Permit Information
Permit NumberFIR19-00815
StatusIssued
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 974 N MAPLE GROVE RD
Project NameROSEWOOD APT. BLD 10
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13R FIRE SPRINKLER SYSTEM IN THIS NEW APARTMENT BUILDING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro5/19/20205/19/20205/19/2020PPASS
DetailsTroy Cobbley
Hydro test witnessed with no visual pressure loss. Call James before heading out, thanks!
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/13/20205/13/20205/13/2020PFAIL
DetailsTroy Cobbley
Tower 1, left riser/north overhead hydro failed due to visible loss on the guage. The righ hand riser passed. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/11/20205/12/20205/13/2020AFAIL
DetailsTroy Cobbley
Tower 1, left riser/north overhead hydro failed due to visible loss on the guage. The righ hand riser passed. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro5/7/20205/11/20205/11/2020AFAIL
DetailsTroy Cobbley
Contact could not meet at the same time I could. Will need to be rescheduled. Overhead hydro, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in4/9/20204/9/20204/9/2020PPASS
DetailsTroy Cobbley
Rough-in passed. Tenting passed. Piping can be covered.
Re-inspection, as built is approved, FDC relocated. Please call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
CHANGE STATUS TO (ISS)  4/9/2020 DONE
Plan assigned to (Stumbaugh)4/7/2020 4/8/2020 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check4/8/2020 4/8/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/8/2020 DONE
DetailsMark Stumbaugh
Review Time 2 hr
No new devices
Permit Ready to Issue  4/8/2020 DONE
**PLAN MOD - DO NOT RE-ISSUE**
Plan Modification Accepted  4/7/2020 DONE
Work Flow requested to be opened for a plan mod
INSP-Sprinkler Rough-in4/1/20204/2/20204/2/2020PFAIL
DetailsTroy Cobbley
Provide plan mods indicating the actual pipe routing. Repair tenting. It appears the FDC needs to be relocated to the street side of the building. It is currently on the west side in the yard/land scaping.

Call James before heading out, rough and tenting inspection. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
Issue and Print Permit  11/12/2019 DONE
Sprinkler Plan Check10/29/2019 11/5/2019 PASS
DetailsMark Stumbaugh
1st review completed  11/5/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  11/5/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  11/5/2019 DONE
met
Application received  10/29/2019 DONE
Application submitted via PDS Online on Oct 29 2019 11:47AM
Intake Approval  10/29/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/29/2019 10/29/2019 DONE
DetailsMark Stumbaugh