INSP-Final Inspection | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Jim Page
|
|
|
Elevator recall complete, initiating devices in pump room, garbage room, mech room next too fire pump room and fire panel heat have been tested. Level 1 garage dry system and level 6 dry system alarm pressure switches reported to panel, all other monitoring devices will need to be tested after trip times are corrected on dry systems, no other fire alarm associated devices for fire sprinkler monitoring have been tested. Monitoring has been verified.
Coordinated with Sprinkler contractor for 9AM inspection, Buck Phone #: ###-####
|
INSP-Final Inspection | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | CANC |
Jim Page
|
|
|
Rescheduled for 9AM, 06MAR2020, this request is cancelled.
Buck Phone #: ###-####
|