INSP-Final Inspection | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for TCO phase 1 level 1 is complete.
Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in south main entry complete, approved for cover.
|
INSP-Final Inspection | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | CANC |
Jim Page
|
|
|
Inspection was for level 2 TCO phase 1, this request is cancelled.
Austin Farnworth is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2020 | 3/31/2020 | 3/30/2020 | A | CANC |
Jim Page
|
|
|
Austin Farnworth is the contact for this Overhead Hydro Inspection. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed for area of work, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler complete, city approved plans have been notated with green highlighter/red ink areas approved for cover.
Austin is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan assigned to (Stumbaugh) | 1/15/2020 | | 1/16/2020 | | DONE |
Mark Stumbaugh
|
|
|
paln mod per Roger see Doc email
|
Sprinkler Plan Check | 1/16/2020 | | 1/16/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2020 | | DONE |
Mark Stumbaugh
|
|
|
No Fee
|
Permit Ready to Issue | | | 1/16/2020 | | DONE |
|
|
|
plan mod met
|
CHANGE STATUS TO (ISS) | | | 1/16/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/15/2020 | | DONE |
|
|
|
plan mod request per Roger
|
Fees Due Hold | 1/14/2020 | | 1/14/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2020 | | 1/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 1/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 1/13/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/13/2020 | | DONE |
|
|
|
|
Application received | | | 1/9/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 9 2020 8:52AM
|
Intake Approval | | | 1/9/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/9/2020 | | 1/9/2020 | | DONE |
Mark Stumbaugh
|
|
|
|