Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberFIR20-00062
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 7485 N LUCY ROSE LN
Project NameEAGLE HAWK APTS. BLD 2
Customer Number 
ePlanReviewYes
Description
TFSS TO INSTALL A NEW NFPA 13R FIRE SPRINKLER SYSTEM IN THIS NEW APARTMENT BUILDING.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/23/20206/24/20206/24/2020APASS
DetailsJim Page
Final fire sprinkler inspection is complete.

James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
CHANGE STATUS TO (ISS)  5/19/2020 DONE
Plan assigned to (Stumbaugh)5/11/2020 5/13/2020 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check5/13/2020 5/13/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  5/13/2020 DONE
DetailsMark Stumbaugh
Review Time 1hr
No new devices
Permit Ready to Issue  5/13/2020 DONE
Plan Mod Met
Plan Modification Accepted  5/11/2020 DONE
Nate requested to start a plan mod.
Fees Due Hold4/14/2020 4/15/2020 DONE
Details
INSP-Sprinkler Rough-in4/13/20204/13/20204/13/2020PFAIL
DetailsJim Page
Tenting has been altered by other trades in numerous areas, cover is not approved until tenting is corrected.

Tenting inspection, call James if issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro4/8/20204/9/20204/9/2020PDONE
DetailsJim Page
Hydrostaic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.

Overhead rough/hydro/tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in4/9/20204/9/20204/9/2020AFAIL
DetailsJim Page
Rough in inspection is complete, tenting has been removed by other trades in numerous areas, cover is not approved until tenting is corrected.
Issue and Print Permit  3/11/2020 DONE
Sprinkler Plan Check2/24/2020 2/26/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/26/2020 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  2/26/2020 DONE
met
Plan resubmittals received  2/24/2020 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check1/30/2020 2/7/2020 FAIL
DetailsMark Stumbaugh
1st review completed  2/7/2020 FAIL
DetailsMark Stumbaugh
Intake Approval  1/30/2020 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/30/2020 1/30/2020 DONE
DetailsMark Stumbaugh
Application received  1/29/2020 DONE
Application submitted via PDS Online on Jan 29 2020 2:01PM