Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR20-00016
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8000 S FEDERAL WAY
Project NameMicron C38193 B36 Tenant Imp.
Customer Number 
ePlanReviewYes
Description
This is a TI with Shilo to relocate/add the existing sprinkler head layout to accommodate the new wall and ceiling layout. This is the 1st floor of Area A only. There are three areas with a first and second floor in each area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/26/20205/27/20205/27/2020PPART
DetailsJim Page
Final fire sprinkler inspection for TCO phase 1 level 1 is complete.

Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/13/20205/13/20205/13/2020PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in south main entry complete, approved for cover.
INSP-Final Inspection5/12/20205/13/20205/13/2020PCANC
DetailsJim Page
Inspection was for level 2 TCO phase 1, this request is cancelled.

Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/30/20203/31/20203/30/2020ACANC
DetailsJim Page
Austin Farnworth is the contact for this Overhead Hydro Inspection. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro3/20/20203/20/20203/20/2020PDONE
DetailsJim Page
Hydrostatic test witnessed for area of work, no pressure loss observed.
INSP-Sprinkler Rough-in3/12/20203/13/20203/13/2020APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/25/20202/26/20202/26/2020APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.


Austin is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
Plan assigned to (Stumbaugh)1/15/2020 1/16/2020 DONE
DetailsMark Stumbaugh
paln mod per Roger see Doc email
Sprinkler Plan Check1/16/2020 1/16/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/16/2020 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  1/16/2020 DONE
plan mod met
CHANGE STATUS TO (ISS)  1/16/2020 DONE
Plan Modification Accepted  1/15/2020 DONE
plan mod request per Roger
Fees Due Hold1/14/2020 1/14/2020 DONE
Details
Sprinkler Plan Check1/9/2020 1/13/2020 PASS
DetailsMark Stumbaugh
1st review completed  1/13/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/13/2020 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  1/13/2020 DONE
met
Issue and Print Permit  1/13/2020 DONE
(F) Reprint permit  1/13/2020 DONE
Application received  1/9/2020 DONE
Application submitted via PDS Online on Jan 9 2020 8:52AM
Intake Approval  1/9/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/9/2020 1/9/2020 DONE
DetailsMark Stumbaugh