fire alarm application.
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
plan mod request via email see Doc_email
|
CHANGE STATUS TO (ISS) | | | 1/29/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/13/2020 | | DONE |
|
|
|
Bill requested the permit be re opened for a plan mod
|
Plan assigned to (Stumbaugh) | 1/13/2020 | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Sprinkler Plan Check | 1/13/2020 | | 1/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No New Devices
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number scheduled. Bill Phone #: ###-####
|
Sprinkler Plan Check | 12/2/2019 | | 12/3/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/3/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/3/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/22/2019 | | 11/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/23/2019 | | 10/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/23/2019 | | 10/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 2:52PM
|