BLD-Final | 4/17/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Jim Storey
|
|
|
Craig Phone #: ###-####
|
FIRE-Final Inspection | 4/17/2015 | 4/20/2015 | 4/20/2015 | A | PASS |
Katie Marron
|
|
|
Fire life safety passed. All previous noticed items have been satisfactory completed.
|
BLD-Energy code compliance | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | CANC |
Jim Storey
|
|
|
Craig Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | FAIL |
Katie Marron
|
|
|
Emergency exit/egress lighting not functional. Ceiling tiles to be replaced and electrical receptacles to be covered in new open tenant space.
|
BLD-Framing/Rough-in | 3/27/2015 | 3/27/2015 | 3/30/2015 | P | PASS |
Dave Hannah
|
|
|
Approved set with store sup. - dimising wall framing & consult - Craig Phone #: ###-####
|
BLD-Wall Bracing | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PART |
Jim Storey
|
|
|
Craig-dry wall screw inspection Phone #: ###-#### need city aproved plans on site for insp.
|
BLD-Framing/Rough-in | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PART |
Jim Storey
|
|
|
Craig Phone #: ###-#### tennet wall one sde for progreestion of const ok
|