BLD-Final | 10/19/2015 | 10/20/2015 | 10/20/2015 | A | PASS |
Jim Storey
|
|
|
Ready to final the project Landscaping is signed off and interior signage is installed. Call Richard 20 minutes in advance to meet you there. Thank you Phone #: ###-#### Inspection requested via web by Mike Wilson perm occ ok
|
BLD-Final | 8/27/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Jim Storey
|
|
|
|
FIRE-Alarm Testing | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Thomas Walsh
|
|
|
Test of the Area or Refuge system, located at the elevator lobbies (2), fo floors 3 thru 5. After several attampts of reprogramming some of the call centers, all devices tested satisfactorily.
|
BLD-Conference | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Jim Storey
|
|
|
Final walk on rooms 360, 460,, 356, 456, 350, 450 at 10 am Phone #: ###-#### Inspection requested via web by Mike Wilson pending 5th floor as directed.
|
FIRE-Conference | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | DONE |
Thomas Walsh
|
|
|
TCO prewalk inspection. Fire alarm and fire sprinkler systems tested and in-service up through the 4th floor (5th floor not ready yet). Both systems have minor punchlist items to addess. Egress and emergency lighting tested fully. The added EM light on the front exterior is temporary, otherwise this is complete. Fire access road to the east is usable and barricades should be removed. Scaffolding is being taken down, except for NW exterior, which allows egress and access to egress windows. Knox box has building keys installed. Fire extinguishers and EVAC plans are present. Area of Refuge comm. system still needs to be tested after phone lines are installed and operational. Fire is OK for TCO up to the 4th floor, while minor punchlist items are beig addressed., and the fire alarm and fire sprinkler systems remain in service at all times.
|
BLD-Final | 8/17/2015 | 8/18/2015 | 8/18/2015 | P | NR |
Jim Storey
|
|
|
finish the building walk on items to complete for Temp sign off 1 pm Phone #: ###-#### Inspection requested via web by Mike Wilson
|
FIRE-Final Inspection | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Thomas Walsh
|
|
|
Fire Life-safety inspection to inspect egress path for parking garage, and to ensure that exit signage and emerency lighting is adequate for this pathway. Tested OK for exit signage and EM lighting.
|
BLD-Final | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PART |
Jim Storey
|
|
|
start building final levels 1-4 Phone #: ###-#### Inspection requested via web by Mike Wilson c/n
|
FIRE-Final Inspection | 8/16/2015 | 8/16/2015 | 8/16/2015 | P | PART |
Thomas Walsh
|
|
|
Retest of emergency lighting to inspect problem units. All tested OK. Only emergency lighting not tested is parking garage, as egress path not painted yet. Fire sprinkler and fire alarm testing is completed. 5th floor fire alarm system not fully tested - units not ready yet. Offsite monitoring in place. Saffolding within aprking area still present - told this would be gone by Tuesday. Exterior scaffolding on the NW corner will remain, but should not affect egress or access to egress windows above. Fire access road is not completed, and may not be done by the time they are requesting TCO. I mentioned that steel plating maybe required, but this would have to be approved by the FD. FD acess road is not signed or painted yet. Address on the front of the building is not yet installed. Area of refuge comm. system not tested todate.
|
FIRE-Final Inspection | 8/15/2015 | 8/15/2015 | 8/15/2015 | P | PART |
Thomas Walsh
|
|
|
Test of exit signs and emergency lighting for new apartment building. A few emergency lights were added, and a few exit sings were repaired as needed. The parking garage emergency lighting was not tested due to the egress walking path not being indicated on the asphalt. An emergency light was added to the front lobby exit discharge, but this device is temporary. Other that that, exit signage and EM lights are OK. Fire extinguishers and EVAC plans are installed. There is still scaffolding in the center courtyard that will be removed prior to TCO.
|
BLD-Ceiling Grid Inspection | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Jim Storey
|
|
|
West side of parking garage ceiling inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson poduim ceilling ok to cover
|
BLD-Framing/Rough-in | 4/22/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Jim Storey
|
|
|
level 1 steel stud wall ; ceiling framing for drywall cover Phone #: ###-#### Inspection requested via web by Mike Wilson 3 floor exterior walls ok
|
BLD-Wall cover | 3/19/2015 | 3/20/2015 | 3/20/2015 | P | PASS |
Jim Storey
|
|
|
Verify the Fire Treated Ply on level 1 Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Framing/Rough-in | 3/16/2015 | 3/17/2015 | 3/17/2015 | P | PASS |
Jim Storey
|
|
|
level 1 Steel stud wall at P line Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Wall cover | 3/6/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Jim Storey
|
|
|
Level 1 steel stud exterior wall blocking inspection for exterior sheathing Phone #: ###-#### Inspection requested via web by Mike Wilson lobby exterior walls ok to cover
|
BLD-Energy code compliance | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Jim Storey
|
|
|
Vapor Barrier for level 1 slab on grade pour in Front lobby area. Concrete pour is Friday 19th Phone #: ###-#### Inspection requested via web by Mike Wilson ok to cover
|
BLD-Concrete | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PART |
Jim Storey
|
|
|
Last PT deck pour scheduled for 10/24 at 2:30am. Special inspection by Strata Phone #: ###-#### Inspection requested via web by Mike Wilson si report pending
|
BLD-Concrete | 10/7/2014 | 10/9/2014 | 10/9/2014 | A | PASS |
Jim Storey
|
|
|
Post Tension deck Pour #3 scheduled for Thursday night at 12:00 am, 700+ yds, Strata has special inspections Phone #: ###-#### Inspection requested via web by Mike Wilson firi pending
|
BLD-Concrete | 9/24/2014 | 9/29/2014 | 9/29/2014 | A | PEND |
Dave Hannah
|
|
|
Concrete deck pour #2 is schedule for Monday at Midnight, special inspection by Strata Phone #: ###-#### Inspection requested via web by Mike Wilson strata on site covering spec inspection
|
BLD-Concrete | 9/8/2014 | 9/9/2014 | 9/16/2014 | P | PASS |
Dave Hannah
|
|
|
Level 2 podium deck pour inspection, Concrete deck pour is scheduled for 9/11 @ 1am Mike WIlson Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Foundation | 7/30/2014 | 7/31/2014 | 7/31/2014 | P | PASS |
Jim Storey
|
|
|
Concrete at 2pm, pouring 3 concrete shear walls ; 10 Columns, Strata has special inspection Phone #: ###-#### Inspection requested via web by Mike Wilson
|
BLD-Foundation | 7/24/2014 | 7/25/2014 | 7/25/2014 | P | PASS |
Jim Storey
|
|
|
Footings and Concrete Column pour at 2:00 pm Phone #: ###-#### Inspection requested via web by Mike Wilsonsi pending
|
BLD-Footing | 7/23/2014 | 7/24/2014 | 7/24/2014 | P | PASS |
Phil Shearer
|
|
|
Concrete at 2 pm, 80 yards in footings Phone #: ###-#### Inspection requested via web by Mike Wilson per specail inspection
|
BLD-Footing | 7/18/2014 | 7/21/2014 | 7/21/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Wilsonsi ok seast 1/4
|