BLD-Final | 8/26/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Dave Hannah
|
|
|
Tower 4 and building final Phone #: ###-#### Inspection requested via web by Tim Toups
|
FIRE-Final Inspection | 8/26/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Thomas Walsh
|
|
|
Final fire and life satey inspection for Tower 4 portion of the building, including the east side parking garage. Tested exit signs and emergency lights for these areas. A few exit signs were added to improve locations of exits in the garage. EM lighting tested OK. EVAC plans were installed in all units for this portion of the building. Fire extinguisers are installed. Fire sprinklers and fire alarm systems have been finaled. Areas of Refuge call systems(all elevators) were tested and all answered by lobby staff, or by monitoring company.
|
BLD-Other | 8/19/2015 | 8/20/2015 | 8/20/2015 | P | PART |
Dave Hannah
|
|
|
Life Safety for all of tower 3 and tower 4 corridors for egress. Phone #: ###-#### Inspection requested via web by Tim Toups ok to occ tower #3
|
FIRE-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PART |
Thomas Walsh
|
|
|
Fire and Life-Safety inspection for use of Towers 3 & 4 corridors and stair 2 to egress these towers down to grade. Tested exit signs and EM lights for all floors - Tested OK. Two exit signs need to be added between Towers 2 & 3 at floors 2 and 3. All stairwell doors and unit doors opening into the fire rated corridors for these two towers (all floors) need to be maintained closed and latched, in order to maintain the integrity of the corridor. GC talked to security to help maintain. Inspection of units for Tower 4 not completed yet.
|
BLD-Final | 8/18/2015 | 8/18/2015 | 8/20/2015 | P | PART |
Dave Hannah
|
|
|
Fitness center Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to occ
|
BLD-Other | 8/17/2015 | 8/18/2015 | 8/19/2015 | P | NR |
Dave Hannah
|
|
|
Life safety for balance of tower 3 Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
FIRE-Final Inspection | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | CANC |
Thomas Walsh
|
|
|
Fire life-safety inspection was called in for Tower 3 portion of the building, however for use and access to Tower 3 units, residents would have to have egress through Tower 4 corrdior to access th e southeast stairway. Tower 4 corridor is not complete yet, as most unit doors, which are fire/smoke assemblies, do not have their door hardware installed. Therefore Tower 4 corrdior is not complete, and Tower 3 units cannot be used until it is completed.
|
BLD-Other | 8/13/2015 | 8/14/2015 | 8/17/2015 | P | PART |
Dave Hannah
|
|
|
Life Safety for Unit 514 ; 515 in tower 3 Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
FIRE-Final Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PART |
Thomas Walsh
|
|
|
Inspection to add two units on the fifth floor to TCO area (units 514 and 515). Fire sprinklers and fire alarm devices inspected and OK for these units. A temp. wall and door assembly to be constructed in the corridor to prevent residents from going into construction zone.
|
BLD-Framing/Rough-in | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | PASS |
Dave Hannah
|
|
|
Elevator # 2 lobby soffits at each floor Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 7/13/2015 | 7/13/2015 | 7/13/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 4 shaft wall Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 7/9/2015 | 7/10/2015 | 7/13/2015 | A | PART |
Dave Hannah
|
|
|
Dave, please be on site between 10 and 11am. Thank you Phone #: ###-#### Inspection requested via web by Tim Toups
|
FIRE-Final Inspection | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PART |
Thomas Walsh
|
|
|
TCO inspection for Towers 1 and 2, including exit signs, emergency lights, fire extinguishers, etc. for partial occupancy for this portion of the building. Fire sprinklers and fire alarm system testing for this area is completed. A temporary one-hour wall and fire door separates towers &/2 from towers 3&4. Unit EVAC plans are currently being made up and are pending. OK to occupy Towers 1 & 2 - all floors.
|
BLD-Conference | 7/9/2015 | 7/9/2015 | 7/10/2015 | P | PEND |
Dave Hannah
|
|
|
Dave, this is a pre-walk inspection for tower 1 ; 2. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Dave Hannah
|
|
|
No show for Monday, this is a re-schedule. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 7/6/2015 | 7/6/2015 | 7/7/2015 | P | CANC |
Dave Hannah
|
|
|
Tower 4, podium level unit soffits and corridors. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 7/2/2015 | 7/2/2015 | 7/6/2015 | P | PEND |
Dave Hannah
|
|
|
Dave, can you come between 10 - 12? Call if you have questions. Thanks Phone #: ###-#### Inspection requested via web by Tim Toups
|
FIRE-Final Inspection | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PART |
Thomas Walsh
|
|
|
Fire life/Safety inspection for the area where they want TCO, including the podium level units (5 total) along the west/south corner, including the parking garage on the north side only. Egress, emerg. lighting, fire extinguishers, were inspected for these areas. Fire alarm and fire sprinklers for these areas have also been.Found two emergency lights that need repair - one exit sign above the main door in the lobby, and one emerg. light on the southwest satirwell exterior. Evac signs are needed prior tooccupancy.
|
BLD-Conference | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | DONE |
Dave Hannah
|
|
|
Dave, can you come between 10 - 12? Call if you have questions. Thanks Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 7/1/2015 | 7/1/2015 | 7/2/2015 | A | DONE |
Dave Hannah
|
|
|
See Carl Benjamin Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Dave Hannah
|
|
|
Pool deck framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 6/26/2015 | 6/29/2015 | 6/29/2015 | A | DONE |
Dave Hannah
|
|
|
With Carl Benjamin Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 6/26/2015 | 6/26/2015 | 6/29/2015 | P | DONE |
Dave Hannah
|
|
|
Please see Carl Benjamin for conference. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PASS |
Dave Hannah
|
|
|
4th ; 5th floor corridor soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 6/24/2015 | 6/24/2015 | 6/25/2015 | P | PASS |
Dave Hannah
|
|
|
Lobby Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 6/19/2015 | 6/19/2015 | 6/19/2015 | A | PASS |
Mike Jordan
|
|
|
Maintenance room 118, stair well #2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 6/16/2015 | 6/16/2015 | 6/16/2015 | A | PASS |
Dave Hannah
|
|
|
3rd floor tower 4 soffits. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 6/12/2015 | 6/15/2015 | 6/16/2015 | P | NR |
Dave Hannah
|
|
|
3rd floor tower 4 soffits. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 6/12/2015 | 6/15/2015 | 6/16/2015 | P | PASS |
Dave Hannah
|
|
|
Tower 2 trash chute room at garage Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | NR |
Dave Hannah
|
|
|
3rd floor tower 4 unit soffits and garage soffit at south end. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 6/8/2015 | 6/10/2015 | 6/11/2015 | A | PASS |
Dave Hannah
|
|
|
4th floor tower 4 soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Dave Hannah
|
|
|
5th floor Tower 4 corridor soffit Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | NR |
Dave Hannah
|
|
|
Tower 4 soffits and fire caulk at 2 hour wall Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Mike Jordan
|
|
|
Garage soffit ( North west section) and stair well # 2. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Mike Jordan
|
|
|
Tower 1, Two hour mech shaft Phone #: ###-#### Inspection requested via web by Tim Toups. Tower 1 mech shaft to bottom of roof deck ok for cover. Tower 4, floors 1 to 4 mech. shaft next to elvator, corridor side to bottom of floor decks ok.
|
BLD-Framing/Rough-in | 5/22/2015 | 5/26/2015 | 5/26/2015 | A | PASS |
Mike Jordan
|
|
|
Tower 1, 2 hour Mech. shaft Phone #: ###-#### Inspection requested via web by Tim Toups. Verified 2hr. mech. shaft construction to bottom of roof deck.
|
BLD-Framing/Rough-in | 5/22/2015 | 5/26/2015 | 5/22/2015 | P | CANC |
Jim Storey
|
|
|
Two hour Mech shafts in tower 1 & 2 Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Conference | 5/21/2015 | 5/21/2015 | 5/22/2015 | P | DONE |
Dave Hannah
|
|
|
Fire egress conference Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/20/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Dave Hannah
|
|
|
Lobby lids, trash chutes. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Dave Hannah
|
|
|
Fitness center framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | NR |
Dave Hannah
|
|
|
Podium level tower 3 unit soffits, trash chute tower 2. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/14/2015 | 5/15/2015 | 5/15/2015 | A | PASS |
Mike Jordan
|
|
|
Podium level corridor and unit soffits, stair tower 1 fire caulking Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/13/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Dave Hannah
|
|
|
3rd floor Tower 3 unit soffits and corridor Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | PASS |
Dave Hannah
|
|
|
5th floor tower 3 unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups 4th floor also
|
BLD-Wall cover | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PART |
Dave Hannah
|
|
|
4th ; 5th floor Tower 3 corridor ; unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups corridors ok but rooms not ready
|
BLD-Wall cover | 5/7/2015 | 5/7/2015 | 5/8/2015 | P | PASS |
Dave Hannah
|
|
|
Soffit framing in tower 1 at elevator 3 lobbies, soffit framing tower 3 corridors. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 5/7/2015 | 5/7/2015 | 5/7/2015 | A | NR |
Dave Hannah
|
|
|
Soffit framing at elevator #3 lobbies all floors. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection request for the Ceiling Grid in the Parking Garage Level 1. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PEND |
Dave Hannah
|
|
|
Review of mechanical shafts for 2hr rating at tower 1 ; 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/30/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Dave Hannah
|
|
|
Tower 4 elevator #2 mech shaft Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 4/29/2015 | 4/30/2015 | 5/1/2015 | P | PASS |
Dave Hannah
|
|
|
Review 2 hour shaft at roof penetration of trash chute ; mech chase Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 4/28/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Dave Hannah
|
|
|
Exterior shear at east elevation. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/28/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Dave Hannah
|
|
|
Common area on podium level Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PASS |
Dave Hannah
|
|
|
Common area at Podium level Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/27/2015 | 4/27/2015 | 4/28/2015 | P | PASS |
Dave Hannah
|
|
|
Elevator # 2 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower 4, 2nd and 3rd floor insulation. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/22/2015 | 4/23/2015 | 4/24/2015 | P | PEND |
Dave Hannah
|
|
|
Inspection request for the Shaft Wall openings at Towers 1, 2 and 3. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/22/2015 | 4/24/2015 | 4/23/2015 | P | CANC |
Jim Storey
|
|
|
Inspection request for Tower 4, Floors 2 and 3 Insulation East Elevation. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin Inspection cancelled from web by: Carl Benjamin
|
BLD-Conference | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PASS |
Dave Hannah
|
|
|
This inspection request is for an AM preferably at 11:30AM. Tower 4, East Elevation at 2nd and 3rd floor for Framing and Energy Seal. Tower 4, East Elevation 5th floor Insulation. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Tower 4, East elevation 4th floor Framing and Energy Seal. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall Bracing | 4/21/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 3 East elevation Exterior Shear Nailing Inspection. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/16/2015 | 4/17/2015 | 4/21/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 4, Floors 4 and 5 for Framing and Energy code East Elevation only. Tower 4, Floors 2 and 3 Insulation at West Elevation only. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin enery only ok to cover
|
BLD-Conference | 4/17/2015 | 4/20/2015 | 4/21/2015 | A | NR |
Dave Hannah
|
|
|
This inspection is really for the PM with the original scheduled inspection but the system will not allow for an added item. Tower 4, East Elevation 4th and 5th Floors for Energy Code and Framing for Insulation cover. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/17/2015 | 4/20/2015 | 4/21/2015 | P | DEFR |
Dave Hannah
|
|
|
Tower 3 East elevation Exterior Shear Nailing Inspection. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 4/20/2015 | 4/21/2015 | 4/20/2015 | P | CANC |
Jim Storey
|
|
|
Inspection request for Tower 4, 4th floor East elevation Framing and Energy Seal. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin Inspection cancelled from web by: Carl Benjamin
|
BLD-Ceiling Grid Inspection | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
5th floor tower 2 unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
Stair tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PART |
Dave Hannah
|
|
|
Elevator and stair #2 Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulate needs to add straping
|
BLD-Ceiling Grid Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
4th ; 5th floor tower 1 ; 2 corridor soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 4/14/2015 | 4/15/2015 | 4/16/2015 | A | PART |
Dave Hannah
|
|
|
4th ; 5th floor tower 1 ; 2 corridor soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/15/2015 | 4/15/2015 | 4/16/2015 | P | PART |
Dave Hannah
|
|
|
4th ; 5th floors tower 4 west half Phone #: ###-#### Inspection requested via web by Tim Toups 5th floor west side ok
|
BLD-Framing/Rough-in | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | PASS |
Dave Hannah
|
|
|
Podium ; 3rd floor tower 4 west framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | CANC |
Jim Storey
|
|
|
5th floor tower 2 Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Ceiling Grid Inspection | 4/11/2015 | 4/13/2015 | 4/14/2015 | A | CANC |
Dave Hannah
|
|
|
Unit soffits, 3rd floor tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Other | 4/14/2015 | 4/14/2015 | 4/14/2015 | A | NR |
Dave Hannah
|
|
|
Unit soffits, 3rd floor tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 1 mech. shaft Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/11/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Dave Hannah
|
|
|
Lobby insulation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/11/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Dave Hannah
|
|
|
5th ; 4th floor west units of tower 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 3 POD units at Podium level Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | PASS |
Dave Hannah
|
|
|
Lobby framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Dave Hannah
|
|
|
4th floor tower 2 soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Dave Hannah
|
|
|
3rd ; 4th floor POD units Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Dave Hannah
|
|
|
5th floor tower 2 soffits, 5th floor tower 3 POD units. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PASS |
Dave Hannah
|
|
|
Tower 3 POD unit framing of 3rd floor ; podium Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 3 POD framing at 2nd ; 3rd floors Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | NR |
Dave Hannah
|
|
|
5th floor tower 2 soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 4/1/2015 | 4/1/2015 | 4/1/2015 | A | PART |
Dave Hannah
|
|
|
Tower 3 POD all floors Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 3/30/2015 | 3/31/2015 | 4/1/2015 | P | PASS |
Dave Hannah
|
|
|
Tower 3 POD ceilings Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 4/1/2015 | 4/1/2015 | 4/1/2015 | A | PASS |
Dave Hannah
|
|
|
4th ; 5th floor POD unit framing. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Dave Hannah
|
|
|
Stair tower # 1, Lobbies at Elevator # 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 3/26/2015 | 3/26/2015 | 3/27/2015 | P | DONE |
Dave Hannah
|
|
|
Lobby wall types and fire rating Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | CANC |
Dave Hannah
|
|
|
Stair #1 framing Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Energy code compliance | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PASS |
Dave Hannah
|
|
|
Podium level tower 3 insulation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall Bracing | 3/20/2015 | 3/23/2015 | 3/23/2015 | A | PASS |
Dave Hannah
|
|
|
Exterior shear on elevator # 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Dave Hannah
|
|
|
3rd floor tower 3 insulation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Dave Hannah
|
|
|
Exterior shear tower 2 ; 3 east elevation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/18/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 2 north east elevation exterior shear, tower 3 podium level framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/17/2015 | 3/18/2015 | 3/19/2015 | A | PASS |
Dave Hannah
|
|
|
Framing at Lobby for pre-rock behind duct work. Framing at tower 3 podium level. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/13/2015 | 3/16/2015 | 3/16/2015 | A | PASS |
Dave Hannah
|
|
|
3rd floor tower 3 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 3/13/2015 | 3/16/2015 | 3/16/2015 | A | PASS |
Dave Hannah
|
|
|
4th floor tower 3 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Dave Hannah
|
|
|
Exterior shear at Fitness center ; south elevation of tower 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 3/11/2015 | 3/12/2015 | 3/13/2015 | P | PASS |
Dave Hannah
|
|
|
5th floor tower 3 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Dave Hannah
|
|
|
Tower 3 trash shoot framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
FIRE-Conference | 3/10/2015 | 3/11/2015 | 3/11/2015 | A | CANC |
Troy Cobbley
|
|
|
fire blocking foam - Carl Phone #: ###-####
|
BLD-Framing/Rough-in | 3/10/2015 | 3/10/2015 | 3/11/2015 | P | PASS |
Dave Hannah
|
|
|
4th floor tower 3 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | NR |
Dave Hannah
|
|
|
4th floor tower 3 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/9/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Dave Hannah
|
|
|
Exterior shear, east elevation, south end of tower 4. Elevator #1 wall framing. 5th floor tower 3, unit framing. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/3/2015 | 3/3/2015 | 3/6/2015 | P | PASS |
Dave Hannah
|
|
|
Interior shear at 2 hour wall between towers 3 ; 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PASS |
Dave Hannah
|
|
|
Exterior store front shear at stair #1. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PASS |
Dave Hannah
|
|
|
Insulation at 2 hour wall dividing tower 2 ; 3, insulation at 5th floor tower 3 roof drains. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/27/2015 | 3/3/2015 | 3/4/2015 | A | PART |
Dave Hannah
|
|
|
Exterior shear at towers 3 ; 4 west elevation Phone #: ###-#### Inspection requested via web by Tim Toup section by bldg split two panels all 4 levels
|
BLD-Energy code compliance | 2/26/2015 | 2/26/2015 | 2/27/2015 | P | PASS |
Dave Hannah
|
|
|
Insulation 2nd floor tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/26/2015 | 2/26/2015 | 2/27/2015 | P | PASS |
Dave Hannah
|
|
|
3rd floor tower 1 unit soffits at fire dampers Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 | A | NR |
Dave Hannah
|
|
|
3rd floor tower 1 unit soffits at fire dampers Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/24/2015 | 2/26/2015 | 2/26/2015 | A | NR |
Dave Hannah
|
|
|
Insulation 2nd floor tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/25/2015 | 2/25/2015 | 2/26/2015 | A | PART |
Dave Hannah
|
|
|
2,3,4, ; 5th floor Trash chutes in tower 2, 2 hr wall at stair # 1 Inspection requested via web by Tim Toups needs to rock room side in floor space of trash chutes . back of stair tower wall ok.
|
BLD-Conference | 2/23/2015 | 2/24/2015 | 2/24/2015 | A | PASS |
Dave Hannah
|
|
|
Review handrail requirements at concrete ramp in garage. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/20/2015 | 2/23/2015 | 2/24/2015 | A | PASS |
Dave Hannah
|
|
|
Framing rough in and NFPA code podium level tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulste
|
BLD-Wall cover | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PASS |
Jim Storey
|
|
|
Drywall at corridor lids in towers 3 ; 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor tower 2 insulation at ceiling only Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | NR |
Jim Storey
|
|
|
Drywall at corridor lids in towers 3 ; 4 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/18/2015 | 2/19/2015 | 2/19/2015 | P | NR |
Jim Storey
|
|
|
3rd floor tower 2 insulation at ceiling only Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Jim Storey
|
|
|
Exterior shear nail off at Lobby. Phone #: ###-#### Inspection requested via web by Tim Toups to podem level ok.
|
BLD-Framing/Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Jim Storey
|
|
|
Framing at patio decks of tower 3 ; 5 Phone #: ###-#### Inspection requested via web by Tim Toupsdecks ok
|
BLD-Wall cover | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Jim Storey
|
|
|
Drywall patch backs at fire dampers 5th floor tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor tower 2 ceiling insulation Phone #: ###-#### Inspection requested via web by Tim Toupsair seal ok
|
BLD-Wall cover | 2/16/2015 | 2/17/2015 | 2/17/2015 | A | NR |
Jim Storey
|
|
|
Exterior shear nail off at Lobby. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | DEFR |
Jim Storey
|
|
|
Framing at patio decks of tower 3 ; 4 Phone #: ###-#### Inspection requested via web by Tim Toups out of time
|
BLD-Energy code compliance | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor tower 2 , NFPA code at ceiling. Phone #: ###-#### Inspection requested via web by Tim Toups air seal to i joist ok
|
BLD-Wall cover | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Jim Sly
|
|
|
5th floor tower 2 lid at Pod 543 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Other | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Jim Sly
|
|
|
Roof sheathing of fitness center Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PART |
Jim Sly
|
|
|
Exterior shear west elevation of tower 3 Phone #: ###-#### Inspection requested via web by Tim Toups Ext. Shear Nailing......OK
|
BLD-Wall cover | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Jim Storey
|
|
|
3rd floor tower 2 framing/rough-in Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulate exterior walls only/ exterior sheer nailling north wall. 5 th floor damper ok to instal gyp ceilling tower 1#
|
BLD-Framing/Rough-in | 2/10/2015 | 2/10/2015 | 2/10/2015 | P | DEFR |
Jim Storey
|
|
|
Exterior shear panel nail off N/E elevation of tower 2.
Also need correction notice from yesterdays inspection at 4th and 5th floor dryer ducts. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 2/7/2015 | 2/9/2015 | 2/9/2015 | P | PART |
Jim Storey
|
|
|
3rd floor tower 2 framing/rough-in Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulate exterior walls only
|
BLD-Energy code compliance | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Jim Storey
|
|
|
Reinspect 4th floor tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 2/4/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Jim Storey
|
|
|
Insulation at 4th ; 5th floors of tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups east/north corner ok
|
BLD-Ceiling Grid Inspection | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Jim Storey
|
|
|
Re-inspection at 5th floor tower 1 units Phone #: ###-#### Inspection requested via web by Tim Toups ok to cover drops
|
BLD-Framing/Rough-in | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Jim Storey
|
|
|
Lobby framing Phone #: ###-#### Inspection requested via web by Tim Toups ok for exteriot walls to cover.
|
BLD-Framing/Rough-in | 2/3/2015 | 2/3/2015 | 2/3/2015 | P | PART |
Jim Sly
|
|
|
4th ; 5th floor east end of tower 2 Pod 440 ; 540 Phone #: ###-#### Inspection requested via web by Tim Toups All OK including fire stopping at tub drains. Need fix for missed bearing points of trusses above door headers......can see from corridoor side.
|
BLD-Conference | 1/30/2015 | 2/2/2015 | 2/2/2015 | A | NR |
Jim Storey
|
|
|
Intumescent Paint at structural steel Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 2/2/2015 | 2/2/2015 | 2/2/2015 | A | FAIL |
Jim Storey
|
|
|
5th floor tower 1 drop ceilings Phone #: ###-#### Inspection requested via web by Tim Toups c/n on site
|
BLD-Framing/Rough-in | 1/30/2015 | 2/2/2015 | 2/2/2015 | A | PASS |
Jim Storey
|
|
|
north exterior sheer ok to covergrid xx to i/ lobby roof and paripet ok to cover. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Ceiling Grid Inspection | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | FAIL |
Jim Storey
|
|
|
Fire caulking and drywall patch back in tower 1, 5th floor Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Jim Storey
|
|
|
5th floor tower 2 insulation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PART |
Jim Storey
|
|
|
Exterior shear nailing of south elevation tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PASS |
Jim Storey
|
|
|
4th floor tower 2 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 1/28/2015 | 1/29/2015 | 1/29/2015 | P | PASS |
Jim Storey
|
|
|
5th floor tower 2 insulation Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/28/2015 | 1/28/2015 | 1/29/2015 | P | PART |
Jim Storey
|
|
|
Exterior shear nailing of south elevation tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | PASS |
Jim Storey
|
|
|
5th floor tower 2 framing Phone #: ###-#### Inspection requested via web by Tim Toups as noted on site
|
BLD-Other | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | PASS |
Jim Storey
|
|
|
Mineral wool and fire caulking at stair # 3 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/22/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Jim Storey
|
|
|
Tower 4 roof and parapets, tower 2 patio decks, Lobby roof . Phone #: ###-#### Inspection requested via web by Tim Toups north exterior decks ok/ south roof ok w paripets ok to cover
|
BLD-Conference | 1/22/2015 | 1/23/2015 | 1/22/2015 | P | CANC |
Jim Storey
|
|
|
Tower 4 roof sheathing and parapets, tower 1 patio decks, Lobby roof and parapets. Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Framing/Rough-in | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | NR |
Jim Storey
|
|
|
Patio deck framing tower 2, Roof sheathing @ Lobby and tower 4, P-3 parapets. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/19/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Jim Storey
|
|
|
Exterior shear east elevation of tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups grid g 2 thru 5 exterior sheer south ok/grid 11 2 thur 5 sheer ok / corridor ceilling rock ok tower 2 2 thur 5 floors.
|
BLD-Conference | 1/14/2015 | 1/15/2015 | 1/15/2015 | P | PASS |
Jim Storey
|
|
|
Tower 3 parapets, roof sheathing east end tower 2 and elevator #1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 1/13/2015 | 1/14/2015 | 1/14/2015 | A | PART |
Jim Storey
|
|
|
stair 3# firestopping first floor/ conf on mailboxes wip ok fs/ mailbox design ok
|
BLD-Energy code compliance | 1/12/2015 | 1/13/2015 | 1/13/2015 | P | PASS |
Jim Storey
|
|
|
Stair/elevator shaft # 3 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | PASS |
Jim Storey
|
|
|
Framing tower at elevator ; stair #3 shafts Phone #: ###-#### Inspection requested via web by Tim Toups frame ok
|
BLD-Framing/Rough-in | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Jim Storey
|
|
|
Tower 3 roof sheathing Phone #: ###-#### Inspection requested via web by Tim Toups tower 2 and 3 roof deck ok to cover.
|
BLD-Energy code compliance | 12/30/2014 | 12/31/2014 | 12/31/2014 | P | PASS |
Jim Storey
|
|
|
Balance of podium level in tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PART |
Jim Storey
|
|
|
Framing 5th floor corridor of tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups c/n 5th floor rfi to corridor need detail for 1 hr protection elavation and wide flange beam.
|
BLD-Energy code compliance | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PASS |
Jim Storey
|
|
|
Insulation of 2nd floor tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups first 3 rms south to north.ok
|
BLD-Framing/Rough-in | 12/22/2014 | 12/23/2014 | 12/23/2014 | P | PASS |
Jim Storey
|
|
|
Tower 3 parapet framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 12/22/2014 | 12/23/2014 | 12/23/2014 | A | PASS |
Jim Storey
|
|
|
2nd floor of tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PASS |
Jim Storey
|
|
|
3rd floor tower 1 framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | DONE |
Jim Storey
|
|
|
5th floor tower 1 drywall. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Jim Storey
|
|
|
4th floor tower 1 insulation Phone #: ###-#### Inspection requested via web by Tim Toups up to 36/37
|
BLD-Framing/Rough-in | 12/9/2014 | 12/10/2014 | 12/10/2014 | P | PASS |
Jim Storey
|
|
|
4th floor of tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
FIRE-Sprinkler Rough-in | 12/10/2014 | 12/10/2014 | 12/10/2014 | A | DONE |
Forrest France
|
|
|
Rough-in at tower one 5th floor 531-537
|
BLD-Energy code compliance | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PASS |
Jim Storey
|
|
|
5th floor phase 1 ok
|
BLD-Energy code compliance | 12/9/2014 | 12/10/2014 | 12/9/2014 | A | CANC |
Jim Storey
|
|
|
Insulation 5th floor tower 1(north end) Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Energy code compliance | 12/8/2014 | 12/9/2014 | 12/9/2014 | A | PASS |
Jim Storey
|
|
|
Unit insulation at tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PART |
Jim Storey
|
|
|
Insulation/ Pre- drywall Phone #: ###-#### Inspection requested via web by Tim Toups 36 an 37 ok
|
BLD-Energy code compliance | 12/4/2014 | 12/8/2014 | 12/8/2014 | A | NR |
Jim Storey
|
|
|
Insulation/ Pre- drywall Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Energy code compliance | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Jim Storey
|
|
|
Fire caulking at tub/shower enclosures Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Jim Storey
|
|
|
Overview of today''s insp. w/Dave H. Phone #: ###-#### Inspection requested via web by Tim Toups 5th floor ok to cover walls
|
BLD-Framing/Rough-in | 12/2/2014 | 12/4/2014 | 12/4/2014 | A | PART |
Dave Hannah
|
|
|
Framing inspection tower 1 (5th floor only) Phone #: ###-#### Inspection requested via web by Tim Toups ok to insulate
|
FIRE-Alarm Testing | 12/1/2014 | 12/2/2014 | 12/3/2014 | A | DONE |
Forrest France
|
|
|
This request is for a Courtesy Fire Alarm Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
FIRE-Conference | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | DONE |
Forrest France
|
|
|
|
BLD-Conference | 11/25/2014 | 11/25/2014 | 11/28/2014 | P | CANC |
Forrest France
|
|
|
Courtesy Fire Alarm with Forrest France
Thank you, Phone #: ###-#### >> Inspection requested via web by Carl Benjamin Inspection cancelled from web by: Tim Toups
|
BLD-Conference | 11/25/2014 | 11/26/2014 | 11/28/2014 | A | PASS |
Dave Hannah
|
|
|
Patio soffit framing for pre-rock installation in tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 11/21/2014 | 11/24/2014 | 11/22/2014 | A | CANC |
Jim Storey
|
|
|
Final framing at all floors of tower 1 Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Carl Benjamin
|
BLD-Framing/Rough-in | 11/19/2014 | 11/21/2014 | 11/21/2014 | A | FAIL |
Jim Storey
|
|
|
Final framing at all floors of tower 1 Phone #: ###-#### Inspection requested via web by Tim Toups c/n for 5 and 4 tower 1
|
BLD-Conference | 11/17/2014 | 11/17/2014 | 11/17/2014 | P | PASS |
Jim Storey
|
|
|
Review fire rating requirements behind shower enclosures Phone #: ###-#### Inspection requested via web by Tim Toups double studs ok inlew of gyp corridor rm side
|
BLD-Framing/Rough-in | 11/10/2014 | 11/12/2014 | 11/12/2014 | A | PASS |
Jim Storey
|
|
|
Tower 1 parapet framing ; roof sheathing Phone #: ###-#### Inspection requested via web by Tim Toups exterior tower 1 ok/ roof tower 2 ok
|
BLD-Framing/Rough-in | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Jim Storey
|
|
|
Parapet ; roof sheathing on tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 11/10/2014 | 11/12/2014 | 11/10/2014 | A | CANC |
Jim Storey
|
|
|
Tower 2 parapet framing Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Framing/Rough-in | 11/6/2014 | 11/7/2014 | 11/7/2014 | P | CANC |
Jim Storey
|
|
|
Sheathing nail off of parapets (type P-3) on tower 2 Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 11/5/2014 | 11/6/2014 | 11/6/2014 | P | PASS |
Jim Storey
|
|
|
Tower 2, parapet framing at west end. Phone #: ###-#### Inspection requested via web by Tim Toups east and south exterior nailling and hardware ok up to parapet.
|
BLD-Framing/Rough-in | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PART |
Jim Storey
|
|
|
Re-inspect tower 1 parapet sheathing Phone #: ###-#### Inspection requested via web by Tim Toups roof side only ok
|
BLD-Framing/Rough-in | 10/24/2014 | 10/28/2014 | 10/28/2014 | P | FAIL |
Jim Storey
|
|
|
Tower 1 Roof parapet sheathing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 10/24/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Jim Storey
|
|
|
Tower 1 parapet framing Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 8/20/2014 | 8/21/2014 | 8/21/2014 | A | PASS |
Jim Storey
|
|
|
Wall framing inspection requested for the Podium Level. Intumescent Fire Paint inspection requested for the Common Area Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin area 1 1st floor walls ok
|
BLD-Conference | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PART |
Jim Storey
|
|
|
Request for Podium Level partial framing inspection. Requesting an 8am inspection. Please call to verify inspection time please!
Thank you, Phone #: ###-#### Inspection requested via web by Carl c/n posted for area #1 stair #3 gyp must have continuity for ratting of 2 hr . engineer to verify that osb can be removed to complet corner. 2/ missing joist hangers 224#/ 3 sheer wall washers and resolve bottom plate butt conection//4/ min 4 toe nails for studs to 3x plate/ 5 ceilling rated at unusable spaces to maintaine floor ceilling ratting./ need sheer aplaided to framing.
|