BLD-Ceiling Grid Inspection | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
Dave Hannah
|
|
|
Level 3 and Level 4 Corridors. Call Adam When heading to site.
Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 7/23/2020 | 7/27/2020 | 7/28/2020 | P | PART |
Dave Hannah
|
|
|
Coordinate visit with Mike Beeson, Adam off site. Level 2 and level 3 ceiling inspections for cover. Phone #: ###-#### Inspection requested via web by Adam Johnson 2nd fl ok
|
BLD-Wall cover | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Dave Hannah
|
|
|
Shafts and other. Call Adam when heading over. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | CANC |
Mike Jordan
|
|
|
Firestop assemblies, SE Shaft. Other areas outlined between Forte and ESI. Call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Mike Jordan
|
|
|
First floor fat grid framing, and back of house ceiling grid cover inspection Phone #: ###-#### Inspection requested via web by Mike Beeson.. 1st floor hardlid in lobby and eatry ok. back of house not ready.
|
BLD-Framing/Rough-in | 7/16/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Dave Hannah
|
|
|
Level 6, Level 5, Level 4 Shaft Wall Framing at SE Mechanical Shaft. Call Adam to coordinate time and details for site visit. COVID Protocols in place to clear the areas before arrival. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 7/2/2020 | 7/6/2020 | 7/6/2020 | P | PART |
Brandon Shaw
|
|
|
East Shaft at level 7, level 6. Late PM if Possible. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Dave Hannah
|
|
|
7th Floor, fire stop at ceilings, 6th Street Side. Call adam when heading to site. Will provide garage access. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PART |
Dave Hannah
|
|
|
7th Floor Framing walk, FIrestop assemblies. Call Adam before heading to site. 30 min as discussed for Covid preparation. Phone #: ###-#### Inspection requested via web by Adam Johnson part south side rooms ok
|
BLD-Conference | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | DONE |
Dave Hannah
|
|
|
Conference in ESI office to discuss the following: -FFE and Hotel Staging -Overall Inspection Tracking -Linen Chute at Level 7 ESI Crew will be masked while visiting in the field office. Please call Adam when heading this way. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | PASS |
Dave Hannah
|
|
|
2nd Floor Corridor at Stair tower. Additional items. list will be available, call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Dave Hannah
|
|
|
Level 6 Secondary Framing. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/11/2020 | A | PART |
Dave Hannah
|
|
|
Fire Caulking at Level 6, 6th Street side. Call Adam when heading to site. Thanks AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PEND |
Dave Hannah
|
|
|
Elevator lobby shafts on 2 , 5 and 6 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 5/28/2020 | 6/1/2020 | 6/1/2020 | A | PASS |
Dave Hannah
|
|
|
Pool area cover/ 5th floor Fire assembly/fire caulking Call Adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Mike Jordan
|
|
|
Level 5 fur downs at rooms 6th. st. south only ok. Pool room exterior wall insulation ok, 1st. level.
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Dave Hannah
|
|
|
Complete L4, front street side of bathroom assemblies at ceiling. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 5/11/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Dave Hannah
|
|
|
First floor and 7th floor insulation Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 5/6/2020 | 5/6/2020 | 5/7/2020 | P | PART |
Dave Hannah
|
|
|
Level 3, 6th street rework of fire stops per yesterdays inspections. Call Adam when heading to site. AKJ ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson need enfo on 3inch pvc fire stopping and fix two spots on shafts plumbing interferace
|
BLD-Framing/Rough-in | 5/5/2020 | 5/5/2020 | 5/6/2020 | P | PART |
Dave Hannah
|
|
|
Level 3 Fire Caulking, 6th street corridor. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Dave Hannah
|
|
|
Level 3 framing at 6th street cooridor. Firestop at soffit overbuilds. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 4/22/2020 | 4/22/2020 | 4/23/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection walk of hotel secondary framing, firestop assemblies, and other areas for cover. Final list generated, call Adam when heading to the site. AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Dave Hannah
|
|
|
2nd floor recheck of 2" tub drains in soffit framing. If possible, Level 5 Electrical Room at Mech Shaft. (Shaft wall assembly). Coordinate with Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Energy code compliance | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Dave Hannah
|
|
|
Ongoing cover inspections. List TBD at time of walk with Adam/ Mike. Call when heading to site. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 4/13/2020 | 4/13/2020 | 4/13/2020 | A | PASS |
Dave Hannah
|
|
|
Putty packs level 6 and secondary framing level 2. Call Adam before heading to site. Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 4/6/2020 | 4/7/2020 | 4/8/2020 | P | PASS |
Dave Hannah
|
|
|
Walk Level 4 insulation, 6 insulation. Putty packs on L6. Look at MECH shafts, follow up to emailed pictures. Call Adam 30 minutes in advance to clear the inspection areas. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Dave Hannah
|
|
|
Level 5 Putty Packs. Verify install before insulation. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to insulate 5th flr and reck hallway
|
BLD-Conference | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PASS |
Dave Hannah
|
|
|
Revised TCO Plan - Rev 1.1, Level 7 Garage. Call Adam when heading to site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for new tco
|
BLD-Conference | 3/30/2020 | 3/30/2020 | 3/31/2020 | P | DONE |
Dave Hannah
|
|
|
Inspection walk. Adam Defining scope for todays walk. Call Adam when heading to site.
Putty Packs Insulation secondary Framing at bathrooms. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 3/30/2020 | 3/30/2020 | 3/31/2020 | A | PART |
Dave Hannah
|
|
|
2nd floor shaft walls and insulation on Level 4 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Wall cover | 3/25/2020 | 3/25/2020 | 3/26/2020 | P | PASS |
Dave Hannah
|
|
|
Hotel, Level 3 insulation for cover. Level 4 putty packs, pre insulation. Thanks, AKJ. Call adam when heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Wall cover | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PART |
Dave Hannah
|
|
|
Ongoing framing inspection. Walk items as they are ready for inspection. Call adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok up to 411
|
BLD-Wall cover | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Dave Hannah
|
|
|
Hotel insulation, putty packs, close walls on L-3 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### level 2 ok to cover level 3 ok to insulate
|
BLD-Framing/Rough-in | 3/17/2020 | 3/17/2020 | 3/18/2020 | P | PART |
Dave Hannah
|
|
|
2nd Floor Framing, 224 down, putty pack verification, framing cover. Call Adam when heading to site. ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson 0k up to room 206
|
BLD-Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Dave Hannah
|
|
|
Phase 1 TCO Final inspection walk.Call Adam to coordinate. ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco
|
FIRE-Final Inspection | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO phase 1 complete, signatures provided for associated trades on the Phase 1 TCO permit sign of card.
Fire final for Phase 1 TCO. Call Adam to coordinate. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Dave Hannah
|
|
|
Level 2 West Room Inspections, putty packs installed. Ready for Cover. Call Adam when heading to site. AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson first 5 roomsup to 219 ok to cover
|
BLD-Framing/Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Dave Hannah
|
|
|
Level 3 and level 4 hotel framing at corridor for cover. Ongoing cover inspections. Call Adam when heading to site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | NR |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Wall cover | 3/6/2020 | 3/9/2020 | 3/10/2020 | P | NR |
Dave Hannah
|
|
|
2nd floor cover in guestrooms and corridors, Corridors level 3-6 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Final | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | CANC |
Brandon Shaw
|
|
|
Phase 1 TCO final review and inspection walk for Fire Life Safety, Walk About. AM and PM slot reserved pending final Electrical and FLS walks respectively. akj
Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Final | 3/6/2020 | 3/6/2020 | 3/6/2020 | A | CANC |
Brandon Shaw
|
|
|
Phase 1 TCO final review and inspection walk for Fire Life Safety, Walk About. AM and PM slot reserved pending final Electrical and FLS walks respectively. akj
Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | FAIL |
Jim Page
|
|
|
Provide emergency egress public way lighting on nothwest stairwell at level 1 discharge as discussed. Provide proper freeze protection for dry pipe valve stairwell, southeast side. Install glass in fire rated doors from hotel section too garage. Dry system trip times for level 1 and 6 not met, no other dry systems were tested, sprinklers cannot be signed off for phase 1 until trip times are met. Inspection stopped due too defeciencies.
Phase 1 TCO final review and inspection walk for Fire Life Safety
Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Conference | 3/6/2020 | 3/6/2020 | 3/6/2020 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, no generator transfer performed due to other defeciencies that stopped inspections.
Emergency lighting test of genset system with ESI and RME Crew. Preferably late morning, after 10:00 am.
Call adam when heading to the site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Dave Hannah
|
|
|
First floor back of house cover inspection Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Dave Hannah
|
|
|
Roof framing Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson soffits / hardlids garage ok to cover
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | DONE |
Tell Riley
|
|
|
Stairwell review Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Framing/Rough-in | 11/18/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD-Conference | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/30/2019 | 10/30/2019 | 11/6/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Beeson 2nd and 3rd floor ok ground floor ok to cover top4ft of walls
|
BLD-Conference | 8/13/2020 | 8/14/2020 | | P | |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|