Permit Information
Permit NumberFIR13-00167
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1000 W MYRTLE ST
Project NameBelow Grade Parking Garage
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of the below grade parking garage including the water supply and pump. There are 4 dry pipe zones in the garage with all wet pipe to be heat traced to protect from freezing.

Notice:
The provided owner’s certificate indicates the space will be used as a parking garage. However, in the future the space may be used to store or handle hazardous materials. This review is based on the space being used as a parking garage ONLY. In the future if, the space is used to store or handle hazardous materials, a COMPLETE RESUBMITTAL IS REQUIRED.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/21/201711/21/201711/21/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in/Hydro9/28/20169/29/20169/29/2016PPASS
DetailsJim Page
Hydrostatic test complete for Dry system 6 and eastside hose valve system.
INSP-Sprinkler Rough-in/Hydro9/27/20169/28/20169/28/2016PPASS
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping garage dry system 5 complete. 200 psi hydrostatic test for garage dry systems 5 and 7 complete
INSP-Sprinkler Rough-in/Hydro9/26/20169/27/20169/27/2016PCANC
DetailsJim Page
This inspection request was for 28SEPT2016, this inspection request is cancelled and a new inspection request will be generated for the correct day.
INSP-Sprinkler Rough-in9/8/20169/14/20169/14/2016ACANC
DetailsJim Page
Inspection request will be completed during hydrostatic testing per conversation with point of contact, Jeff phone number ###-####.
INSP-Sprinkler Rough-in9/8/20169/13/20169/13/2016ACANC
DetailsJim Page
Inspection request will be performed on 14SEPT2016.
INSP-Sprinkler Rough-in9/8/20169/12/20169/12/2016ACANC
DetailsJim Page
Inspection will be performed on a later inspection request, inspection request reshedule has been coordinated with job foreman (Jeff ###-####). Shilo will call to schedule the inspection request for coordinated day.
INSP-Sprinkler Rough-in8/30/20168/31/20168/31/2016APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above restroom hardlids in basement level and level one complete, overhead fire sprinkler piping located above hardlids at basement level and level 1 approved for cover.
INSP-Final Inspection7/10/20157/10/20157/10/2015PPASS
DetailsThomas Walsh
Testof the four (4) dry pipe systems protecting the underground parking garage, including fire alarm interface of low-air, waterflow and tampers. and trip tests of the dry-pipe valves. All tested satisfactorily.
NOTE: FDC on 11th street not functional yet. to be hydrotested and flushed.
INSP-Final Inspection7/2/20157/7/20157/7/2015PPASS
DetailsThomas Walsh
Flush test of the FS U/G supply line from the 11th street connection to the pump header (pump was bypassed). Flushed clear after 2 attempts.
OK to connect this supply line to the pump suction feed main.
INSP-Sprinkler Rough-in/Hydro7/7/20157/7/20157/7/2015PPASS
DetailsThomas Walsh
Completion of 24 hour air test of four (4) dry pipe valves located in the U/G parking garage. All PASSED.
INSP-Sprinkler Rough-in/Hydro7/2/20157/6/20157/6/2015PCANC
DetailsThomas Walsh
This is the wrong permit # called in for a diferent part of the building. See FIR 13-00725 for the proper permit and the inspection for today (7/6).
INSP-Sprinkler Rough-in7/2/20157/6/20157/6/2015PPART
DetailsThomas Walsh
24 hour air test of four (4) dry pipe valves located in the U/G parking garage, including the water room, pump room and two systems supplying the north end PG. All measured 43 psi @ 11:30am. Will retest tomorrow - same time to ensure pass.
Also hydrotest - 200 psi @ 2 hrs - for dry pipe valve supplying two different hose valves in the PG. - PASSED
INSP-Sprinkler Rough-in/Hydro7/1/20157/2/20157/2/2015APASS
DetailsThomas Walsh
Hydrotest of four (4) of the U/G parking garage dry pipe systems, and three (3) dry pipe systems serving the abovegrade stairs of stairs C1, B2, and B1. All passed the 200 psi @ 2 hrs. test.
INSP-Sprinkler Rough-in/Hydro6/29/20157/1/20157/1/2015ACANC
DetailsThomas Walsh
Wrong permit called in for this inspection. See FIR13-00725 for inspections completed today (7/1).
INSP-Sprinkler Rough-in/Hydro6/30/20156/30/20156/30/2015PPASS
DetailsThomas Walsh
Hydrostatic test of FS U/G supply line from 11th St. city connection to main BFP in basement riser room. PASSED
INSP-Sprinkler Rough-in/Hydro6/19/20156/19/20156/19/2015PPEND
DetailsThomas Walsh
Recieved pump report from fire pump rep., stating the results from pump test on 6/17.
Report indicated that 150% test could not be performed. I informed Jeff (Shilo) that we would require the pump rep. conduct the next test to ensure that the pump is operating correctly, and that flows at the 150% of pump capacity can be obtained.
INSP-Sprinkler Rough-in/Hydro6/18/20156/18/20156/18/2015PCANC
DetailsThomas Walsh
Wrong permit called in for the systems inspected.
INSP-Sprinkler Rough-in/Hydro6/16/20156/17/20156/18/2015PPART
DetailsThomas Walsh
Initial fire pump test, witnessed by Tom Walsh and Tim Frost. Test was conducted at various flows, including no flow, 1000gpm and attempted to conduct 1500 gpm test, but could not flow this portion of the test, due to pressure regulator installed after the pump.
NOTE: Pump test will have to beconducted/ witnessed again when the generator and fire alarm systems interface is completed.
INSP-Sprinkler Rough-in/Hydro6/11/20156/12/20156/12/2015APART
DetailsThomas Walsh
Thrust block inspection of fire service underground supply line and FDC supply line for 11th street connection - hydrotest could not be conducted because city connection could not be made, due to a faulty connector. The contractor assumes all risk of burying pipe prior to hydrotest.
INSP-Sprinkler Rough-in6/11/20156/11/20156/11/2015PNR
DetailsThomas Walsh
Concrete thrust blocks not installed yet - will reschedule inspection, and probably hydrotest for tomorrow.
INSP-Sprinkler Rough-in6/9/20156/10/20156/10/2015PCANC
DetailsThomas Walsh
This is an underground to cover inspection. Concrete to arrive at 11:30am. We request a 12pm or 12:30pm inspection. Bryan is the contact for scheduling. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro6/9/20156/9/20156/9/2015PPASS
DetailsThomas Walsh
Hydrotest/inspection of above grade parking garage dry pipe systems for floors 3 and 4 - both PASSED
INSP-Sprinkler Rough-in5/28/20155/29/20155/29/2015APASS
DetailsThomas Walsh
FSUG flush of the 9th street feed main from city connection to parking garage bulk feed main (just before pump connection) - flushed clear after 2 attempts.
INSP-Sprinkler Rough-in/Hydro5/26/20155/26/20155/26/2015PPART
DetailsThomas Walsh
FS U/G hydrotest - 9th street connection. 200psi @ 2 hours - from PIV at street to first control valve in basement (8" x approx. 100ft.)
PASSED.
NOTE: 11th St. tie-in not tested yet.
INSP-Sprinkler Rough-in4/23/20154/24/20154/24/2015APART
DetailsKatie Marron
Underground 8" main from PIV to underground parking garage OK to cover. Main has 4' of coverage at PIV due to location of united water's main, and then drops to over 5' of coverage at bldg connection.
INSP-Sprinkler Rough-in4/15/20154/16/20154/16/2015PNR
DetailsKatie Marron
Not ready for inspection per phone conversation from Contractor. Pending PIV location determination.
INSP-Sprinkler Rough-in4/15/20154/15/20154/15/2015PCANC
DetailsKatie Marron
Cancelled to be rescheduled per phone conversation with contractor.
INSP-Sprinkler Rough-in9/8/20149/9/20149/9/2014PCANC
DetailsForrest France
This is an ug to cover. John is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/16/20144/17/20144/17/2014APART
DetailsForrest France
Preliminary walkthrough of the basement level, temp standpipe, and project conditions.